NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Door Schedule
Document / 16 pages

Door schedule specifications, Office of Emergency Management, 1998

Machine-extracted title · confidence 95%

Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.

NYC-WTC_000173374–000173389

Folder label: “Door Schedule

Page image
Scanned page image, NYC-WTC_000173388
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1" W.G. Damper actuators (U.L. approved) and EP’s shall be provided by the damper manufacturer.

Dampers shall have a fusible link which melts on heat causing damper to close and lock in a close position.

2. Add paragraph 1.2.A. 11

Air conditioning units AC-4, AC-5 and AC-6 are equipped with the water side economizer coil. Provide an adjustable aquastat (set for 55°±) on condenser water supply line to activate free cooling mode. If free cooling operation cannot satisfy space load, mechanical cooling shall be activated.

SECTION 15190

1. Paragraph 1.3.B revised as follows:

130 GPM of water from 99.8°F to 84.4°F at 78°F wet bulb.

2. Paragraph 1.3.C revised as follows:

change: “galvanized steel” to “stainless steel.”

3. Paragraph 1.3.D

add: “Provide a variable pitch fan drive.”

4. Paragraph 1.3.F

change: “PVC” to “galvanized.”

5. Paragraph 1.3.G

change: “2 HP pump motor”... to “1-1/2 HP pump motor.”

6. Paragraph 1.3.H

change: “.... Specially formulated PVC to “galvanized steel.”

7. Paragraph 1.3.0

Delete in its entirety.

8. Paragraphs 1.4.A.11

NYC-WTC_000173388

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173388Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗
Security system specification excerpt, May 1998 · Box 7DCAS

NYC-WTC_000173219

Technical specification document detailing end-of-line resistor wiring requirements for the Mayor's Office of Emergency Management security system.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗
Addendum #1 to specifications, May 1998 · Box 7DCAS

NYC-WTC_000173205

Transmittal letter for Addendum #1 modifying project specifications and drawings for the Mayor's Office of Emergency Management at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Similar indexed content

Compare copies and versions →