NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 World Trade Center Mayors Office of Emergency Management Plan Review
Document / 8 pages

Plan Review Comments, 7 World Trade Center, 1998

Machine-extracted title · confidence 90%

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

NYC-WTC_000173475–000173482

Folder label: “7 World Trade Center Mayors Office of Emergency Management Plan Review

Page image
Scanned page image, NYC-WTC_000173478
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C. DWG. M 1.23:

1. CW flow diagram does not conform to the floor plan. All zoning automatic valves must be shown correctly on floor plan. Provide an automatic valve operating sequence schedule on drawing with collaborating designations on the floor plans.

2. The AC units are balanced to receive only fixed amounts of water under normal operations, based upon using a 11F delta condenser water, but a 19F delta- T using the emergency tower would result in lower flow rates through the same units. Such lower flow rates would certainly reduce cooling capacities of the units, if not Immediate malfunctioning. Please review and verify.

3. Provide house keeping pads for condenser water pumps.

4. Provide a detail to show bottom of plenums pitch toward to prevent Infiltration.

5. Sequence of operation for condenser water system and fan power boxes.

D. DWG.M4.01:

1. Complete ventilation Index as per Port Authority standards.

2. Indicate minimum setting for alt VAV Boxes.

3. Provide a cooling tower schedule and details.

4. The tower specification shows an operating range of 19F delta-T, from 89F to 108F for 130 GPM each. The AC unit schedule shows 12.5F delta-T for three units and 11F delta-T for other new units. There is no sufficient data presented in these drawings to evaluate that this arrangement would work out under the emergency condition. (Also see related comments above.) All new units should be selected to operate adequately under emergency conditions. 5. Adi AC units should be provided with temperature and pressure gauges.

6. Specify vibration isolators in the pump schedule.

8. Provide FSD details. Gate type fire damper no longer complies with the code. VAV’s not Building Standard

NYC-WTC_6oO 173478

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173478Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Plan Review Comments for 7 WTC, April 1998 · Box 7DCAS

NYC-WTC_000169716

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.941

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168712 · Box 7DCAS

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

Similar indexed content

NYC-WTC_000169716 · Box 7DCAS

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

Similar indexed content

Compare copies and versions →