Plan Review Comments, 7 World Trade Center, 1998

Machine-extracted title · confidence 90%

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

NYC-WTC_000173475–000173482

Folder label: “7 World Trade Center Mayors Office of Emergency Management Plan Review

Page image
Scanned page image, NYC-WTC_000173477
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ALL H.V.A.C UNITS TO BE J.C.I METASYS BMS

B. Dwg. M1.07:

1. Emergency generator installation detail Is not correct. The exhaust pipe does not go to the roof of the building. Remove all references to roof as appropriate.

2. Generator exhaust pipes are shown to be terminated at the exhaust air plenum only. Since there is no specification provided specially for the exhaust plenum, we assume it is normal gauge sheet mefol. Please consider the following:

a. Exhaust pipes and mufflers are more than 900 F when the engines are running. Provide a detail to ensure proper sealing between the pipes and foe plenum at all temperature fluctuations. Otherwise, fumes would leak back into the building.

b. Provide calculation to prove that foe mix air of 900-degree engines exhaust and radiator exhaust is within the operating temperatures of normal sheetmetal plenum insulation and would create deformity to existing aluminum louvers along the building. Otherwise, please also consider venting exhaust pipe directly to outside, in a manner approved by foe Owner and Code compliance.

3. Please clarify why a circulating pump is required in foe fuel oil day tank. If it is meant to feed a header system, please provide details flow does it get mounted on foe day tank, its control schematics and how fois could be interlocked with foe rest of foe fuel oil system without creating over feeding conditions.

4. The entire engine exhaust piping and muffler should be vibration isolated (not specified) due to high velocity exhaust.

5. Exhaust pipes on floor plans have no size and are shown to have sharp 90- degree elbows. This will not work, as foe dynamic pressure of foe exhaust gas would destroy them. Please show long swing, smoofo-tuming, radius elbows instead. 6. Referenced to Architectural drawings, A-1-1: Provide a housekeeping pad for foe day tank. A curb may not be required since foe ta.ik is already had a leak proof basin on it. A curb may make cleaning around the tank difficult.

7. Leak detection for fuel and water to be at Johnson Controls Metasys.

NYC-WTC_000173477

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173477Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Plan Review Comments for 7 WTC, April 1998 · Box 7DCAS

NYC-WTC_000169716

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.941

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168712 · Box 7DCAS

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

Similar indexed content

NYC-WTC_000169716 · Box 7DCAS

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

Similar indexed content

Compare copies and versions →