Project cost summary with addenda and fees, 1998

Machine-extracted title · confidence 94%

Financial summary listing original bid, generator costs, electric tapping fees, and total project costs for a City facility upgrade.

NYC-WTC_000173113–000173114

Folder label: “Original Bid and Addendums

Page image
Scanned page image, NYC-WTC_000173114
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 212 213 4089 TO AMBASSADOR ^70870’^ 7 I 199S 16=51 FR R.B.SAMUELS

RBSAI1 UNITPRICE SCHEDULE

Test.photo badging,training,data base.ee ibration 1 $24,495.24 $24,495,24 Mise, material. Allowance 1 $242.00 $242.00 BMS Supervised VA-04-0470 1 $320.65 $320.65 Power to security sub panel 1 $274.67 $274.67 Transducers 1 $10,170.05 $10,170.05 Power to security panel in radio room 1 $423.50 $423.50

s6ry 9" monitor 10 \ $280,72 $2,807.20 VideoXii^ amp. in main console ver in main c 1 ^,044.90 $2,044/90 Video rnbx y -4— $2,388.54 ~$273i c'CTVxamer®’reilirtg mounted 6 $1729.09 $10.3ift.54 Switcher/^ Mtaster & slave 1 ^13.55 $9/3.55 RG 59}Zteflon 2200 \S1.42 $3,yi4.64 Testy^, Allowance $1,OM.16 TT FIRE 0321 FIRE ALARM Strobe padel 1 S5,474.W $5,474.04 ^eaker/Strobe / 29 $569.^ $16,527.39 Strtabe / 4 $551.76 / $2,207.04 Smoke Detector / 54 $661.76\ $29,795.04 Heatuetector / 2 $551.76 \ $1,103.52 Indicate LED lights / 42 $371.47 $15,601.74 Fuse cutout / 1 $644.93 $644.93 Duct Smokie Detec^ 4 $853.05^, _$3A12^ Connect Wi’aterflow $335.90 / . $671.79 Connect TaSimper Switch 2 $335.90/ \ $671.79 Connect spinnkle/systen 2 $317.7S \ $635.49 Connect ^switch 1 $317.75 \$317.75 Area smoke d ^or, explosion proof 1 $863.94 $863.94 Speaker/strob in envlroonmental enclosure — Vendor Modift toons to Building Class^JSy* 1 $36,364.13 $36.3^.13 Trouble bell / 1 $263/78 $283.78 ^STEMIFBOi Install he, rdrefectokfor preaction sys. (FBO) 15 $677.60 $10.16400 Install am pie visible unit (FBO) 2 $263.78 $527.K Install pre iction manual release 2 $^7.63 $975.26 Install pre iction panel\(FBO) 1 $1./41.03 11,141.0^ Install preaction batten "$TO43^oF” $i';o43:o2 Install ignetic bypass a^c $517.88 $517.88 install ergencyTelease^ 1 $181.50 $181.50 Conns t€>-pressure swrtcm 1 /$188.76 $188.76 IftSfalT Hing mounted smote detectors 12 / $176.66 $2,119.92 Install light horn 2 / $457.38 $914.76 Install rom ' 2 / $209.33 $418.66 install/manual pull station 1 I $239.58 $239.58 0 Supe vision T 484.600.00-^ . Draft ig & Erigineeri 1 $52,8^00 TbeWp----- 1 $30,000.00 Job Expense 1 $6,000.00

Page? I

NYC-WTC_000173114

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173114Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172054

Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.917

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →