Unit price schedule for electrical materials, 7 World Trade Center,

Machine-extracted title · confidence 90%

Detailed electrical material pricing schedule for threaded metallic conduit and EMT feeder work at 7 World Trade Center, Mayor's Office of Emergency Management.

NYC-WTC_000172676–000172683

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172678
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MAY 27 1998 16:49 FR R.B.SAMUELS 212 213 4089 TO AMBASSADOR P.04Z09

RBSAM UNITPRICE SCHEDULE

ELP-23W, 120/208V. 42 CB'S 1 $3,542.88 $3,542.88 ELP.23N-1,120/208V, 42 CB'S 1 $2,866.49 $2,866.49 ELP-23N3, 12Q/208V. 42 CB'S 1 $3,581.60 $3,581.60 ELP-23D1, 120/208V. 42CB'S 1 $3,009.27 $3,009.27 ELP23M, 120/208V, 42 CB'S 1 $3,524.73 $3,524.73 ELP-23M1,42 CB'S 1 $2,866.49 $2,866.49 ELP-R. 42 CB'S 1 $2,866.49 $2,866.49 DISC.SW. 30/30A 3P 1 $381.16 $381.15 ELP-EMR42CB'S 1 $3,524.73 $3,524.73 ULP-R, 42 CB'S 1 $3,244.01 $3,244.01 EPPH-23M1. 42 CB'S 1 $6,398.48 $6,398.48 ULP-23W, 42 CB'S 1 $2,767.27 $2,767,27 TRANSFORMER 112.5 KVA 1 $6,360.97 $6,360.97 TRANSFORMER 75 KVA 2 $4,636.72 $9,273.44 TRANSFORMER 45 KVA 1 $3,660.25 $3,660.25 TRANSFORMER 30 KVA 1 $2,555.52 $2,555.52 TRANSFORMER 37.5 KVA 1 $2,891.90 $2,891.90 TRANSFORMER 15 KVA 1 $2,289.32 $2,289.32 DISC.SW. 200/150 A 3P 4W 2 $1,062.38 $2,124.76 DSC. SW. 100A 3P 1 $693.33 $693.33 Mise, GENERATOR WORK p Generator Terminations LOT 1 $60,250.74 $60,250.74 GENERATORS SWITCHGEAR, FBO 1 $12,545.28 $12,545.28- 3 days for generator's testing 1 $2,168.32 $2,168.32 IsLflr. Fuel Tank Area Bell System 2 $3,666.30 $7,332.60 Fuel tank area work .per El .01 ' 1 $4,827.90 $4,827.90 Wstali Only ATS # 1, 2000 1 $3,372.27 $3.372.27 Install Only ATS #2, 800 A 1 $1,591.15 $1,591.15 } Install Only ATS #3,400 A 1 $1,281.39 $1,281.39 ' Install Only ATS #6, 200 A 1 $1,049.07 $1,049.07 < Install Only ATS# 6,2TO A 1 $1,049.07 $1,049.07 \ Install Only ATS # 7, 20C> A 1 $1,049.07 $1,049.07 \ Install Only ATS #8,200 A 1 $1,049.07 $1,049.07 I Install Only ATS #9, IOC A 1 $1,049.07 $1,049.07 j Refeed Machine Room for New ATS 1 $6,161.32 Install UPS 1 $7,676.24 Insta^l^Only Battery cable {re^w/Terminations 1 $1,069,64 $1,069.64 Removal Work in&^ric; Closet 1 $3,433.98 $3,433.98 Remove wiring back to source, see note 1 to 4 1 $464.64 $464.64 Remove existing light fix. See note 1 to 4 1 $309.76 $309.76 Relocation work in Meeh. Rms. 40 $1,386.66 $55,466.40 — y Remove & relocate devices at 1st. Foor 1 $896.40 $895.40 LIGHT FIXTURES & LAMPS Light fixture type'A' 162 $424.41 $68,764.02 Light fixture type 'Al' 2 $718.44 $1,436.88 Light fixture type 'B' 54 $388.11 $20,957.81 Light fixture type's EM' 34 $596.08 $20,266.80 Light fixture type 'C 8 FT 4 $1,093.39 $4,373.57

Pages

NYC-WTC_000172678

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172678Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →