MAY 27 1993 16:51 PR R.B.SAMUELS 212 213 4039 TO AMBASSADOR P.08/09
RBSA11 UNITPRICE SCHEDULE
Test,photQ badging,training.data base.cs ibration 1 $24,495.24 $24,495.24
Mise, material, Allowance 1 $242.00 $242.00
BMS Supervised VA-04r0470 1 $320.65 $320.65
Power to security sub panel 1 $274.67 $274.67
Transducers 1 $10,170.05 $10,170.05
Power to security panel in radio room 1 $423.50 $423.50
CCTV
9" cctv monitor 10 $280.72 $2,807.20
Video dist amp. Mid in main console ver in main c 1 $2,044.90 $2,044.90
Video mux 1 $2,388.54 $2,388.54
CCTV cameras ceiling mounted 6 $1,729.09 $10,374.54
Switcher rack Master & slave 1 $913.55 $913.55
RG 59U teflon 2200 $1.42 $3,114.54
Testing, Allowance 1 $1,084.16 $1,084.16
FIRE ALARM
FIRE ALARM Strobe panel 1 $5,474.04 $5,474.04
Speaker/Strobe 29 $569.91 $16,527.39
Strobe 4 $551.76 $2,207.04
Smoke Detector 54 $551.76 $29,795.04
Heat Detector 2 $551.76 $1,103.52
Indicatin LED lights 42 $371.47 $15,601.74
Fuse cutout 1 $644.93 $644.93
Duct Smoke Detector 4 $853.05 $3,412.20
Connect Waterflow 2 $336.90 $671.79
Connect Tamper Switch 2 $335.90 $671.79
Connect sprinkler system 2 $317.75 $635.49
Connect pressure switch 1 $317.76 $317.75
Area smoke detector, explosion proof 1 $863.94 $863.94
Speaker/strobe in enviroonmental enclosure 1 $863,94 $863.94
Vendor Modifications to Building Class E System 1 $36,364.13 $36,364.13
Trouble bell 1 $263.78 $263.78
PREACTION SYSTEM (FBO) 8T
Install heat detector for preaction sys. (FBO) 15 $677.60 $10,164.00
Install audible visible unit: (FBO) 2 $263.78 $527.66
Install preaction manual release 2 $487.63 $975.26
Install preaction panel, (FBO) 1 $1,141.03 $1,141.03
Install preaction batteries 1 $1,043.02 $1,043.02
Install magnetic bypass switch 1 $517.88 $517.88
Install emergency release unit 1 $181.50 $181.50
Connect to pressure switch 1 $188.76 $188.76
Install ceiling mounted smoke detectors 12 $176.66 $2,119.92 n**
Install light horn 2 $467.38 $914.76
install horn 2 $209.33 $418.66
Install manual pull station 1 $239.58 $239.58
Supervision 1 $184,600.00—^ .
Drafting & Engineering 1 $52,800.00
Tools 1 $30,000.00
Job Expense 1 $6,000.00 -