Electrical service proposal, 7 World Trade Center, May 1998
Machine-extracted title · confidence 95%
Contractor proposal for electrical panels, risers, generators, fire alarm, wiring, and lighting work at 7 World Trade Center totaling approximately $3.76 million.
QUR PROPOSAL'JDOEg. NOT INCLUDE;
1. ^^^^himP'^.xcept for core drilling and final connections.
2. Patching or painting.
3. HVAC control wiring,
4. Access doors.
5. Rubbish removal."
6. Standby for Asbestos removal/^
7. Temporary light maintenance beyond the regular electrician work
day.
8. Demolition - disconnects only.
9. Overtime deliveries.
10. Fire alarm filing to Building Department, or inspection fees.
11. ventilation of electric closets.
12. Le_ak detection system. *^----
13. "'Occupancy'^ihsors - not shown on drawings, not required as
confirmed by the engineer.
14. Termination for telephone and data wiring.-^
15. Projection screen raise/low switch FBO.
16. CeiJJjig speaker with grills and back boxes FBO.
17 , (^''R^f penetr^'Tioir-Qnd'''pitch pocket^T~~^
18 . ^"B^cing or^lunnage^ and figging of~preipurchased
equipment/material. ' •rrii*
19. Excavation or back filWig.
20. Electric radiators, (dl^ater^ heating or snow melting cables.
21. Lighting control sysTenmio !schedule available.
22. Audio visual wiring, equipment terminations and connections as
per Drawings AV-SI thru AV-S8 by others.
23. Terminations of RG6 cabling for TV.
24. Antenna work and antenna cabling.
25. Furnishing and installation of audio visual plate/panel.
Furnishing c^d installation of all work associated with T<RN-2000 7
✓ transducers .//A? - //? /Sio ^ao /<^/oo ‘
iriytaHTn^of wiring of preaction devices furnished under fire /l^
protection, //p ff/zf
Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.