NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO., INC.
11, 7 4-6
M *7 b AV
-+ Tl 7, 84O (^er\efoX®r
Mayor’s Office of Emergency Management
7 World Trade Center
June 10, 1998 6 5
Page Two...
Breakdown CjODtinued...
291J43^ee Note 3)
Furniture
*Audio Visual -F t,j^s*eo wC----- 1V - 1
Fabric Wall Panels 0 19,800.00
Projection Screen j9j00 (see Note 4)
Folding Wall 14,000.00.^e Note 5)
Metal Panel Wall isyooo.ob
Special Doors 34,630.00
Metal Shelving 11,726.00
Safe Door 4,130.00 y
Rolling Fire Door 2.892JD0i<see Note 6)
Cut & Patch 30,000.00
Generator Test 4,500.00
Wire Mesh Partition Ji,25£L00
General Conditions 8% 803,772.00^
Overhead & Fee 6% 651,055.00 '
Insurance 1.25% 1437_74.00^
Total $11,645,746.00
*Trade values have changed due to Addendum #1 dated 5/15/98 (see attached)
Note 1: Considered a General Conditions cost
Note 2: Reduced by sales tax amount (see P&S proposal attached)
Note 3: Revised quotation received (see Novalink proposal dated 6/1/98 attached)
Note 4: Included in Audio Visual proposals
Note 5: Received new proposal (see The Mackenzie Group proposal dated 6/10/98 attached)
Note 6: Received new proposal (see Metro Door proposal dated 6/9/98 attached)
- Previously approved cost to pre-purchase generator
and switch gear $717,890.00
Qualifications
- Demolition to be performed on week nights
- Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter
- All furniture devices furnished by vendor
- Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and
specifications
- All security wiring to be run in plenum, furnish and installation of conduits is limited to
Drawing TC-101 only
Forward.../