NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Continued Breakdown of Ambassador Construction Co. charges for MOEMn
Document / 1 page

Ambassador Construction charges, 7 World Trade Center, June 1998

Machine-extracted title · confidence 92%

Invoice from Ambassador Construction Co. Inc. detailing charges for furniture and construction materials at the Mayor's Office of Emergency Management.

NYC-WTC_000173162

Folder label: “Continued Breakdown of Ambassador Construction Co. charges for MOEMn

Page image
Scanned page image, NYC-WTC_000173162
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO INC ❖

Mayor’s Office of Emergency Management 7 World Trade Center 5 June 10, 1998 Page Two...

Breakdown Cootinued... 291,143.00^e Note 3) , -Q Furniture ? *Audio Visual + I 2 Fabric Wall Panels 19,800.00 ' Projection Screen .0.00 (see Note 4) Folding Wall 14,000.00.(<ee Note 5) Metal Panel Wall ife,ooo.ob Special Doors 34,630.00 Metal Shelving 11,726.00 Safe Door 4,130.00 z Rolling Fire Door 2,892.00 i^ee Note 6) Cut & Patch - 30,000.00 Generator Test 4,500.00 Wire Mesh Partition 3250.00 General Conditions 8% 'f • 803,'772:0U®^~^ 75 Overhead & Fee 6% 651,055.00 ' Insurance 1.25% 14.3,774.00^ Total $11,645,746.00

*Trade values have changed due to Addendum #1 dated 5/15/98 (see attached)

Note1: Considered a General Conditions cost Note 2: Reduced by sales tax amount (see P&S proposal attached) Note 3: Revised quotation received (see Novalink proposal dated 6/1/98 attached) Note 4: Included in Audio Visual proposals Note 5: Received new proposal (see The Mackenzie Group proposal dated 6/10/98 attached) Note 6c Received new proposal (see Metro Door proposal dated 6/9/98 attached)

- Previously approved cost to pre-purchase generator and switch gear $717,890.00

Qualifications - Demolition to be performed on week nights - Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter - All furniture devices furnished by vendor - Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and specifications - All security wiring to be run in plenum, furnish and installation of conduits is limited to Drawing TC-101 only

Forward.../

NYC-WTC_000173162

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173162Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →