NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO INC
❖
Mayor’s Office of Emergency Management
7 World Trade Center
5
June 10, 1998
Page Two...
Breakdown Cootinued... 291,143.00^e Note 3) , -Q
Furniture ?
*Audio Visual + I 2
Fabric Wall Panels 19,800.00 '
Projection Screen .0.00 (see Note 4)
Folding Wall 14,000.00.(<ee Note 5)
Metal Panel Wall ife,ooo.ob
Special Doors 34,630.00
Metal Shelving 11,726.00
Safe Door 4,130.00 z
Rolling Fire Door 2,892.00 i^ee Note 6)
Cut & Patch - 30,000.00
Generator Test 4,500.00
Wire Mesh Partition 3250.00
General Conditions 8% 'f • 803,'772:0U®^~^ 75
Overhead & Fee 6% 651,055.00 '
Insurance 1.25% 14.3,774.00^
Total $11,645,746.00
*Trade values have changed due to Addendum #1 dated 5/15/98 (see attached)
Note1: Considered a General Conditions cost
Note 2: Reduced by sales tax amount (see P&S proposal attached)
Note 3: Revised quotation received (see Novalink proposal dated 6/1/98 attached)
Note 4: Included in Audio Visual proposals
Note 5: Received new proposal (see The Mackenzie Group proposal dated 6/10/98 attached)
Note 6c Received new proposal (see Metro Door proposal dated 6/9/98 attached)
- Previously approved cost to pre-purchase generator
and switch gear $717,890.00
Qualifications
- Demolition to be performed on week nights
- Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter
- All furniture devices furnished by vendor
- Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and
specifications
- All security wiring to be run in plenum, furnish and installation of conduits is limited to
Drawing TC-101 only
Forward.../