Ambassador Construction revised proposal, June 1998

Machine-extracted title · confidence 95%

Revised construction proposal from Ambassador Construction for work at the Mayor's Office of Emergency Management.

NYC-WTC_000173073–000173075

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th & 23rd Floors

Page image
Scanned page image, NYC-WTC_000173074
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO. INC

Mayor’s Office of Emergency Management 7 World Trade Center

June 10. 1998 Page Two...

Breakdown Continued Furniture 291,143.00 (see Note 3) *Audio Visual 1,794,194.00 Fabric Wall Panels 19,800.00 Projection Screen 0.00 (see Note 4) Folding Wall 14,000.00 (see Note 5) Metal Panel Wall 18,000.00 Special Doors 34,630.00 Metal Shelving 11,726.00 Safe Door 4,130.00 Rolling Fire Door 2,892.00 (see Note 6) Cut & Patch 30,000.00 Generator Test 4,500.00 Wire Mesh Partition 3,250.00 General Conditions 8% 803,772.00 Overhead & Fee 6% 651,055.00 Insurance 1.25% 14X774.00 Total $11,645,746.00

*Trade values have changed due to Addendum #1 dated 5/15/98 (see attached)

Note 1: Considered a General Conditions cost Note 2: Reduced by sales tax amount (see P&S proposal attached) Note 3: Revised quotation received (see Novalink proposal dated 6/1/98 attached) Note 4; Included in Audio Visual proposals Note 5: Received new proposal (see The Mackenzie Group proposal dated 6/10/98 attached) Note 6: Received new proposal (see Metro Door proposal dated 6/9/98 attached)

- Previously approved cost to pre-purchase generator and switch gear $717,890.00

Qualifications - Demolition to be performed on week nights - Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter - All furniture devices furnished by vendor - Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and specifications - All security wiring to be run in plenum, furnish and installation of conduits is limited to Drawing TC-101 only

Forward.../

NYC-WTC_000173074

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173074Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →