AMBASSADOR CONSTRUCTION CO. INC
Mayor’s Office of Emergency Management
7 World Trade Center
June 10,1998
Page Three...
Qualifications Continued...
- Installation of cable tray and conduit required in Section 16700
- Furnish and installation of heat trace cable as per the electrical drawings only
- Termination of telephone and data wiring or cabling
- Control system for HVAC equipment not as specified, but as per meeting with Engineer
- Overtime except where required by building rules
Exclusions
- Fees for Port Authority filing
- Building charges for shutdowns, elevators, tie-ins, etc,
- Overtime work
- Fire alarm filing or inspection fees
- Testing and inspections
- Furnish and installation of audio visual plate/panel
- Sales tax
This bid does not include and Ambassador Construction Company, Inc. will not be responsible
for any and all costs associated with, or related to, inspections to discover the presence of
asbestos, preparation and filing of an asbestos removal or treatment program, the removal of
asbestos or other costs or expense related to compliance with any local, state or federal law,
rule or regulation appertaining to the presence of asbestos at the premises.
We trust the above meets with your approval and we look forward to the pleasure of serving
you.
Very truly yours,
-AMB^^^R COI^TSUCTHON CO., INC.
Martin Schneider
Vice President
cc: Walter Weems
Chi Chu
Richard Ramos
Accepted:________ Dated:
MS;acd
c:\wpdocs\estimate[oem13.wpd]
NYC-WTC_000173075