NYC 9/11 Public Portal Document
JUN 23 ’98 15:09 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02Z08
AMBASSA£X>R CONSTRUCTION CQ. INC
June 23,1998
Ms. Kathy Giliberti
Silverstein Properties, Inc.
120 Broadway
New York. NY 10271
RE: Mayor’s Office of Emergency Management
7 World Trade Center - 1st, 7th and 23rd Floors
Dear Ms. Giliberti:
We are in receipt of Richard Ramos’ letter dated 6/18/98 and have reviewed Mr. Ramos' items
with Joe Aliotta of Swanke’s office for clarification. Please find the following scopes and
proposal changes;
1. Electrical
a. Substitute by cable in lieu of EMT conduit for all work
inside the tenant space. Stub-ups for tel/data and
audio visual will still ibe in EMT piping. Deduct $34,773.00
b. Delete all tel/data cabling as indicated in the electrical
contractor’s bid. Deduct $229,691.00
c. Eliminate the following AJ\/ requirements;
- All 13" monitors in BOC area. Switching cannot be
eliminated because it controls other equipment. Deduct $29,420.00
- Down grade press /W feed to providing service to
(1} camera in lieu of multiple cameras shown. Deduct $6,375.00
- Cabling and switches for external feeds. Deduct $4,636.00
•See Ace Communication’s letter dated 6/23/98 detailing $34,475 change attached. Ace
has also indicated that the switches controlling the above referenced work cannot be
eliminated because they control other equipment. These switches would have to be
redesigned and may result in a cost savings. Shen, Milson and Wilke should be
consulted.
•See R.B. Samuels’ letter clarifying $273,000 for supervision, drafting, engineering, tods,
and job expenses attached.
2.1 Eliminate all steel walls, floors and ceilings at the safe
room. This includes the addition of changing walls to a
Type 2 partition and adding a 2.2 lay-In ceiling In lieu of
steel shown. Deduct $1,469.00
Forward.../
317 MADISON AVENUE. NEW YORK. NY 10017, 212 922 1020, FAX 212 949 9762
NYC-WTC_000173021
OCR can misread numbers and units. Confirm readings against the page image before using them.