NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO, INC.
Mayor’s Office of Emergency Management
7 World Trade Center
June 10. 1998
Page Two...
Breakd-owa Conti n ued...
W 291J43Wee Note 3) g
Furniture
*Audio Visual -h
Fabric Wall Panels 0 -19,800.00
Projection Screen ,0.00 (sefi.JsloteL4)
Folding Wall -l4,000Wj;4e Note 5)
Metal Panel Wall .0«^SK-i§7ooo;oo
Special Doors ^34.630.00
Metal Shelving (^-^3^'11.726.00
Safe Door '4,130.00 /
Rolling Fire Door 0•0 —2,892.00 «(See Note 6)
Cuts Patch <^^-^30,000.00
Generator Test 4,500.00
Wire Mesh Partition 3-250.00
General Conditions 8% — '803;772.W
Overhead & Fee 6% 651,055.00
Insurance 1.25% 1^JZ4.QQ'
Total $11,645,746.00
*Trade values have changed due to Addendum #1 dated 5/15/98 (see attached)
Hotel: Considered a General Conditions cost
Note 2: Reduced by sales tax amount (see P&S proposal attached)
Note 3: Revised quotation received (see Novalink proposal dated 6/1/98 attached)
Note 4: Included in Audio Visual proposals
Note 5: Received new proposal (see The Mackenzie Group proposal dated 6/10/98 attached)
Note 6: Received new proposal (see Metro Door proposal dated 6/9/98 attached)
- Previously approved cost to pre-purchase generator
and switch gear $717,890.00
Qualifications
- Demolition to be performed on week nights
- Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter
- All furniture devices furnished by vendor
- Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and
specifications
- All security wiring to be run in plenum, furnish and instaHation of conduits is limited to
Drawing TC-101 only
Fonward.../
NYC-WTC_000173148
OCR can misread numbers and units. Confirm readings against the page image before using them.