Funding request for OEM traffic feed installation, April 1999

Machine-extracted title · confidence 50%

Memo dated April 27, 1999 requesting funding from the construction budget for metro traffic feed and dish installation at the Mayor's Office of Emergency Management.

NYC-WTC_000172953–000172957

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172955
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

72 F&l Two (2) Alto Shaam cooking and holding oven model 1000-THI/HD/D 91539 $0:00 VOID $0.00 Furnish two (2) Luxor TVP44 -44" TV cart for PIU room monitors $1,580.00 $o.00 Not to be approved $1,580.00 $1,580.00 F&l blackout shade bands for press room & Mayor's conference room $4,531.00 $o.00 Not to be approved $4,631.00 $4,631.00 75 F&l (2) two UPS units $4,874.00 3/25/99 $4,874.00 Approved $4,874.00 Relocate existing cold water make-up line as requested by Building Engineers $/oi.0o to be approved $701.00 -------------$701.00 A&E fee for additional Audio-visual scope of work 18500 $0.00 VOID $0.00 $0.00 7p Dam closure, flashing and Aluminum drip pan at radio room on the roof $24,274.00 being revised being revised $24,274.00 ----------- $24,274.00 Various work by RB Samuels/Precision Interiors/Miller Druck $7,710.00 to be approved $7,710.00 -------------$7,710.00 <797 F&l one hundred additional reinforcing plates for the blast proof & access doors $5,955.00 letter from bHC to be reviewed $6,955.00 $6,9551)0 @ (8^ Removal of additional granite flooring regarding fuel oil pipe work ■ ■ $1,531.00 $0.00 Not to be approved $1,631.00 $T,63roo Fasten radio room walls to the structural steel with special clips $8,228.00 HOLD HOLD $8,228.00 -------------$8;228;00 Replace door & frame of radio room with blast resistant door $8,313.00 HOLD HOLD $8,313.00 $8,313.00 I Modify duct conflicting with light in EOC room $2,805.00 to be approved $2,805.00 $2,805.00 09 Credit for deleted 8 monitors and addition to reinstall cove light in EOC room -$30,581.00 to be approved -$30,681.00 ------- WmDO 85 Additional cost for revised fuel line addition to CO44R 34401 $0?00 VOID $0.00 $0.00 86 Reroute new exhaust duct around the existing steel beam 5763 VOID $0.00 $0.00 87 UPS convertion kit not received 88 Revised cost tor fuel oil piping through 2nd floor machine room corridor $135,957.00 $130,000.00 to ba approved $130,000.00 Control wiring for Intergen System in fuel tank room $7,553.00 letter from engr. $7,553.00 T7,;553DO

Total 4>l,UT»5,^Z2.UU ^820,877.00 $864,577.00

NYC-WTC_000172955

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172955Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved construction costs, April 2002 · Box 7DCAS

NYC-WTC_000171286

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗
DCAS letter re: Change orders for OEM, Jan 1999 · Box 7DCAS

NYC-WTC_000171802

Letter from DCAS approving negotiated costs for multiple change orders submitted by a contractor for the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →