Machine-extracted title · confidence 95%

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

NYC-WTC_000171286–000171290

Folder label: “Breakdown of approved Change Orders

Page image
Scanned page image, NYC-WTC_000171286
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mayor's Office ot Emergency Managemenf 7 World Trade Center 4/12/02 Breakdown of approved Change Orders

DescripUon of work Amount of Approval Amount proposal data approved Remarks

1 Moving wall/relocate ductwork_______________________________________ $10,817.00 8/11/98 $7,000.00 Approved 2 Baltimore Air Coll circuit cooling__________ 9818 $0.00 VOID

JR Miscellaneous electrical changes_____________________________________ $3,704.00 9/14/98 $3,704.00 Approved 4R Bulletin #1 1. Cost relating to incorporating comments of port authority -$2,950.00 9/14/98 -$18,308.00 Approved 2. Cost for deletion of AAZ works and equipments_________________________ -$270,024.00 9/14/98 -$289,803.00 Approved 3. Hurricane wall a) Construction of hurricane wall $331,310.00 9/14/98 $281,112.00 Approved b) Motorize humcane wall dampers_________________________________ $135,906.00 9/14/98 $126,000.00 Approved 5 void VOID 6 Additional cost approved for changing door #01A to bullet resistant $406.00 9/21/98 $406.00 Approved 7R void $0.00 $0.00 VOID 8 Additional cost approved for changing door #01B and sunounding area to bullet resistant_________________________________________________ $11,688.00 9/21/98 $11,688.00 Approved 9 Additional cost approved for changing door finish from painted_______________ to Mahore finish $11,707.00 9/21/98 $11,707.00 Approved 10 Additional cost approved for providing class I package receiver as per sketch prepared by SHCA $2,666.00 9/21/98 $2,666.00 Approved Additional amount approved tor revision of dr awings with___________________ respect to the above referred door/package naceiver_______________________ $1,975.00 9/21/98 $1,975.00 Approved 2i Change door #5 from HM to ACME partition door_________________________ $2,898.00 10/22/98 $2,898.00 Approved 12 Provide Volt meter & ammeter_______________________________________ $7,766.00 10/30/98 $7,766.00 Approved 13 Additional framing/sheetrock at door frames & fascia_______________________ $985.00 10/30/98 $985.00 Approved 14 Credit for deletion of witnessing of field test for emergency__________________ generator by Cosentini Associates____________________________________ -$5,216.00 10/22/98 -$5,216.00 Approved 15 Additional 4“ & 2" sleeves, 4" stub-up and associated cutting_________________ and patching on 23rd floor__________________________________________ $21,234.00 10/22/98 $21,234.00 Approved Additional architectural fee for scope revisions___________________________ $2,375.00 12/1/98 $2,375.00 Approved 16R Changes in Panel boards $21,519.00 12/1/98 $18,500.00 Approved 17R F&l combination floor boxes under raised floor area as per architect $5,042.00 10/22/98 $5,042.00 Approved Additional fee for SHCA for revision to drawing for Mictowave dish location $2,525.00 10/22/98 $2,525.00 Approved 18 Replace projectors with upgraded projectors____________________________ 16761_______ $0.00 VOID 19 42“ X 30* decoustic panels__________________________________________ $4,636.00 10/30/98 $4,636.00 Approved

2°. Provide power for fan power boxes from vartxis panels lieu of one panel $12,866.00 10/30/98 $11,000.00 Approved 21 Additional structural steel at switch gear area and water tank $20,342.00 10/30/98 $18,500.00 Approved 22R F&l (2) 6 strand and (1) 24 strand multi-mode fiber $6,728.00 12/1/98 $6,728.00 Approved 23 Additional work on 7th floor as per sketch from Cantor $7,534.00 1/25/99 $5,800.00 Approved 2^ Control wiring to 60 monitors & 4 LCD video projectors in EOC & Watch Command $3,001.00 12/1/98 $3,001.00 Approved 25 Structural support for Microwave dishes________________________________ $36,199.00 12/1/98 $34,500.00 Approved 26R Additional work as per SHCA sketches FSK-37, 38,12 & 40_________________ $12,599.00 1/25/99 $10,800.00 Approved 27 Credit for painting LAN room floor in lieu of VCT flooring____________________ -481________ $0.00 VOID 28 Independent feed to ELP-23N & ELP-23N-1 $1,478.00 12/1/98 $1,478.00 Approved

NYC-WTC_000171286

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171286Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173550

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →