Breakdown of approved construction costs, April 2002

Machine-extracted title · confidence 95%

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

NYC-WTC_000171286–000171290

Folder label: “Breakdown of approved Change Orders

Page image
Scanned page image, NYC-WTC_000171287
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

29 Additional 2 duplex outlets and 1 switch in PDU/Training room #23-42___________ $464.00 12/1/98 $464.00 Approved 30 Additional cost as per sketches FSK-47 & 41______________________________ $1,391.00 12/1/98 $1,391.00 Approved 31 F&l security wire In conduit as per Vikonics spec #11020-C $54,354.00 12/1/98 $52,008.00 Approved New coat closet as per FSK44 at room #23-09_____________________________ 6694______ $0.00 VOID 33 Additional cost tor sleeves and grounding________________________________ $5,008.00 12/1/98 $5,008.00 Approved 34 F&l new metal cap flashing w/drip return as shown on the Kemper system drawing $1,391.00 1/25/99 $1,391.00 Approved 35 Termination trf flber optic cables & furnishing of patch panels__________________ $5,796.00 3/11/99 $5,796.00 Approved 36 Vteter proof the generator room on the 7th floor with Dex-o-Tex floor____________ 17126______ $0.00 VOID

-52. F&l stainless steel cladding to 20 existing window mullions____________________ 40166______ $0.00 VOID 38 Additional drains as per SKP 3 and SKP 4 in HC toilet rooms 23-3 & 23-32 $8,346.00 1/25/99 $7,000.00 Approved 39R Mobile PBF 15~Wx 17 3/4“ D LN Novalink furniture not included in base bid_______ $26,391.00 12/29/98 $26,391.00 Approved 40 Chop concrete and weld new rebar to existing rebar In trench w/3" overlap $26,427.00 1/25/99 $21,300.00 Approved 41 Antenna support per revised sketch from Cantor adding 4 steel clips welded to web $16,807.00 1/25/99 $14,500.00 Approved 42 F&l 4 type G wall washers in room #23-40 as per FSK-51_____________________ 2202 $0.00 VOID 43 RG-6U plenum cable for Time & Warner TV as per John Hughes letter___________ $11,759.00 1/25/99 $11,000.00 Approved 44R F&l oil piping as per revised routing sketch FSK50 & SK58 dated 3/19/99 $85,893.00 4/8/99 $85,000.00 Approved

J®. F&l 1 custom press panel & installation & temiination of cables in to it____________ $1,430.00 12/29/98 $1,430.00 Approved

J®. Additional electrical work In room 23-50 and 23-18 for power supply/security equip 2168 $0.00 VOID 47 Furnish 3 stainless steel flexes for the generators___________________________ $3,941.00 1/4/99 $3,941.00 Approved Additional work as per Swanke memo datedl 2/29/98________________________ $4,679.00 1/25/99 $4,679.00 Approved 49 Change ceiling tile & sprinklers In press room $6,779.00 3/11/99 $6,779.00 Approved

.22. Correct Incompatibility between Ace video equip & Lutron dimming system________ $1,067.00 1/25/99 $1,067.00 Approved 51 Various changes in storage room shelving unto____________________________ $751.00 1/25/99 $751.00 Approved 52 Various electrical changes as per RB Samuel's work orders___________________ $38,987.00 3/11/99 $36,000.00 Approved 53 Various electrical changes as per RB Samuefs work orders $2,898.00 3/11/99 $2,898.00 Approved 54 Man hour cost for moving computer equipments on 23rd floor__________________ $2,671.00 3/11/99 $2,671.00 Approved 55 Removal /reinstallatlon of electrieal work due Io new routing of fuel Ivie___________ $34,954.00 3/11/99 $29,000.00 Approved 56 1 duplex outlet on 1st floor with cable In 1“ conduit__________________________ 19242 $0.00 VOID 57 AddMonal equipment & labor for security worlt as per SHCA memo dated 12/17/98 $68,613.00 3/11/99 $63,000.00 Approved 58 Labor for moving computer equipments__________________________________ $5,506.00 3/11/99 $5,506.00 Approved 59 1 duplex outlet on 1st floor w/wiring through existing 4" conduit_________________ $10,948.00 3/11/99 $10,948.00 Approved

-22. Close gap at steel In hurricane wall w/16 gauge steel plate as per FSK-54________ $8,114.00 3/11/99 $8,114.00 Approved 61 Mag lock over ride button for doors at toilet rooms, water storage room,bunker rooms and door leading to bunker room area___________________________________ $2,785.00 3/11/99 $2,400.00 Approved 62 Roof repair as per details at new curb from Kemper system___________________ $9,679.00 3/11/99 $9,679.00 Approved Additional electrical work as per RB Samuels work orders____________________ $1,912.00 3/11/99 $1,912.00 Approved Additional electrical work as per RB Samuels work orders $7,114.00 3/11/99 $6,500.00 Approved 65 x-ray machine and bagging system $26,336.00 2/10/99 $22,721.00 Approved 66 Press room floor and podium__________________________________________ $15,460.00 3/11/99 $14,800.00 Approved 67 Various electrical changes as per RB Samuefs work orders $2,894.00 3/11/99 $2,894.00 Approved 68 F&l astragal on door #5 ACME pair of doors______________________________ 406 $0.00 VOID F&l closer, roof chain and provide additional keys__________________________ $780.00 3/11/99 $672.00 Approved

22. Three (3) 28* dia. And Two (2) 21* dla. Cast magnum plaques_________________ $6,114.00 3/11/99 $6,114.00 Approved 71 3 phase 30 amp wiring for circulating pumps______________________________ $4,579.00 3/11/99 $4,579.00 Approved 72 F&l Two (2) Allo Shaam cooking and holding oven model lOOO-THI/HD/D________ 11539 $0.00 VOID 73 Furnish two (2) Luxor TVP44 -44* TV cart tor PILI room monitors_______________ $1,580.00 9/9/99 $1,580.00 Approved 74 F&l blackout shade bands tor press room & Mayor's conference room___________ $4,631.00 9/9/99 $3,800.00 Approved

2®. F&l (2) two UPS units______________________________________________ $4,874.00 3/25/99 $4,874.00 Approved 76 Relocate existing cold water make-up line as requested by Building Engineers $701.00 9/9/99 $701.00 Approved A&E foe for additional Audio-visual scope of work 18500 $0.00 VOID

NYC-WTC_000171287

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171287Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173550

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →