29 Additional 2 duplex outlets and 1 switch in PDU/Training room #23-42___________ $464.00 12/1/98 $464.00 Approved
30 Additional cost as per sketches FSK-47 & 41______________________________ $1,391.00 12/1/98 $1,391.00 Approved
31 F&l security wire In conduit as per Vikonics spec #11020-C $54,354.00 12/1/98 $52,008.00 Approved
New coat closet as per FSK44 at room #23-09_____________________________ 6694______ $0.00 VOID
33 Additional cost tor sleeves and grounding________________________________ $5,008.00 12/1/98 $5,008.00 Approved
34 F&l new metal cap flashing w/drip return as shown on the Kemper system drawing $1,391.00 1/25/99 $1,391.00 Approved
35 Termination trf flber optic cables & furnishing of patch panels__________________ $5,796.00 3/11/99 $5,796.00 Approved
36 Vteter proof the generator room on the 7th floor with Dex-o-Tex floor____________ 17126______ $0.00 VOID
-52. F&l stainless steel cladding to 20 existing window mullions____________________ 40166______ $0.00 VOID
38 Additional drains as per SKP 3 and SKP 4 in HC toilet rooms 23-3 & 23-32 $8,346.00 1/25/99 $7,000.00 Approved
39R Mobile PBF 15~Wx 17 3/4“ D LN Novalink furniture not included in base bid_______ $26,391.00 12/29/98 $26,391.00 Approved
40 Chop concrete and weld new rebar to existing rebar In trench w/3" overlap $26,427.00 1/25/99 $21,300.00 Approved
41 Antenna support per revised sketch from Cantor adding 4 steel clips welded to web $16,807.00 1/25/99 $14,500.00 Approved
42 F&l 4 type G wall washers in room #23-40 as per FSK-51_____________________ 2202 $0.00 VOID
43 RG-6U plenum cable for Time & Warner TV as per John Hughes letter___________ $11,759.00 1/25/99 $11,000.00 Approved
44R F&l oil piping as per revised routing sketch FSK50 & SK58 dated 3/19/99 $85,893.00 4/8/99 $85,000.00 Approved
J®. F&l 1 custom press panel & installation & temiination of cables in to it____________ $1,430.00 12/29/98 $1,430.00 Approved
J®. Additional electrical work In room 23-50 and 23-18 for power supply/security equip 2168 $0.00 VOID
47 Furnish 3 stainless steel flexes for the generators___________________________ $3,941.00 1/4/99 $3,941.00 Approved
Additional work as per Swanke memo datedl 2/29/98________________________ $4,679.00 1/25/99 $4,679.00 Approved
49 Change ceiling tile & sprinklers In press room $6,779.00 3/11/99 $6,779.00 Approved
.22. Correct Incompatibility between Ace video equip & Lutron dimming system________ $1,067.00 1/25/99 $1,067.00 Approved
51 Various changes in storage room shelving unto____________________________ $751.00 1/25/99 $751.00 Approved
52 Various electrical changes as per RB Samuel's work orders___________________ $38,987.00 3/11/99 $36,000.00 Approved
53 Various electrical changes as per RB Samuefs work orders $2,898.00 3/11/99 $2,898.00 Approved
54 Man hour cost for moving computer equipments on 23rd floor__________________ $2,671.00 3/11/99 $2,671.00 Approved
55 Removal /reinstallatlon of electrieal work due Io new routing of fuel Ivie___________ $34,954.00 3/11/99 $29,000.00 Approved
56 1 duplex outlet on 1st floor with cable In 1“ conduit__________________________ 19242 $0.00 VOID
57 AddMonal equipment & labor for security worlt as per SHCA memo dated 12/17/98 $68,613.00 3/11/99 $63,000.00 Approved
58 Labor for moving computer equipments__________________________________ $5,506.00 3/11/99 $5,506.00 Approved
59 1 duplex outlet on 1st floor w/wiring through existing 4" conduit_________________ $10,948.00 3/11/99 $10,948.00 Approved
-22. Close gap at steel In hurricane wall w/16 gauge steel plate as per FSK-54________ $8,114.00 3/11/99 $8,114.00 Approved
61 Mag lock over ride button for doors at toilet rooms, water storage room,bunker rooms
and door leading to bunker room area___________________________________ $2,785.00 3/11/99 $2,400.00 Approved
62 Roof repair as per details at new curb from Kemper system___________________ $9,679.00 3/11/99 $9,679.00 Approved
Additional electrical work as per RB Samuels work orders____________________ $1,912.00 3/11/99 $1,912.00 Approved
Additional electrical work as per RB Samuels work orders $7,114.00 3/11/99 $6,500.00 Approved
65 x-ray machine and bagging system $26,336.00 2/10/99 $22,721.00 Approved
66 Press room floor and podium__________________________________________ $15,460.00 3/11/99 $14,800.00 Approved
67 Various electrical changes as per RB Samuefs work orders $2,894.00 3/11/99 $2,894.00 Approved
68 F&l astragal on door #5 ACME pair of doors______________________________ 406 $0.00 VOID
F&l closer, roof chain and provide additional keys__________________________ $780.00 3/11/99 $672.00 Approved
22. Three (3) 28* dia. And Two (2) 21* dla. Cast magnum plaques_________________ $6,114.00 3/11/99 $6,114.00 Approved
71 3 phase 30 amp wiring for circulating pumps______________________________ $4,579.00 3/11/99 $4,579.00 Approved
72 F&l Two (2) Allo Shaam cooking and holding oven model lOOO-THI/HD/D________ 11539 $0.00 VOID
73 Furnish two (2) Luxor TVP44 -44* TV cart tor PILI room monitors_______________ $1,580.00 9/9/99 $1,580.00 Approved
74 F&l blackout shade bands tor press room & Mayor's conference room___________ $4,631.00 9/9/99 $3,800.00 Approved
2®. F&l (2) two UPS units______________________________________________ $4,874.00 3/25/99 $4,874.00 Approved
76 Relocate existing cold water make-up line as requested by Building Engineers $701.00 9/9/99 $701.00 Approved
A&E foe for additional Audio-visual scope of work 18500 $0.00 VOID