Breakdown of approved construction costs, April 2002

Machine-extracted title · confidence 95%

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

NYC-WTC_000171286–000171290

Folder label: “Breakdown of approved Change Orders

Page image
Scanned page image, NYC-WTC_000171288
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

77 Dam closure, flashing and Aluminum drip pan at radio room on the roof_______ $24,274.00 being voided 78 Various work by RB Samuels/Precision Interiofs/Miller Druck $7,710.00 9/9/99 $7,200.00 Approved

Z® F&l one hundred additional reinfofcing plates for the blast proof & access doors $6,955.00 9/9/99 $6,955.00 Approved 80 Removal of additional granite flooring regarding fuel oil pipe work___________ 1631________ $0.00 VOID 81 Fasten radio room walls to the structural steel with special clips_____________ $8,228.00 being voided 82 Replace door & frame of radio room with blast resistant door_______________ $8,313.00 being voided 83 Modify duct conflicting with light in EOC room__________________________ $2,805.00 9/9/99 $2,600.00 Approved

Zi Credit for deleted 8 monitors and addition to reinstall cove light in EOC room -$30,681.00 9/9/99 ($30,681.00) Approved Additional cost for revised fuel line addition to CO44R____________________ 34401_______ $0.00 VOID 86 Reroute new exhaust duct around the existing steel beam_________________ 2763 $0.00 VOID 87 UPS conversion kit______________________________________________ $1,276.00 being voided 88 Revised cost for fuel oil piping through 2nd floor machine room corridor $135,957.00 7I7I9Q $130,000.00 Approved 89 Control wiring for Intergen System in fuel tank room 7553 $0.00 VOID Credit amount for previously approved fuel oil line ($85,893.00) 7/7199 ($85,000.00) Approved 90 VOID $0.00 $0.00 VOID 91 F&l pump w/funnel drain to pumpout water leaked from domestic water pump $6,565.00 9/9/99 $6,000.00 Approved 92 F & 11 1/2" KIndotf on wall in press room______________________________ $380.00 9/9/99 $380.00 Approved Wire 6 shade motors and 2 switch controllers__________________________ $4,892.00 10/27/99 $4,892.00 Approved 94 Additional work at domestic transfer pump/relay/visual level indicator etc $7,291.00 being voided

J®. Provide 3 receptacle under Mayor's conference room table________________ $1,046.00 9/9/99 $1,046.00 Approved 96 F&l heat tracing on existing 6" hot water linethat runs thro generator room_____ $10,255.00 2/9/00 $10,255.00 Approved

JL 2 Hr rated sheetrock Are proofing to fuel line in Hue of 2 Hr vermiculale enclosure $4,560.00 10/27/99 $4,560.00 Approved 98 Various electrical lighting work In press room $9,092.00 11/15/99 $8,800.00 Approved 99 Additional outlets at Jack's office & hallway $2,033.00 10/27/99 $2,033.00 Approved 100 Engineering fee for Shen Milsom & Wilke, Inc regarding additional cameras $20,625.00 10/27/99 $20,625.00 Approved 101 Provide wall mounted Halotron fire extinguisher $523.00 being voided 102 Data boxes & quad outlets in Mayor's conference room $3,854.00 12/15/99 $3,854.00 Approved 103 ACE audio visual work for wireless microphones & camera in press room/EOC $73,987.00 11/15/99 $73,987.00 Approved 104 Conduits and cable for DOT camera work $54,031.00 11/16/99 $50, .00 Approved 105 Audiovisual expansion Phase I as per drawings AV-1 & AV-2 $136,001.00 11/22/99 $136,001.00 Approved 106 F&l PESA front panel control for matrix switclier $3,568.00 12/15/99 $3,568.00 Approved 107 Painl smoke room_______________________________________________ $650.00 12/15/99 $650.00 Approved 108 F&l final connections to the new video cable-splice FC/APC pig tails to fiber $4,258.00 1/3/00 $4,258.00 Approved 109 Additional electrical work as requested by OEM_________________________ $4,482.00 2/9/00 $4,482.00 Approved 110 Additional sprinkler head and door astragal $2,461.00 2/9/00 $2,461.00 Approved 111 Additional work as per SHCA memorandum dated 1/20/00 $17,466.00 2/25/00 $17,466.00 Approved 112 Change anti syphon valve to check valve for fuel oil suction pipe $2,266.00 2/25/00 $2,266.00 Approved 113 Make the hatch in the tank room self closing by changing the fusible link to electfic thermal link and tie in to Intergen Panel $3,253.00 6/26/00 $3,253.00 Approved 114 F&l new switch for the Intergin System In the tank room $1,221.00 $1,221.00 Approved 115 F&l connected reserve Intergin supply $39,264.00 $39,264.00 Approved F&l disconnect switch for hatch door release $762.00 $762.00 Approved

Total $1,420,250.00 $1,215,116.00

NYC-WTC_000171288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173550

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →