Funding request for OEM traffic feed installation, April 1999

Machine-extracted title · confidence 50%

Memo dated April 27, 1999 requesting funding from the construction budget for metro traffic feed and dish installation at the Mayor's Office of Emergency Management.

NYC-WTC_000172953–000172957

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172956
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

37 F&l stainless steel cladding to 20 existing window mullions 40166 ___ $0.00 VOID $0 00 38 Additional drains as per SKP 3 and SKP 4 in HC toilet rooms 23-3 & 23-32 $8,346.00 1725799 $7,000.00 Approved $7,000.00 39R Mobile PBF 15"W x 17 3/4" D LN Novalink furniture not included in base bid $26 391^ 12/29/98 $26 391.05 Approved $26,391 00 40" Chop concrete and weld new rebar to existing rebar in trench w/3" overlap $26127.00 1/25/99 $21 300.00 Approved $21.300 00 41 Antenna support per revised sketch from Cantor adding 4 steel clips welded to web $16 807.00 1/25/99 $14,655.00 Approved $14,500.00 "TF" F&l 4 type G wall washers in room #23-40 as per FSK-51 2202 $0.00 VOID $0.00 43 RG-6U plenum cable for Time & Warner TV as per John Hughes letter $11,759.60 1/25/99 $11,000.00 Approved $11,000,00 44 R F&l oil piping as per revised routing sketch FSK50 & SK58 dated 3/19/99 85893 475755 $o.0o VOID $0.00 "Is” F&l 1 custom press panel & installation & termination of cables in to it $1,43O.0O 12/29/98 $1,430.00 Approved $1,430.00 46 Additional electrical work in room 23-50 and 23-18 for power supply/sequrity equip $0.00 VOID $0.00 47 Furnish 3 stainless steel flexes for the generators $3,941.00 1/4/99 $3,941.00 Approved $3.941.00 48 Additional work as per Swanks memo datedl 2/29/98 $4179.00 1/25/99 $4179.00 Approved $4,679.00 49 Change ceiling tile & sprinklers in press room $6779.00 3/11/99 $6779.00 Approved $6,779.00 50 Correct incompatability between Ace video equip & Lutron dimming system $1,06710 1726/99 $1,067.00 Approved $1,067.00 51 Various changes in storage room shelving units $751.OO 7755755 575715 Approved $751.00 52 Various electrical changes as per R8 Samuel's work orders 536,987.00 3/11/99 $36,000.00 Approved $36,000.00 53 Various electrical changes as per RB Samuel's work orders $2198.00 1711755 $2,696.00 Approved $2,898 00 54 Man hour cost for moving computer equipments on 23rd floor $2171.OO 3/11/99 $2,671.00 Approved $2,671.00 55 Removal /roinstallation of electrical work due to new routing of fuel line $34154.00 3/11/99 $29100.00 Approved $29,000.00 56 1 duplex outlet on 1 st floor with cable in 1" condui" ■75242 $0.00 VOID $0.00 57 Additional equipment & labour for security work as per SHCA memo dated 12/17/96 $68,613.00 3/11/99 $63,000.00 Approved $63,000.00 58 Labour for moving computer equipments 5515515 3/11/99 $5106.00 Approved $5,506.00 59 1 duplex outlet on 1 st floor w/wirtng through existing 4" conduit $10,948.00 3/11/99 $10,948.00 Approved $10,948.00 60 Close gap at steel in hurricane wall w/16 gauge steel plate as per FSK-54 $8714.00 3/11/99 $871410 Approved $8,114.00 61 Mag lock over ride button for doors at toilet rooms, water storage room.bunker rooms and door leading to bunker room area______________________________________ $2,785.00 3/11/99' $2,400.00 Approved $2,400.00 62 Roof repair as per details at new curb from Kemper system $9179.00 3/11/99 $9,679.00 Approved $9,679.00 63 Additional electrical work as per RB Samuels work orders 5717515 3/11/99 $1,912.00 Approved $1,912.00 64 Additional electrical work as per RB Samuels work orders_______________________ $771410 3/11/99 $6,500.00 Approved $6,500.00 65 X-Ray machine and badging system $26,336.00 2/16/99 $22721.00 Approved $22,721.00 66 Press room floor and podium $15,460.00 3/11/99 $14,800.00 Approved $14,800.00 67 Various electrical changes as per RB SamueFs work orders $2194.00 3/11/99 $2194.00 Approved $2,894.00 68 F&l astragal on door #5 ACME pair of doors 406 ~ $5.00 VOID $0.00 69 F&l closer, roof chain and provide additional keys $780.00 3711/99 $672.00 Approved $672.00 70 Three (3) 28" dia. And Two (2) 21" dia. Cast magnum plaques 56,11410 3/11/99 $6,114.00 Approved $6,114.00 71 3 phase 30 amp wiring for circulating pumps $4179.00 3/11/99 $4,579.00 Approved $4,579.00 72 73 F&I Two (2) Alto Shaam cooking and holding oven model 1000-THI/HD/D Furnish two (2) Luxor TVP44 -44" TV cart for PIU room monitors 511.63910 $1180.00 HOLD HOLD to be approved $11,539.00 S 74 F&l blackout shade bands for press room & Mayor’s conference room 5413715 5515 Not to ba approved $4,631.00 75 F&l (2) two UPS units $4174.00 1725799 j4,6t4.00 Approved $4,874.00 76 Relocate existing cold water make-up line as requested by Building Engineers 575715 to be approved $701.00 A&E fee for additional Audio-visual scope of work____________________________ $18,5OO.0O $0.00 VOID $18,500.00 77 Dam closure, flashing and Aluminum drip pan at radio room on the roof____________ ■ 11IIIIII11—m HOLD $24,274.00 78 Various work by RB Samuels/Precision inleriors/Miller Druck $7,710.00 to ba reviewed $7,710.00 79 F&i one hundred additional reinforcing plates for the blast proof & access doors IBSSKDff letter from SHCA to bo reviewed $6,955.00 80 Removal of additional granite flooring regarding fuel oil pipe work $1,631.6^) 5515 Not to be approved $1,631.00 ' 81 Fasten radio room walls to the structural steel with special clips $6,^28.QO Hold HOLD $8,228.00 . 92 Replace door & frame of radio room with blast resistant door $8.313.(5& ncns HOLD 83 Not received 84 Not received Not received Reroute new exhaust duct around the existing steel beam i2.763.00 vocv to be reviewed $2,763.00 87 Not received 88 Revised cost for/del oil piping through 2nd floor machine room corridor $120,957.00 to be reviewed $120,957,001

NYC-WTC_000172956

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172956Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved construction costs, April 2002 · Box 7DCAS

NYC-WTC_000171286

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗
DCAS letter re: Change orders for OEM, Jan 1999 · Box 7DCAS

NYC-WTC_000171802

Letter from DCAS approving negotiated costs for multiple change orders submitted by a contractor for the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →