Response letter regarding 120 Wall Street inspection, Apr 2002 · page 1NYC-WTC_000094844
Letter responding to DEP notice confirming that 120 Wall Street was inspected and cleaned prior to re-occupancy in September 2001.
Environmental Protection, Dept. of · Box DEP Box 02
Label sheet for 140 Broadway, 70 Liberty Street · page 21NYC-WTC_000105698
A document label identifying the location as 140 Broadway and 70 Liberty Street with a unique NYC-WTC tracking number.
Environmental Protection, Dept. of · Box DEP Box 37
Label sheet for 140 Broadway, 70 Liberty Street · page 22NYC-WTC_000105698
A document label identifying the location as 140 Broadway and 70 Liberty Street with a unique NYC-WTC tracking number.
Environmental Protection, Dept. of · Box DEP Box 37
Label sheet for 140 Broadway, 70 Liberty Street · page 24NYC-WTC_000105698
A document label identifying the location as 140 Broadway and 70 Liberty Street with a unique NYC-WTC tracking number.
Environmental Protection, Dept. of · Box DEP Box 37
Label sheet for 140 Broadway, 70 Liberty Street · page 25NYC-WTC_000105698
A document label identifying the location as 140 Broadway and 70 Liberty Street with a unique NYC-WTC tracking number.
Environmental Protection, Dept. of · Box DEP Box 37
Asbestos cleanup response letter, 120 Broadway, Feb 2002 · page 1NYC-WTC_000123776
Contractor letter to DEP responding to notice regarding asbestos inspection and cleaning at 120 Broadway prior to re-occupancy.
Environmental Protection, Dept. of · Box DEP Box 50
Congressional response to EPA cleanup responsibility, March 2002 · page 10NYC-WTC_000143980
Representative's news release criticizing the EPA for inadequate response to cleanup of buildings contaminated by the World Trade Center collapse and calling for removal of debris…
Environmental Protection, Dept. of · Box DEP Box 07
Draft outline for asbestos project monitoring contract, May 2002 · page 7NYC-WTC_000144568
Draft document outlining enforcement requirements and responsibilities for the World Trade Center debris removal and environmental cleanup.
Environmental Protection, Dept. of · Box DEP Box 08
NYC Law Department letter regarding EPA draft report excerpts, July · page 44NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Environmental Protection, Dept. of · Box DEP Box 08
Legal correspondence regarding WTC litigation, August 2003 · page 1NYC-WTC_000152072
Law firm correspondence addressing World Trade Center-related litigation involving multiple defendants and the Port Authority.
Environmental Protection, Dept. of · Box DEP Box 26
Legal correspondence regarding WTC litigation, August 2003 · page 2NYC-WTC_000152072
Law firm correspondence addressing World Trade Center-related litigation involving multiple defendants and the Port Authority.
Environmental Protection, Dept. of · Box DEP Box 26
NYC-WTC_000161485 · page 4Environmental Protection, Dept. of · Box DEP Box 42
NYC-WTC_000161485 · page 7Environmental Protection, Dept. of · Box DEP Box 42
Consultant meeting minutes #15, Oct 1998 · page 2NYC-WTC_000166704
Minutes from the 15th consultant meeting at 7 World Trade Center dated October 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant meeting minutes #9, Sep 1998 · page 2NYC-WTC_000166748
Minutes from the 9th consultant meeting at 7 World Trade Center dated September 15, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Document record NYC-WTC_000166786, Citywide Administrative Services · page 1NYC-WTC_000166787
Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Administrative record file reference for 7 WTC project, undated · page 53NYC-WTC_000166927
File identification record associated with the Department of Citywide Administrative Services and 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167068 · page 51Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #65 approval letter, X-ray equipment, Jan 1999 · page 1NYC-WTC_000167168
Letter approving Change Order #65 for the supply and installation of X-ray and video badging equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Orders #23-51 approval memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000167170
Memorandum approving multiple change orders for various construction items at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Orders #12-21 approval memo, Oct 1998 · page 1NYC-WTC_000167178
Memorandum approving change orders for the provision of electrical equipment and switchgear at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Orders #11-17 approval memo, Oct 1998 · page 1NYC-WTC_000167180
Letter approving change orders for drawing revisions related to equipment relocation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Orders #6-10 approval memo, Sept 1998 · page 1NYC-WTC_000167184
Letter approving change orders for door specification changes and drawing revisions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Orders #3 and #4 approval memo, Aug-Sept 1998 · page 1NYC-WTC_000167186
Memorandum approving change orders for miscellaneous electrical changes at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 approval for sheetrock wall offset, Aug 1998 · page 1NYC-WTC_000167188
Letter approving Change Order #1 for furnishing and installing a sheetrock wall offset on the 23rd floor to clear return air ducts.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment request letter for 7 WTC construction rent, July 1998 · page 1NYC-WTC_000167190
Certified mail from the landlord requesting a payment of $7 million pursuant to Article 6 of the lease.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction cost estimate approval documentation, July 1998 · page 1NYC-WTC_000167191
DCAS approval letter and supporting documentation for construction cost estimates for Mayor's Office of Emergency Management at 7 World Trade Center, July 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional services authorization form, Nov 1998 · page 1NYC-WTC_000167198
Authorization form for scope revisions to the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
SHCA architectural and engineering services approval, June 1998 · page 1NYC-WTC_000167199
DCAS approval of SHCA proposal to perform architectural, structural, and mechanical engineering services for 7 World Trade Center Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cover letter regarding OEM project, 7 WTC, Jun 1998 · page 1NYC-WTC_000167202
A cover letter dated June 30, 1998, submitted by hand regarding the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal cover letter for OEM design services, June 1998 · page 1NYC-WTC_000167203
Cover letter submitting a proposal for architectural and engineering design services to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal cover letter for OEM design services, June 1998 · page 3NYC-WTC_000167203
Cover letter submitting a proposal for architectural and engineering design services to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmission log, June 1998 · page 1NYC-WTC_000167208
One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmission log, June 1998 · page 2NYC-WTC_000167208
One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167211 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167211 · page 2Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167219 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal for security design services, Feb 1998 · page 1NYC-WTC_000167220
Proposal for security consultant design services submitted to the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal for security design services, Feb 1998 · page 2NYC-WTC_000167220
Proposal for security consultant design services submitted to the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167227 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167229 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167229 · page 2Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval letter re: OEM consultant team, Nov 1997 · page 1NYC-WTC_000167244
Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval letter re: OEM consultant team, Nov 1997 · page 2NYC-WTC_000167244
Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval letter re: OEM consultant team, Nov 1997 · page 3NYC-WTC_000167244
Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant proposal letter re: OEM design services, Oct 1997 · page 1NYC-WTC_000167249
Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant proposal letter re: OEM design services, Oct 1997 · page 2NYC-WTC_000167249
Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant proposal letter re: OEM design services, Oct 1997 · page 3NYC-WTC_000167249
Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural and engineering design services proposal, 7 World Trade Center, · page 1NYC-WTC_000167291
Architectural firm proposal for design services for Mayor's Office of Emergency Management center at 7 World Trade Center, including scope of work and consultant proposals, dated…
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural and engineering design services proposal, 7 World Trade Center, · page 2NYC-WTC_000167291
Architectural firm proposal for design services for Mayor's Office of Emergency Management center at 7 World Trade Center, including scope of work and consultant proposals, dated…
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural and engineering design services proposal, 7 World Trade Center, · page 3NYC-WTC_000167291
Architectural firm proposal for design services for Mayor's Office of Emergency Management center at 7 World Trade Center, including scope of work and consultant proposals, dated…
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter on construction cost estimates, July 1998 · page 1NYC-WTC_000167308
Letter from DCAS reviewing and summarizing documentation for construction cost estimates for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter requesting cost reductions, July 1998 · page 1NYC-WTC_000167310
Letter from DCAS requesting proposed cost reductions for work items in the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter requesting cost reductions, July 1998 · page 2NYC-WTC_000167310
Letter from DCAS requesting proposed cost reductions for work items in the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter on alteration costs, Aug 1998 · page 1NYC-WTC_000167314
Letter from DCAS regarding approved costs and revisions for alteration work on the 1st, 7th, and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal letter for hurricane wall, June 1998 · page 1NYC-WTC_000167316
Letter transmitting construction proposals for a hurricane wall and related work at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for wall changes, June 1998 · page 1NYC-WTC_000167317
Budget estimate from Ambassador Construction for wall construction changes at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Travel and expense report, 7 World Trade Center, Oct 1999 · page 1NYC-WTC_000167369
Travel and reimbursable expense report for work at 7 World Trade Center during October 1999, including transportation charges.
Citywide Administrative Services, Dept. of · Box 7DCAS
Site survey report for 7 WTC, Aug 1998 · page 1NYC-WTC_000167515
Report detailing a site survey at 7 World Trade Center on August 18 and 25, 1998, with transportation expenses.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax regarding door release approval rejection, Dec 1998 · page 1NYC-WTC_000167666
Correspondence informing that the Port Authority rejected the final request for approval of doors 40A and 40B at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
List of architectural drawings for Bulletin #1, July 1998 · page 4NYC-WTC_000167669
Index sheet listing architectural drawings including floor plans and ceiling layouts issued for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for project correspondence, July 1998 · page 1NYC-WTC_000167674
Cover sheet for a fax regarding the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for project correspondence, June 1998 · page 1NYC-WTC_000167675
Cover sheet for a fax providing a summary of the Mayor's Office of Emergency Management project request at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter on hurricane wall design approval, June 1998 · page 1NYC-WTC_000167678
Correspondence confirming landlord approval of the hurricane wall design subject to the installation of water detectors.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM meeting approval memo, 7 World Trade Center, May 1998 · page 1NYC-WTC_000167692
Memo documenting DCAS/OEM approval of architectural sketches and supporting data for 7 World Trade Center emergency management facility following design review meeting.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project coordination memo, MOEM 7 World Trade Center, April 1998 · page 1NYC-WTC_000167696
Interdepartmental coordination memo for Mayor's Office of Emergency Management 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project routing memo, MOEM 7 World Trade Center, April 1998 · page 1NYC-WTC_000167697
Architectural firm distribution memo routing project information regarding Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project status memo, MOEM 7 World Trade Center, April 1998 · page 1NYC-WTC_000167702
Interdepartmental coordination memo for Mayor's Office of Emergency Management project distribution.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000167704 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal for OEM design documents, Mar 1998 · page 1NYC-WTC_000167719
Cover sheet for a fax transmission regarding Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal re: noise levels at generator room, Mar 1998 · page 1NYC-WTC_000167729
Cover sheet for a fax transmission regarding expected noise levels outside the emergency generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM equipment data summary memo, 7 WTC, Feb 26, 1998 · page 1NYC-WTC_000167734
Memo summarizing outstanding OEM equipment product data and catalog cuts for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Design review correspondence for OEM, Feb 4, 1998 · page 1NYC-WTC_000167741
Cover letter transmitting a memo regarding design specifications for the Mayor's Office of Emergency Management at 7 World Trade Center to City officials.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM 7th and 23rd floor preliminary construction budget, February 1998 · page 5NYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: OEM security vendor selection, Jan 21, 1998 · page 1NYC-WTC_000167750
Inquiry regarding the resolution of a security issue and confirmation of the selected vendor for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: OEM security vendor selection, Jan 21, 1998 · page 2NYC-WTC_000167750
Inquiry regarding the resolution of a security issue and confirmation of the selected vendor for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design services proposal, 7 WTC, October 1997 · page 1NYC-WTC_000167764
Proposal for additional architectural services to create AutoCAD files for 23rd floor existing conditions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo requesting cost clarifications, 7 WTC, June 1998 · page 1NYC-WTC_000167792
DCAS requests clarifications on itemized costs for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Certified letter approving Final Plans, 7 WTC, May 1998 · page 1NYC-WTC_000167796
Certified letter from DCAS approving the second issue of Final Plans for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter requesting plan revisions, 7 WTC, April 1998 · page 1NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost approval letter, Mayor's Office Emergency Management generators, Apr 1998 · page 1NYC-WTC_000167821
Letter from the Division of Real Estate Services approving costs totaling $717,890 for generator equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost approval letter, Mayor's Office Emergency Management generators, Apr 1998 · page 1NYC-WTC_000167822
Letter approving costs totaling $717,890 for generator equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Design review comments memo, Mayor's Office Emergency Management, Feb 1998 · page 1NYC-WTC_000167835
Memo transmitting architectural comments on design drawings for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for proposals: Architectural services, OEM, 1998 · page 3NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for proposals: Architectural services, OEM, 1998 · page 7NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for proposals: Architectural services, OEM, 1998 · page 9NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for proposals: Architectural services, OEM, 1998 · page 10NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for proposals: Architectural services, OEM, 1998 · page 11NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax: Concerns regarding painting A/V enclosures, Nov 1998 · page 1NYC-WTC_000167862
Correspondence expressing concern about painting A/V enclosure panels at the Mayor's Office of Emergency Management site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal: OEM project documents, Feb 1998 · page 1NYC-WTC_000167869
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Roof shed construction site visit, Dec 1998 · page 1NYC-WTC_000167872
Report on a roof site visit noting items related to roof shed construction for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Subcontractor bid list fax, Ambassador Construction, May 22 1998 · page 1NYC-WTC_000167929
Fax cover sheet from Ambassador Construction Co. dated May 22, 1998, listing subcontractor bidders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Milo Kleinberg Design Associates fax cover sheet, July 17 1997 · page 1NYC-WTC_000168166
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.
Citywide Administrative Services, Dept. of · Box 7DCAS
Milo Kleinberg Design Associates fax cover sheet, July 17 1997 · page 1NYC-WTC_000168193
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, listing TAA application forms and riders.
Citywide Administrative Services, Dept. of · Box 7DCAS
Distribution list, 7 World Trade Center 23rd floor SHCA drawing, · page 1NYC-WTC_000168221
Distribution list for SHCA architectural drawing set for Mayor's Office of Emergency Management space at 7 World Trade Center dated November 21, 1997.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approval memo for OEM project, Feb 2000 · page 1NYC-WTC_000168332
Memo dated January 28, 2000 approving change orders for electric heaters and generator room insulation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent payment approval memo, Feb 2000 · page 1NYC-WTC_000168335
Memo dated February 17, 2000 authorizing payment for construction rent invoices related to Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo for OEM project, Feb 2000 · page 1NYC-WTC_000168337
Memo dated February 14, 2000 submitting change order #112 for valve replacement work at Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo for OEM project, Feb 2000 · page 1NYC-WTC_000168338
Letter dated February 14, 2000 submitting change order #112 for valve replacement work at Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #111 submission memo, Feb 2000 · page 1NYC-WTC_000168341
Letter submitting change order #111 for insulation, painting, and hardware work at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Jan 2000 · page 1NYC-WTC_000168342
Letter from Ambassador Construction submitting change order #111 for insulation, painting, and heater installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approvals #96, #109, #110, 7 WTC, 2000 · page 1NYC-WTC_000168344
Department approval of three change orders for heat tracing, electrical work, and sprinkler head installation totaling $17,198.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Jan 2000 · page 1NYC-WTC_000168347
Letter submitting change order #110 for installing astragels and a sprinkler head at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Jan 2000 · page 1NYC-WTC_000168349
Letter submitting change order #109 for door lock repairs and electrical installations at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #108 approval, video cables, 7 WTC, Dec 1999 · page 1NYC-WTC_000168351
Department approval of change order for video cable connections with project budget summary.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approvals #102, #106, #107, 7 WTC, 1999 · page 1NYC-WTC_000168353
Department memo approving costs for data box installation and outlet modifications in the Mayor's conference room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Dec 1999 · page 1NYC-WTC_000168355
Letter submitting change order #108 for fiber optic video cable connections and test splices at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Smoke room painting, 7 World Trade Center, Dec 1999 · page 1NYC-WTC_000168356
Change order for painting smoke room at Mayor's Office of Emergency Management facility, $650.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000168358 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #105 Submission, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168359
Contractor submission for Change Order #105 regarding audiovisual system expansion and library head end drawings.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #104 Approval, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168361
Department memo approving a negotiated cost of $50,000 for conduit and fiber optic cable installation for the camera system.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approvals #98 & #103, 7 WTC, 1999 · page 1NYC-WTC_000168363
Department memo approving costs for electrical lighting changes and press feed camera work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approvals #93, #97, #99 & #100, 7 WTC, · page 1NYC-WTC_000168365
Department memo approving costs for shade motor installation and circuit work at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Nov 1999 · page 1NYC-WTC_000168367
Letter submitting change order #104 for galvanized riser and fiber optic cable installation for telephone and camera systems at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Nov 1999 · page 1NYC-WTC_000168369
Letter submitting change order #103 for audiovisual press feed and camera system work on the 1st, 7th, and 23rd floors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #103 Submission, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168370
Contractor submission for Change Order #103 covering audiovisual work on the 1st, 7th, and 23rd floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Nov 1999 · page 1NYC-WTC_000168371
Letter submitting change order #102 for electrical modifications on the 1st, 7th, and 23rd floors at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #101 submission memo, Nov 1999 · page 1NYC-WTC_000168372
Letter submitting change order #101 for a wall-mounted Halotron 1 fire extinguisher at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #101 Submission, 7 World Trade Center, Oct 1999 · page 1NYC-WTC_000168373
Contractor submission for Change Order #101 to provide a wall-mounted Halotron 1 fire extinguisher.
Citywide Administrative Services, Dept. of · Box 7DCAS
Engineering services authorization, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168374
Change order for engineering work related to facility systems and infrastructure, $20,625.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #99 Submission, 7 World Trade Center, Oct 1999 · page 1NYC-WTC_000168375
Contractor submission for Change Order #99 to install separate electrical circuits in executive and coffee areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #99 Submission, 7 World Trade Center, Oct 1999 · page 1NYC-WTC_000168376
Contractor submission for Change Order #99 to install separate electrical circuits in executive and coffee areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #98 Submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168378
Contractor submission for Change Order #98 to convert press room lights and install louvered fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order review correspondence, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168379
Letter from Citywide Administrative Services reviewing and negotiating costs for multiple change orders at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #97 Submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168384
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #97 submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168385
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #096, 7 World Trade Center, November 1999 · page 1NYC-WTC_000168386
Change order #096 for $10,225 to furnish and install heat tracing on hot water line at 7 World Trade Center Mayor's Office, 1st, 7th, and 23rd floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #096 submission, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168387
Letter submitting change order #096 for heat tracing installation on a hot water line in the generator room for $10,225.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #95 Submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168388
Letter submitting change order #95 to install three new electrical receptacles under a conference room table for $1,046.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #95 submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168389
Letter submitting change order #95 to install three new electrical receptacles under a conference room table for $1,046.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #094, 7 World Trade Center, November 1999 · page 1NYC-WTC_000168390
Change order #094 (revised) for $10,417 to furnish and install automatic air release valve and visual level indicator at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #094 Submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168391
Letter submitting change order #94 to install equipment following a domestic transfer pump test for $7,291.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #94 submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168392
Letter submitting change order #94 to install equipment following a domestic transfer pump test for $7,291.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #93 Submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168393
Letter submitting change order #093 to wire shade motors and controllers with new circuits for $4,892.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #93 submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168394
Letter submitting change order #093 to wire shade motors and controllers with new circuits for $4,892.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #92 Submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168395
Letter submitting Change Order #92 for installing a wall-mounted kindoff in the press room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #92 submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168396
Letter submitting change order #92 to install a kindoff on a wall in the press room for $380.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #91 submission, 7 WTC, Aug 1999 · page 1NYC-WTC_000168397
Letter submitting change order #91 for $6,565 to remedy water leakage on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #91 submission, 7 WTC, July 1999 · page 1NYC-WTC_000168399
Letter from Ambassador Construction submitting change order #91 for $6,565 to remedy leakage on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #89 submission, 7 WTC, June 1999 · page 1NYC-WTC_000168402
Letter submitting change order #89 for $7,553 to install power and control wiring for the Inergen system in the fuel oil tank room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #89 submission, 7 World Trade Center, June 1999 · page 1NYC-WTC_000168403
Letter submitting change order #89 for power and control wiring for the Inergen system in the fuel oil tank room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #88 submission, 7 WTC, June 1999 · page 1NYC-WTC_000168407
Letter submitting change order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #88 submission, 7 WTC, June 1999 · page 1NYC-WTC_000168409
Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #87 submission, 7 WTC, June 1999 · page 1NYC-WTC_000168411
Letter submitting change order #87 for $1,276 to install a UPS conversion kit in an office at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #87 submission, 7 WTC, June 1999 · page 1NYC-WTC_000168412
Contractor submits Change Order #87 for $1,276 to install a UPS conversion kit in an office at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for lease services, 7 WTC, May 1999 · page 1NYC-WTC_000168413
Invoice issued pursuant to a lease agreement for space on the 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #85 submission, 7 WTC, May 1999 · page 1NYC-WTC_000168422
Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #84, 7 WTC, April 1999 · page 1NYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #83 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168427
Letter submitting change order #83 for $2,805 to install recess boxes for light fixtures due to ductwork conflicts in the EEOC area.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #82 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168430
Contractor submits Change Order #82 for $8,313 to replace the radio room door with a new blast-resistant door.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #82 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168431
Contractor submits Change Order #82 for $8,313 to replace the radio room door with a new blast-resistant door.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #80, 7 WTC, April 1999 · page 1NYC-WTC_000168434
Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #044R for fuel oil line work, 7 WTC, · page 1NYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #78 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168446
Contractor submits Change Order #78 for $6,629 to reinstall speakers and fire devices during ceiling tile work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #78 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168448
Contractor submits Change Order #78 for $6,629 to reinstall speakers and fire devices during ceiling tile work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #77 submission, 7 WTC, April 1999 · page 1NYC-WTC_000168455
Contractor submits Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #77 for dam closures, 7 WTC, Apr 1999 · page 1NYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #75 approval, UPS system, 7 WTC, March 1999 · page 1NYC-WTC_000168461
DCAS approves Change Order #75 for $4,874 to supply and install a UPS system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #75 for UPS units, 7 WTC, Mar 1999 · page 1NYC-WTC_000168464
Submission of Change Order #75 for $4,874 to furnish and install two UPS units at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #74 for blackout shades, 7 WTC, Mar 1999 · page 1NYC-WTC_000168466
Submission of Change Order #74 for $4,631 to install blackout shade bands in conference rooms at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #73 for TV carts, 7 WTC, Mar 1999 · page 1NYC-WTC_000168468
Submission of Change Order #73 for $1,580 to furnish two 44-inch TV carts for the PIU room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for UPS design, 7 WTC, Mar 1999 · page 1NYC-WTC_000168470
Architectural firm authorization to proceed with design services for a backup UPS system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of multiple change orders, 7 WTC, Feb-Mar 1999 · page 1NYC-WTC_000168471
City correspondence reviewing and negotiating costs for numerous submitted change orders related to facility work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #71 for electrical work, 7 WTC, Feb 1999 · page 1NYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #70 for plaques, 7 WTC, Feb 1999 · page 1NYC-WTC_000168481
Memo submitting Change Order #70 for $6,114 to furnish and install cast magnum plaques at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #69 for hardware, 7 WTC, Feb 1999 · page 1NYC-WTC_000168484
Memo submitting Change Order #69 for $780 to furnish keys, chains, and door closers at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #68 for door hardware, 7 WTC, Feb 1999 · page 1NYC-WTC_000168485
Memo submitting change order #68 for the installation of an astragal on door #05 at a cost of $406.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #68 for door hardware, 7 WTC, Feb 1999 · page 1NYC-WTC_000168486
Memo submitting Change Order #68 for $406 to install an astragal on a door pair at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #67 for computer cords, 7 WTC, Feb 1999 · page 1NYC-WTC_000168487
Memo submitting change order #67 to furnish and make up five cords with 15 amp plugs at a cost of $2,894.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #67 for computer cords, 7 WTC, Feb 1999 · page 2NYC-WTC_000168487
Memo submitting change order #67 to furnish and make up five cords with 15 amp plugs at a cost of $2,894.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #67 for computer work, 7 WTC, Feb 1999 · page 1NYC-WTC_000168489
Memo submitting Change Order #67 for $2,894 to furnish cords and relocate speaker strobes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #66 for floor boxes, 7 WTC, Feb 1999 · page 1NYC-WTC_000168491
Memo submitting change order #66 to install floor boxes with plates and relocate wiring under the floor at a cost of $15,460.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #66 for floor boxes, 7 WTC, Feb 1999 · page 2NYC-WTC_000168491
Memo submitting change order #66 to install floor boxes with plates and relocate wiring under the floor at a cost of $15,460.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #66 for floor boxes, 7 WTC, Feb 1999 · page 1NYC-WTC_000168493
Memo submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #65 for X-ray equipment, 7 WTC, Feb 1999 · page 2NYC-WTC_000168495
Memo submitting change order #65 to furnish an X-ray system consisting of SYS-222-EG&G at a cost of $26,336.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #065 for X-ray equipment, 7 WTC, Jan 1999 · page 1NYC-WTC_000168497
Memo from Ambassador Construction submitting Change Order #065 for $26,336 to furnish X-ray and video badging equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #64 memo, 7 WTC, Feb 1999 · page 2NYC-WTC_000168499
Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room and TV server at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #64 for LAN cabling, 7 WTC, Feb 1999 · page 1NYC-WTC_000168501
Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #63 memo, 7 World Trade Center, Feb 1999 · page 2NYC-WTC_000168502
Memo submitting Change Order #63 for pipe sleeve and cable installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #063 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168504
Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #62 memo, 7 WTC, Feb 1999 · page 1NYC-WTC_000168506
Memo submitting Change Order #62 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #62 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168507
Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #61 memo, 7 World Trade Center, Jan 1999 · page 2NYC-WTC_000168508
Memo submitting Change Order #61 for wiring auxiliary contacts to magnetic locks at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #061 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168510
Memo from Ambassador Construction submitting Change Order #061 for $2,785 to wire auxiliary contacts to magnetic locks and rewire doors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #60 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168513
Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #059 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168519
Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #58 memo, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168520
Memo submitting Change Order #58 for removing computers from the PIU room and connecting them in the EOC area.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #058 memo, 7 WTC, Jan 1999 · page 1NYC-WTC_000168521
Memo from Ambassador Construction submitting Change Order #058 for $5,506 to remove computers from the PIU room and perform LAN patching at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #57 memo, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168522
Memo submitting Change Order #57 for additional security work at 7 World Trade Center as requested by OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #57 memo, 7 World Trade Center, Jan 1999 · page 2NYC-WTC_000168522
Memo submitting Change Order #57 for additional security work at 7 World Trade Center as requested by OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #57 Memo: 7 WTC Security Work, Jan 1999 · page 1NYC-WTC_000168524
Memo submitting Change Order #57 for additional security work including locks and exit buttons at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #56 memo, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168526
Memo submitting Change Order #56 for installing a duplex outlet on a fiber rack at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #54 for computer equipment relocation at 7 World · page 1NYC-WTC_000168532
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #53 for computer equipment at 7 World Trade · page 1NYC-WTC_000168536
Memo submitting Change Order #53 for mounting computer equipment and patching cables in the lan room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #52 for electrical outlet work at 7 World · page 1NYC-WTC_000168541
Memo submitting Change Order #52 for capping outlets and installing new circuits in the Commissioner's office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #51 for shelving modifications at 7 World Trade · page 1NYC-WTC_000168546
Memo submitting Change Order #51 for adjusting shelving heights and adding units on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #50 for Lutron interface work at 7 World · page 1NYC-WTC_000168549
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #49, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168551
Memo submitting Change Order #49 for installing ceiling tiles and relocating sprinkler heads in the press room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #49 for ceiling tiles and sprinklers at 7 · page 1NYC-WTC_000168552
Memo submitting Change Order #49 to provide ceiling tiles and relocate sprinkler heads in the press room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #48, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168554
Memo submitting Change Order #48 for installing a new access door and hardware at room 23-51 in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #48 for access door at 7 World Trade · page 1NYC-WTC_000168555
Memo submitting Change Order #48 to furnish and install a new access door in room 23-51.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #47, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168557
Memo submitting Change Order #47 for furnishing stainless steel flexes for generators at 7 World Trade Center due to height restrictions.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #47 for generator flexes, 7 WTC, Dec 1998 · page 1NYC-WTC_000168558
Ambassador Construction submits Change Order #47 to furnish stainless steel flexes for generators at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #46, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000168560
Memo submitting Change Order #46 to provide power for a supply in room 23-50 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #46 for power circuits, 7 WTC, Dec 1998 · page 1NYC-WTC_000168561
Ambassador Construction submits Change Order #46 to provide power supply and security equipment circuits at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #45 for press panel, 7 WTC, Dec 1998 · page 1NYC-WTC_000168564
Ambassador Construction submits Change Order #45 to install a custom press panel and terminate cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #44 for fuel piping, 7 WTC, Dec 1998 · page 1NYC-WTC_000168566
Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #43, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168568
Memo submitting Change Order #43 for installing RG-6U plenum cable for the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #43 for cable installation, 7 WTC, Dec 1998 · page 1NYC-WTC_000168569
Ambassador Construction submits Change Order #43 to install RG-6U plenum cable at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #42, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168570
Memo submitting Change Order #42 to install four type G wall washers in room 23-40 at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #42 for wall washers, 7 WTC, Dec 1998 · page 1NYC-WTC_000168571
Ambassador Construction submits Change Order #42 to install four type G wall washers at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #41, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168572
Memo submitting Change Order #41 for revised antenna support details at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #41 for antenna support, 7 WTC, Dec 1998 · page 1NYC-WTC_000168573
Ambassador Construction submits Change Order #41 to install revised antenna support details at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #40, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168575
Memo submitting Change Order #40 for welding new rebar into trench at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #40 for rebar work, 7 WTC, Dec 1998 · page 1NYC-WTC_000168576
Ambassador Construction submits Change Order #40 to weld new rebar and chop concrete at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #39-Revised, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168578
Memo submitting revised Change Order #39 for installing equipment racks and RJ45 plates at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38, 7 World Trade Center, Dec 1998 · page 1NYC-WTC_000168580
Memo submitting Change Order #38 for installing additional drains in toilets and a sprinkler closet at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38 for drain installation, 7 WTC, Dec 1998 · page 1NYC-WTC_000168581
Ambassador Construction submits Change Order #38 to install additional drains in toilets and a sprinkler closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #37, stainless steel cladding, 7 WTC, Nov 1998 · page 1NYC-WTC_000168583
Memo submitting Change Order #37 to install polished stainless steel cladding around window mullions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #36, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000168584
Memo submitting Change Order #36 to waterproof the generator room on the 7th floor with Dex-o-Tex flooring at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #36 for generator room waterproofing, 7 World Trade · page 1NYC-WTC_000168585
A memo submits Change Order #36 to waterproof the generator room on the 7th floor with Dex-o-Tex at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #35, fiber optic termination, 7 World Trade Center, · page 1NYC-WTC_000168587
Contractor submission for change order to terminate fiber optic cables and install patch panels at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #34, metal cap flashing installation, 7 World Trade · page 1NYC-WTC_000168588
Contractor submission for change order to install new metal cap flashing with drip return at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #34, metal cap flashing, 7 WTC, Nov 1998 · page 1NYC-WTC_000168589
Submission of Change Order #34 for installing a new metal cap flashing with drip return at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #33, conduit extension, 7 WTC, Nov 1998 · page 1NYC-WTC_000168590
Memo submitting Change Order #33 to extend conduit and install grounding at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #33, conduit extension, 7 WTC, Nov 1998 · page 1NYC-WTC_000168591
Submission of Change Order #33 for extending conduit and installing sleeves in the telco closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #31, security wire installation, 7 WTC, Nov 1998 · page 1NYC-WTC_000168593
Submission of Change Order #31 for furnishing and installing security wire in conduits at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #30, concrete pad and drilling, 7 WTC, Nov · page 1NYC-WTC_000168594
Memo submitting Change Order #30 for a new UPS concrete pad, drilling, and oil leak detection at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #30, concrete pad and drilling, 7 WTC, Nov · page 1NYC-WTC_000168595
Submission of Change Order #30 for a new UPS concrete pad and drilling into roof slabs at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #29, electrical outlets, 7 WTC, Nov 1998 · page 1NYC-WTC_000168597
Submission of Change Order #29 for adding duplex outlets and a switch in the training room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #28, conduit modification, 7 WTC, Nov 1998 · page 1NYC-WTC_000168598
Memo submitting Change Order #28 to modify conduits and install wire for electrical panels at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #28, conduit modification, 7 WTC, Nov 1998 · page 1NYC-WTC_000168599
Submission of Change Order #28 for modifying conduits to independently feed electrical panels at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #27, LAN room painting, 7 WTC, Nov · page 1NYC-WTC_000168601
Submission of Credit Change Order #27 for painting the LAN room floor instead of installing VCT flooring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #26R, drywall work, 7 WTC, Dec 1998 · page 1NYC-WTC_000168603
Memo submitting Revised Change Order #26R to perform drywall and door closing work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #26R, drywall and ceilings, 7 WTC, Dec · page 1NYC-WTC_000168605
Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26, drywall and ceilings, 7 WTC, Nov 1998 · page 1NYC-WTC_000168609
Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #25, microwave dish structural support, 7 World Trade · page 1NYC-WTC_000168611
Contractor submission for change order to provide structural support for microwave dishes on the roof at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #025, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000168612
Ambassador Construction submits Change Order #025 for structural support work on the roof of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #24, low voltage switches, 7 WTC, Nov · page 1NYC-WTC_000168614
Revised change order for installing low voltage switches and D-Sub conductors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000168615 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #024, monitor cabling, 7 WTC, Nov 1998 · page 1NYC-WTC_000168619
Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #23, steel reinforcement, 7 WTC, Nov 1998 · page 1NYC-WTC_000168621
Change order to furnish reinforcement plates and cut beams on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #023, steel reinforcement, 7 WTC, Nov 1998 · page 1NYC-WTC_000168622
Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 1NYC-WTC_000168623
Ambassador Construction submits Change Order #022 for installing multi-mode fiber optic cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #22R, fiber optic cable, 7 WTC, Nov · page 1NYC-WTC_000168625
Revised change order for installing multi-mode fiber optic cables connecting fan rooms and loading dock areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 1NYC-WTC_000168626
Ambassador Construction submits Change Order #022R for installing multi-mode fiber optic cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #21, I-beam work, 7 WTC, Oct 1998 · page 1NYC-WTC_000168628
Change order to add and remove I-beams at water tank and switch gear areas on the 7th floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #21 for beam and pad work, 7 World · page 1NYC-WTC_000168629
Change Order #21 submitted to add I-beams and concrete pads at water tank and switch gear areas on the 7th floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #20 for fan power circuits, 7 World Trade · page 1NYC-WTC_000168631
Change Order #20 submitted to provide 277-volt power for fan boxes and rewire existing circuits in response to RFI#33.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #19, acoustic panel replacement, 7 WTC, Oct 1998 · page 1NYC-WTC_000168632
Change order to replace 36 acoustic panels on the 7th floor as requested by the architect.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #19 for acoustic panel replacement, 7 World Trade · page 1NYC-WTC_000168633
Change Order #19 submitted to replace 36 acoustic panels on the 7th floor as requested by the architect.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #18 projector upgrade, 7 WTC, Oct 1998 · page 1NYC-WTC_000168635
Revised Change Order #18 for projector replacement and additional units at 7 World Trade Center dated October 21, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #17, 7 World Trade Center, Oct 1998 · page 1NYC-WTC_000168637
Revised Change Order #17 submitted to adjust material costs and install combination floor boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #17 floor boxes, 7 WTC, Oct 1998 · page 1NYC-WTC_000168638
Revised Change Order #17 submitted by Ambassador Construction for floor box installation at 7 World Trade Center dated October 22, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #16R electrical work, 7 WTC, Nov 1998 · page 1NYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #16 electrical work, 7 WTC, Oct 1998 · page 1NYC-WTC_000168647
Change Order #16 submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated October 15, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #15 wall sleeves, 7 WTC, Oct 1998 · page 1NYC-WTC_000168649
Change Order #15 submitted for wall sleeve installation at the 23rd floor of 7 World Trade Center dated October 12, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #15 sleeves, 7 WTC, Oct 1998 · page 1NYC-WTC_000168650
Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #14 generator test, 7 WTC, Oct 1998 · page 1NYC-WTC_000168653
Credit Change Order #14 submitted by Ambassador Construction to delete costs for emergency generator field test witnessing at 7 World Trade Center dated October 7, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #13 framing work, 7 WTC, Oct 1998 · page 1NYC-WTC_000168655
Change Order #13 submitted for framing and sheetrock work at 7 World Trade Center dated October 12, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #13 for 7 World Trade Center Framing, Oct · page 1NYC-WTC_000168656
Change order submitted to add framing sheetrock blocking at door frames and soffits on the 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #12 switch installation, 7 WTC, Oct 1998 · page 1NYC-WTC_000168657
Change Order #12 submitted for voltmeter and ammeter installation on a 2500 amp switch at 7 World Trade Center dated October 12, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #12 switch installation, 7 WTC, Oct 1998 · page 1NYC-WTC_000168658
Change Order #12 submitted by Ambassador Construction for voltmeter and ammeter installation on a 2500 amp switch at 7 World Trade Center dated October 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #11 door replacement, 7 WTC, Oct 1998 · page 1NYC-WTC_000168659
Change Order #11 submitted for replacing a hollow metal and glass door at 7 World Trade Center dated October 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #11 door replacement, 7 WTC, Oct 1998 · page 1NYC-WTC_000168660
Change Order #11 submitted by Ambassador Construction to replace a hollow metal and glass door at 7 World Trade Center dated October 1, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #10 receiver, 7 WTC, Sep 1998 · page 1NYC-WTC_000168661
Revised Change Order #10 submitted for the installation of a special class I package receiver at 7 World Trade Center dated September 16, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #9, 7 World Trade Center, Sep 1998 · page 1NYC-WTC_000168663
Revised change order for wood door jamb work at 7 World Trade Center dated September 14, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #9 for 7 World Trade Center Door Jamb · page 1NYC-WTC_000168664
Revised change order submitted to modify wood door jambs and replace specific doors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #8 Memo, 7 World Trade Center, Sept 1998 · page 1NYC-WTC_000168665
Memo submitting revised Change Order #8 for door modifications at 7 World Trade Center dated September 14, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #6 Submission, 7 World Trade Center, Sept 1998 · page 1NYC-WTC_000168667
Contractor submission of Change Order #006 for bullet-resistant door upgrades at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #6 Memo, 7 World Trade Center, Sept 1998 · page 1NYC-WTC_000168668
Memo submitting revised Change Order #6 for bullet-resistant door installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #4 Memo, 7 World Trade Center, Sept · page 1NYC-WTC_000168669
Memo submitting revised Change Order #004 for oil tank and electrical panel work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #7 Memo, 7 World Trade Center, Sept · page 1NYC-WTC_000168674
Memo submitting revised Credit Change Order #007 for fiber distribution system deletions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #4 memo, 7 World Trade Center, Sept · page 1NYC-WTC_000168684
Memo submitting revised Change Order #4 for oil tank and annunciator panel work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #3 memo, 7 World Trade Center, Aug · page 1NYC-WTC_000168689
Memo submitting revised Change Order #3 for surge protector sub-feeds at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #3 memo, 7 World Trade Center, Aug · page 2NYC-WTC_000168689
Memo submitting revised Change Order #3 for surge protector sub-feeds at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #3 Memo, 7 World Trade Center, Aug · page 1NYC-WTC_000168691
Memo submitting revised Change Order #003 for surge protector sub-feeds at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #3 Submission, 7 World Trade Center, Aug 1998 · page 1NYC-WTC_000168692
Contractor submission of Change Order #003 for plug mold outlet and A/V work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #3 Submission, 7 World Trade Center, Aug 1998 · page 2NYC-WTC_000168692
Contractor submission of Change Order #003 for plug mold outlet and A/V work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #3 Memo, 7 World Trade Center, Aug 1998 · page 1NYC-WTC_000168694
Memo submitting Change Order #3 for plug mold outlet installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #2 Submission, Ambassador Construction, July 1998 · page 1NYC-WTC_000168696
Letter from Ambassador Construction submitting Change Order #2 for cooling tower work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #1 Memo, 7 World Trade Center, August · page 1NYC-WTC_000168698
Memo submitting revised Change Order #1 for sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 Submission, Ambassador Construction, August 1998 · page 1NYC-WTC_000168699
Ambassador Construction submits Change Order #001 for sheetrock wall offset installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 Submission, 7 World Trade Center, July 1998 · page 1NYC-WTC_000168701
Letter submitting Change Order #1 for sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 Submission, Ambassador Construction, July 1998 · page 1NYC-WTC_000168702
Ambassador Construction submits Change Order #001 for sheetrock wall offset work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000168708 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Fire Safety Plan, 7 World Trade Center, April 1988 · page 30NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
Fire Department · Box FDNY
Fire Safety Plan, 7 World Trade Center, April 1988 · page 62NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
Fire Department · Box FDNY
Fire Safety Plan, 7 World Trade Center, April 1988 · page 211NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
Fire Department · Box FDNY
Fire Safety Plan, 7 World Trade Center, April 1988 · page 223NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
Fire Department · Box FDNY
Fire Safety Plan, 7 World Trade Center, April 1988 · page 251NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
Fire Department · Box FDNY
Fire Service Summary Report, n.d. · page 12NYC-WTC_000169205
Document summarizing fire service activities or inspections performed at the specified location.
Fire Department · Box FDNY
Letter regarding Port Authority consent for 7 WTC lease · page 1NYC-WTC_000169264
A letter dated April 6, 1998, enclosing a Port Authority consent letter for the City of New York's occupancy at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease agreement between City and 7 WTC Company · page 51NYC-WTC_000169268
A 99-page lease agreement dated March 25, 1998, for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
License agreement between City and 7 WTC Company · page 5NYC-WTC_000169388
A 30-page license agreement dated March 25, 1998, for the Mayor's Office of Emergency Management to occupy the 23rd floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
License agreement between City and 7 WTC Company · page 22NYC-WTC_000169388
A 30-page license agreement dated March 25, 1998, for the Mayor's Office of Emergency Management to occupy the 23rd floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
License agreement between City and 7 WTC Company · page 23NYC-WTC_000169388
A 30-page license agreement dated March 25, 1998, for the Mayor's Office of Emergency Management to occupy the 23rd floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease Agreement between City and 7 WTC Company, Mar 1998 · page 51NYC-WTC_000169609
Formal lease document establishing terms for the Mayor's Office of Emergency Management to occupy space at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
FOIL Request Letter for 7 WTC, April 1998 · page 1NYC-WTC_000169712
Formal letter from attorneys requesting documents regarding the City's lease at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease Agreement for 7 WTC, Mar 1998 · page 51NYC-WTC_000169723
Official lease agreement between the City of New York and 7 World Trade Company, L.P. for space at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter withdrawing SC Notice and modifying lease terms, Mar 1999 · page 2NYC-WTC_000169815
Letter from 7 World Trade Company withdrawing a Substantial Completion notice and agreeing to modify Article 6 of the lease with the City.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter withdrawing SC Notice and modifying lease terms, Mar 1999 · page 3NYC-WTC_000169815
Letter from 7 World Trade Company withdrawing a Substantial Completion notice and agreeing to modify Article 6 of the lease with the City.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000169819 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Draft lease for 7 World Trade Center, March 1998 · page 51NYC-WTC_000169837
Draft lease agreement between the City of New York and 7 World Trade Company for Mayor's Office space.
Citywide Administrative Services, Dept. of · Box 7DCAS
Draft lease for 7 World Trade Center, March 1998 · page 83NYC-WTC_000169936
Draft lease agreement between the City of New York and 7 World Trade Company for Mayor's Office space.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet transmitting revised lease, July 1997 · page 1NYC-WTC_000170551
Facsimile cover sheet from Carb Luria Cook & Kufeld transmitting a revised lease document to the City Law Department.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet re: 7 WTC lease documents, March 1998 · page 1NYC-WTC_000170720
Cover sheet for a fax transmission from a law firm to City officials regarding lease documentation for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax message re: 7 WTC construction meeting, Feb 24, 1998 · page 1NYC-WTC_000170817
Facsimile message dated February 24, 1998 distributing copies of a document regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction cost estimate, 7 WTC OEM, Feb 1998 · page 1NYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction cost estimate, 7 WTC OEM, Feb 1998 · page 5NYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000170830 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural and engineering services approval, OEM 7 WTC, Feb 1998 · page 1NYC-WTC_000170832
DCAS approval of architectural and mechanical engineering services proposal for Office of Emergency Management emergency systems and equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Design review comments, OEM 7 WTC, Feb 1998 · page 1NYC-WTC_000170834
DCAS transmits architectural comments on design drawings to the consultant for final plan revisions regarding the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Leasing proposal for Mayor's Office of Emergency Management, July 1997 · page 1NYC-WTC_000170882
A leasing proposal submitted by a property firm to the Mayor's Office of Emergency Management for office space at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Building data summary for 7 World Trade Center, 1987 · page 1NYC-WTC_000170955
Summary document containing building specifications and property details for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease proposal for Mayor's Office of Emergency Management, Jul 1997 · page 1NYC-WTC_000170996
Proposal document prepared for the Mayor's Office of Emergency Management regarding lease and broker agreements.
Citywide Administrative Services, Dept. of · Box 7DCAS
Building specifications for 7 World Trade Center · page 1NYC-WTC_000171019
Summary of construction details including height, area, and ownership status for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Law Department memo re: 7 World Trade license execution, December · page 1NYC-WTC_000171202
NYC Law Department memorandum noting need to obtain fully executed copy of letter agreement before delivering license to landlord.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000171237 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Meeting sign-in sheet for 7 WTC OEM project, Feb 2001 · page 1NYC-WTC_000171242
Sign-in record for a meeting at 7 World Trade Center involving DCAS and OEM representatives regarding the project.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000171247 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, OEM design proposal, June 1998 · page 1NYC-WTC_000171248
Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, OEM design proposal, June 1998 · page 2NYC-WTC_000171248
Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, OEM design proposal, June 1998 · page 3NYC-WTC_000171248
Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Field observation report fax cover, 7 WTC OEM, Aug 1999 · page 1NYC-WTC_000171251
Fax cover sheet dated August 4, 1999, transmitting a field observation report regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval letter, Final Plans review, 7 World Trade Center, May · page 1NYC-WTC_000171255
Certified mail from DCAS confirming approval of the second issue of Final Plans for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent payment request letter, July 1998 · page 1NYC-WTC_000171257
Certified letter dated July 8, 1998, from the landlord requesting a $7,000,000 payment for construction rent at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent invoice, March 1999 · page 1NYC-WTC_000171262
Invoice from 7 World Trade Company, L.P. dated March 9, 1999 requesting $2,500,000 for construction rent at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification letter, 7 World Trade Company L.P., March 1999 · page 2NYC-WTC_000171263
Letter from 7 World Trade Company, L.P. modifying the lease agreement with the City of New York to withdraw a prior notice regarding space at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent invoice, February 2000 · page 1NYC-WTC_000171272
Invoice from 7 World Trade Company dated February 4, 2000 requesting $1,088,934 for construction rent at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cover letter for construction rent invoice, June 2001 · page 1NYC-WTC_000171276
Letter from 7 World Trade Company dated June 14, 2001 requesting payment of $504,232 for construction rent at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent invoice, June 2001 · page 1NYC-WTC_000171277
Invoice from 7 World Trade Company dated June 14, 2001 requesting $504,232 for construction rent at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order review memo, 7 World Trade Center, Dec 2000 · page 1NYC-WTC_000171278
Memo reviewing change orders for lock-out switches and fire alarm systems at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal for tank room switch installation, November 2000 · page 1NYC-WTC_000171280
Contractor proposal from Ambassador Construction dated November 16, 2000 to install a lock-out switch for $1,221 at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal for tank room switch installation, Nov 2000 · page 1NYC-WTC_000171282
Contractor proposal for $1,221 to install a lock-out switch for the Inergen system in the tank room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo approving change order #113, June 2000 · page 1NYC-WTC_000171291
City memo approving $3,253 for installing a self-closing hatch mechanism in the tank room fire system.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order approval memo, 7 World Trade Center, Feb 2000 · page 1NYC-WTC_000171297
Memo approving costs for heat tracing, electrical work, and sprinkler head installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #110 proposal for sprinkler and astragal, Jan 2000 · page 1NYC-WTC_000171299
Contractor submission of change order #110 to install a sprinkler head and door astragal at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #088 for fuel oil piping, 7 World Trade · page 1NYC-WTC_000171303
Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #44R proposal for fuel oil lines, March 1999 · page 1NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo approving change orders #98 and #103, April 1999 · page 1NYC-WTC_000171322
City memo approving costs for electrical lighting changes and press feed camera installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #98 submission for electrical work, 7 WTC · page 1NYC-WTC_000171328
Contractor submission of Change Order #98 for converting press room lights to hard-wired switches at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #103 submission for audiovisual work, 7 WTC · page 1NYC-WTC_000171331
Contractor submission of Change Order #103 for audiovisual equipment and camera installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of Change Orders 93, 97, 99 & 100 for · page 1NYC-WTC_000171334
Letter from DCAS approving costs for four change orders related to electrical and audiovisual work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #93 for 7 World Trade Center electrical work, · page 1NYC-WTC_000171339
Cover letter submitting Change Order #93 for wiring motor and switch controllers at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #93 for 7 World Trade Center electrical work, · page 1NYC-WTC_000171340
Contractor submission for Change Order #93 to wire motor and switch controllers at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #97 for 7 World Trade Center oil line · page 1NYC-WTC_000171341
Cover letter submitting Change Order #97 for enclosing oil lines with rated sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #97 proposal for 7 World Trade Center oil · page 1NYC-WTC_000171342
Proposal to enclose fuel oil lines with sheetrock instead of vermiculite at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order 099, electrical circuits, 7 WTC, Nov 1999 · page 1NYC-WTC_000171344
A change order for installation of electrical circuits in executive areas at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #099 proposal for 7 World Trade Center circuits, · page 1NYC-WTC_000171345
Request to furnish and install separate electrical circuits in executive and hallway areas of the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order 100, DOT camera engineering, 7 WTC, Nov 1999 · page 1NYC-WTC_000171346
A change order for engineering work related to DOT camera installation at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #100 proposal for DOT camera engineering work, Nov · page 1NYC-WTC_000171347
Proposal for engineering services related to Department of Transportation camera installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCA letter negotiating change orders #35-71 at 7 WTC, Nov · page 1NYC-WTC_000171352
Letter from DCA to a property firm confirming negotiated costs for Change Orders #35 through #71 at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #35 submission for fiber optic work, Nov 1998 · page 1NYC-WTC_000171355
Letter from a contractor submitting Change Order #35 for $5,796 to terminate fiber optic cables at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo specifying LAN backbone runs for 7 World Trade Center, · page 1NYC-WTC_000171359
Technical specifications for installing fiber optic and UTP cable backbones between LAN rooms at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order 052, electrical outlet and circuit work, 7 WTC · page 1NYC-WTC_000171363
A change order for electrical outlet installation and circuit extension at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #053 for computer equipment installation, Jan 1999 · page 1NYC-WTC_000171376
Contractor submission for Change Order #053 to mount computer equipment and patch cables at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #054 for OEM project at 7 WTC, Jan · page 1NYC-WTC_000171383
Change order #054 from Ambassador Construction dated January 18, 1999 for computer equipment relocation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #055, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000171387
Contractor submission for change order covering conduit repairs and new wiring installation in loading dock and lobby areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #057, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000171395
Contractor submission for change order covering security system installation including magnetic locks and exit buttons.
Citywide Administrative Services, Dept. of · Box 7DCAS
Scope of Work Request, 7 World Trade Center, 1998 · page 1NYC-WTC_000171397
Documentation of additional scope of work requested by the Mayor's Office of Emergency Management for the site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #058, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000171400
Contractor submission for change order covering computer relocation and LAN room patching work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #60 for Hurricane Wall Repair, 7 WTC, Jan · page 1NYC-WTC_000171404
Memorandum submitting change order #60 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #61, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000171408
Contractor submission for change order covering wiring installation for auxiliary contacts within existing relays.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #61, 7 World Trade Center, Jan 1999 · page 2NYC-WTC_000171408
Contractor submission for change order covering wiring installation for auxiliary contacts within existing relays.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #61 for auxiliary wire installation, 7 WTC, Jan · page 1NYC-WTC_000171410
Ambassador Construction submits Change Order #61 to run wires from auxiliary contacts to magnetic locks at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding OEM project completion status, 7 WTC, April 2001 · page 1NYC-WTC_000171416
Memo confirming the Mayor's Office of Emergency Management project at 7 World Trade Center has been deemed complete as of April 30, 2001.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #002 submission for hatch door switch, 7 WTC, · page 1NYC-WTC_000171419
Ambassador Construction submits Change Order #002 to furnish and install a disconnect switch for a hatch door release at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador's Estimate #002 for disconnect switch installation, Mar 2001 · page 1NYC-WTC_000171420
Invoice for furnishing and installing a disconnect switch for a hatch door release at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for construction rent payments, 7 WTC, June 2001 · page 1NYC-WTC_000171421
Letter enclosing an invoice dated June 14, 2001 for $504,232 in construction rent payments for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice submission for construction rent, 7 WTC, June 2001 · page 1NYC-WTC_000171422
Letter enclosing an invoice dated June 14, 2001 for $504,232 in construction rent payments for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Permit to Occupy or Use for 7 WTC OEM project, · page 1NYC-WTC_000171423
Official permit document authorizing occupancy of the 1st, 7th, and 23rd floors and roof at 7 World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Handwritten cost approval notes, 7 WTC · page 1NYC-WTC_000171434
Document containing handwritten calculations and notes regarding total approved costs before the sixth payment for a construction project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for roofing change order #62, 7 WTC, Jan 1999 · page 1NYC-WTC_000171435
Invoice from Ambassador Construction for $9,679 to complete roofing details at a new curb at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #63 submission, 7 WTC, Feb 1999 · page 1NYC-WTC_000171442
Letter submitting Change Order #63 for $1,912 to install a pipe sleeve and cable for FD-MTD mobile terminal dispatch at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #63 submission, 7 WTC, Feb 1999 · page 2NYC-WTC_000171442
Letter submitting Change Order #63 for $1,912 to install a pipe sleeve and cable for FD-MTD mobile terminal dispatch at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #64 submission, 7 WTC, Feb 1999 · page 1NYC-WTC_000171446
Letter dated February 1, 1999, submitting Change Order #64 for work at the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #64 submission, 7 WTC, Feb 1999 · page 2NYC-WTC_000171446
Letter dated February 1, 1999, submitting Change Order #64 for work at the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #64 submission, 7 WTC, Jan 1999 · page 1NYC-WTC_000171448
Ambassador Construction letter dated January 29, 1999, submitting Change Order #64 for $7,114 to patch cables and install wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #66 submission, 7 WTC, Feb 1999 · page 1NYC-WTC_000171453
Letter dated February 1, 1999, submitting Change Order #66 for furnishing and installing floor boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #66 submission, 7 WTC, Feb 1999 · page 2NYC-WTC_000171453
Letter dated February 1, 1999, submitting Change Order #66 for furnishing and installing floor boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #66 submission, 7 WTC, Feb 1999 · page 1NYC-WTC_000171455
Ambassador Construction letter dated February 1, 1999, submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #067 submission, 7 WTC, Feb 1999 · page 1NYC-WTC_000171464
Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project status memo for 7 World Trade Center, April 2001 · page 1NYC-WTC_000171474
Official memo from Citywide Administrative Services confirming project status for 7 World Trade Center properties as of April 30, 2001.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo regarding OEM change order approval, April 2001 · page 1NYC-WTC_000171475
Department of Citywide Administrative Services memo approving a $762.00 change order for a hatch door switch at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order proposal for OEM hatch door switch, March 2001 · page 1NYC-WTC_000171477
Proposal from Ambassador Construction to install a disconnect switch for a hatch door release at the Mayor's Office of Emergency Management for $762.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order proposal for OEM hatch door switch, March 2001 · page 1NYC-WTC_000171478
Proposal from Ambassador Construction to install a disconnect switch for a hatch door release at the Mayor's Office of Emergency Management for $762.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo regarding OEM change orders #114 and #115, Dec · page 1NYC-WTC_000171480
Department of Citywide Administrative Services memo approving two change orders totaling $40,485 for lock-out switches and an Inergen system at the Mayor's Office of Emergency…
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal for switch installation in tank room, Nov 2000 · page 1NYC-WTC_000171482
Cost proposal submitted by Ambassador Construction Company to install a new lock-out switch for the Inergen system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #001 for OEM Inergen reserve system, Dec 2000 · page 1NYC-WTC_000171486
Submission of change order #001 by Ambassador Construction to install a connected reserve Inergen supply system at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #001 for OEM Inergen reserve system, Dec 2000 · page 1NYC-WTC_000171488
Submission of change order #001 by Ambassador Construction to install a connected reserve Inergen supply system at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order directive for OEM Inergen supply, July 1998 · page 1NYC-WTC_000171489
Contractor directive to install connected reserve Inergen supply including cylinders and valves as part of Change Order number 32.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo regarding OEM change order #113, Nov 2000 · page 1NYC-WTC_000171493
Department of Citywide Administrative Services memo approving a $3,253.00 change order for a self-closing hatch in the tank room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #113 for Fire Rated Hatch Replacement, June 2000 · page 1NYC-WTC_000171495
Contractor submission of Change Order #113 to replace a fire-rated hatch with a self-closing thermal link system at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fire-rated hatch installation work order, 7 WTC, Jun 2000 · page 1NYC-WTC_000171500
Letter transmitting change order #113 for $3,253 to remove and install new fire-rated hatch at 7 World Trade Center tank room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #113 for 7 WTC hatch work, June 2000 · page 1NYC-WTC_000171501
Formal change order document for $3,253 to replace a fire-rated hatch at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of Change Orders #111 & #112 for Generator Room · page 1NYC-WTC_000171502
Department approval of change orders totaling $19,732 for electric space heaters and valve replacement in the generator room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memorandum on Generator Room Insulation Recommendations, January 2000 · page 1NYC-WTC_000171513
Architectural memorandum providing recommendations for insulating the generator room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #112 submittal, 7 World Trade Center, February 2000 · page 1NYC-WTC_000171516
Contractor submittal of change order #112 for $2,266.00 covering anti-siphon valve replacement and check valve installation on fuel oil pump system at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cover Letter for Change Order #112, 7 WTC, Feb 2000 · page 1NYC-WTC_000171517
Cover letter submitting Change Order #112 for the replacement of an anti-siphon valve with a check valve at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo approving construction rent payment, Feb 2000 · page 1NYC-WTC_000171524
Memo authorizing payment of $14 million in construction rent for the Mayor's Office at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice cover letter for MOEM rent, Feb 4 2000 · page 1NYC-WTC_000171525
Cover letter submitting an invoice for $1 million in construction rent payments for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of change orders for WTC HVAC and electrical work, · page 1NYC-WTC_000171526
Memo approving $17,198.00 in change orders for heat tracing, electrical work, and sprinkler installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment status memo for WTC construction invoice, Feb 2000 · page 1NYC-WTC_000171536
Memo detailing remaining balance of $380,007.00 payable for Mayor's Office of Emergency Management construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Application and certificate for payment, Jan 2000 · page 1NYC-WTC_000171545
Contractor application for payment totaling over $11 million for general construction work on the Mayor's Office floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of change orders for WTC HVAC and electrical work, · page 1NYC-WTC_000171546
Memo approving $17,198.00 in change orders for heat tracing, electrical work, and sprinkler installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, 7 World Trade Center project · page 1NYC-WTC_000171550
Cover sheet for a fax transmission related to the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting change order #096, Nov 1999 · page 1NYC-WTC_000171551
Letter submitting Change Order #096 for $10,225 to install heat tracing on the 7th floor of the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #096 submission, Ambassador Construction, Sep 1999 · page 1NYC-WTC_000171552
Contractor letter submitting revised Change Order #096 for $10,225 to install heat tracing on the 7th floor generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, Ambassador Construction, Sep 2 1999 · page 1NYC-WTC_000171555
Facsimile transmission cover sheet from Ambassador Construction Co. dated September 2, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #110 submission, Ambassador Construction, Jan 2000 · page 1NYC-WTC_000171556
Contractor submission for change order #110 to install astragel and a sprinkler head at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Generator room insulation recommendations memo, Jan 2000 · page 1NYC-WTC_000171562
Memorandum addressed to the Mayor's Office of Emergency Management recommending insulation for the World Trade Center generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #109, 7 WTC Mayor's Office of Emergency Management, · page 1NYC-WTC_000171563
Invoice for change order #109 ($4,482.00) from property owner for electrical and security work at 7 World Trade Center's Mayor's Office of Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #109 cover letter, Jan 7 2000 · page 1NYC-WTC_000171564
Ambassador Construction cover letter dated January 7, 2000 submitting change order #109 for door lock and electrical work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #110, 7 WTC Mayor's Office of Emergency Management, · page 1NYC-WTC_000171567
Invoice for change order #110 ($2,461.00) for work at 7 World Trade Center's Mayor's Office of Emergency Management space, per Port Authority authorization.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval memo, change order #108, Jan 2000 · page 1NYC-WTC_000171568
Department of Citywide Administrative Services letter dated January 3, 2000 approving $4,258.00 for change order #108 regarding video cable connections.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval memo, change order #108, video cables, Jan 2000 · page 1NYC-WTC_000171572
Department of Citywide Administrative Services approval letter for change order #108 regarding video cable connections at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #108 cover letter, Dec 17 1999 · page 1NYC-WTC_000171573
Ambassador Construction cover letter dated December 17, 1999 submitting change order #108 for video cable connections at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval memo, COs 102/106/107, Jan 1999 · page 1NYC-WTC_000171576
Department of Citywide Administrative Services letter dated January 15, 1999 approving costs for change orders 102, 106, and 107 at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS approval memo, change orders 102/106/107, Jan 1999 · page 1NYC-WTC_000171580
Department of Citywide Administrative Services approval letter for multiple change orders related to data and electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #102 cover letter, Oct 29 1999 · page 1NYC-WTC_000171585
Ambassador Construction cover letter dated October 29, 1999 submitting change order #102 for data box and outlet installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #106 for PESA panel installation, Dec 1999 · page 1NYC-WTC_000171586
Invoice dated December 1999 for furnishing and installing a PESA front panel control at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #107 for smoke room painting, Dec 1999 · page 1NYC-WTC_000171587
Invoice dated December 1999 for painting the smoke room at 7 World Trade Center per OEM request.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #106 cover letter, Dec 7 1999 · page 1NYC-WTC_000171588
Ambassador Construction cover letter dated December 7, 1999 submitting change order #106 for PESA front panel control installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding 7 World Trade Center construction, Sept 1999 · page 1NYC-WTC_000171602
Correspondence from DCAS Division of Real Estate Services regarding construction matters at the site.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS payment request form, Contract #98F2654 · page 1NYC-WTC_000171605
Department of Citywide Administrative Services form used to request payment for construction services.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #105 for 7 WTC Audiovisual Work, Nov 1999 · page 1NYC-WTC_000171607
Ambassador Construction submits Change Order #105 for audiovisual expansion work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval letter for Change Order #104, Nov 1999 · page 1NYC-WTC_000171623
Letter from DCAS approving a negotiated cost of $50,000 for conduit and fiber optic installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of Change Order #104 for conduit and fiber optic · page 1NYC-WTC_000171625
DCAS letter approving a negotiated cost of $50,000 for the installation of conduit and fiber optic cables for the camera system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Conduit installation survey details, Oct 1999 · page 1NYC-WTC_000171630
Survey report outlining plans to install new conduits for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #69 submission for hardware and keys, Feb 1999 · page 1NYC-WTC_000171636
Submission of Change Order #69 for additional keys and roof chain installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #71 submission for pump fields, Feb 1999 · page 1NYC-WTC_000171638
Submission of Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #71 submission for pump wiring, Feb 1999 · page 1NYC-WTC_000171639
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #70 submission for plaques, Feb 1999 · page 1NYC-WTC_000171642
Submission of Change Order #70 to furnish and install five cast magnum plaques at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #70 submission for plaques, Feb 1999 · page 1NYC-WTC_000171643
Ambassador Construction submits Change Order #70 to install three 28-inch and two 21-inch cast magnum plaques at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter on negotiated change orders #73-95, Nov 1999 · page 1NYC-WTC_000171646
Letter from DCAS confirming review and cost negotiation for ten change orders submitted by a contractor for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #74 submission for shade bands, Mar 1999 · page 1NYC-WTC_000171651
Submission of Change Order #74 to furnish and install blackout shade bands in the Mayor's conference room and press room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #074 submission for shade bands, Mar 1999 · page 1NYC-WTC_000171652
Ambassador Construction submits Change Order #074 to install blackout shade bands in the Mayor's conference room and another designated area.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #076 for plumbing work, 7 WTC, Mar 1999 · page 1NYC-WTC_000171653
Ambassador Construction submits Change Order #076 to relocate a cold water line at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #78 for speaker relocation, 7 WTC, Apr 1999 · page 1NYC-WTC_000171656
Letter submitting Change Order #78 to remove and reinstall speakers and fire devices in the press room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #078 for speaker work, 7 WTC, Apr 1999 · page 1NYC-WTC_000171658
Ambassador Construction submits Change Order #078 to remove and reinstall speakers and fire devices at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #079 for blast door plates, 7 WTC, Apr · page 1NYC-WTC_000171670
Ambassador Construction submits Change Order #079 to install reinforcing plates for blast-proof doors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #084 for 7 World Trade Center, Apr · page 1NYC-WTC_000171678
Ambassador Construction submits credit change order #084 for TV monitor work at 7 World Trade Center dated April 27, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding Change Order #92, 7 World Trade Center, Aug · page 1NYC-WTC_000171683
Memo from DCAS submitting change order #92 for installing window film in the press room at 7 World Trade Center dated August 12, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #092 for 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000171684
Ambassador Construction submits change order #092 for installing window film in the press room at 7 World Trade Center dated August 11, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #095 for 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000171685
Ambassador Construction submits change order #095 to install three new receptacles in the Mayor's conference room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #091 for 7 World Trade Center Pump Installation, · page 1NYC-WTC_000171687
Ambassador Construction submits change order #091 for pump and drain installation to remedy leakage on the seventh floor dated July 22, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent payment invoice, 7 World Trade Center, August 1999 · page 1NYC-WTC_000171693
Invoice from 7 World Trade Company, L.P. for construction rent payment of $1,884,322.00 due August 30, 1999 under lease agreement.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction rent payment invoice, 7 World Trade Center, August 1999 · page 1NYC-WTC_000171698
Invoice from 7 World Trade Company, L.P. for construction rent payment of $1,884,322.00 due August 30, 1999 under lease agreement.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease invoice, 7 World Trade Center, August 1999 · page 1NYC-WTC_000171703
Invoice from 7 World Trade Company to DCAS for $1.8M due under the lease for Mayor's Office of Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease invoice, 7 World Trade Center, August 1999 · page 1NYC-WTC_000171706
Invoice from 7 World Trade Company to DCAS for $1.8M due under the lease for Mayor's Office of Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000171741 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Cover letter for Change Order #44, 7 WTC, December 1998 · page 1NYC-WTC_000171765
Transmittal letter submitting Change Order #44 for fuel oil work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #44 submission, Ambassador Construction, Dec 1998 · page 1NYC-WTC_000171766
Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM revisions request for fuel oil piping, 7 WTC, Mar · page 1NYC-WTC_000171773
Memo submitting proposed fuel oil piping routes and noting concrete encasement requirements for Port Authority approval.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #75 approval, DCAS, Mar 1999 · page 1NYC-WTC_000171777
DCAS memo approving $4,874 for UPS system supply and installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #75 submission, Ambassador Construction, Mar 1999 · page 1NYC-WTC_000171779
Cover letter submitting Change Order #75 for $4,874 to install UPS units at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, DCAS Real Estate Services, Mar 1999 · page 1NYC-WTC_000171781
Fax cover sheet from DCAS Real Estate Services transmitting documents regarding space design for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for lease payment, 7 World Trade Company, Mar 1999 · page 1NYC-WTC_000171787
Invoice from 7 World Trade Company, L.P. for $2,500,000.00 lease payment to City pursuant to Agreement of Lease dated March 25, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification notice, 7 World Trade Company, Mar 1999 · page 2NYC-WTC_000171788
Letter withdrawing a Port Authority sign-off requirement and modifying Article 6 of the lease for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for lease payment, 7 World Trade Company, Mar 1999 · page 1NYC-WTC_000171790
Invoice from 7 World Trade Company, L.P. for $2,500,000.00 lease payment to City pursuant to Agreement of Lease dated March 25, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for lease payment, 7 World Trade Company, Mar 1999 · page 1NYC-WTC_000171792
Invoice from 7 World Trade Company, L.P. for $2,500,000.00 lease payment to City pursuant to Agreement of Lease dated March 25, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification notice, 7 World Trade Company, Mar 1999 · page 2NYC-WTC_000171793
Letter withdrawing a Port Authority sign-off requirement and modifying Article 6 of the lease for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter re: Change Order #65, 7 WTC, Feb 1999 · page 1NYC-WTC_000171795
Letter from DCAS approving change order #65 for X-ray equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #65 approval, 7 World Trade Center, Feb 1999 · page 1NYC-WTC_000171797
DCAS memo approving $26,336 for X-ray equipment installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #65 approval, 7 World Trade Center, Feb 1999 · page 2NYC-WTC_000171797
DCAS memo approving $26,336 for X-ray equipment installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #65 submission, 7 WTC, Jan 1999 · page 1NYC-WTC_000171799
Letter from Ambassador Construction submitting change order #65 for X-ray and video equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter re: Change orders for OEM, Jan 1999 · page 1NYC-WTC_000171802
Letter from DCAS approving negotiated costs for multiple change orders submitted by a contractor for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #23 submission, 7 WTC, Nov 1998 · page 1NYC-WTC_000171804
Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26R submission, 7 WTC, Dec 1998 · page 1NYC-WTC_000171808
Letter from DCAS submitting revised change order #26R for work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26R submission, 7 WTC, Dec 1998 · page 1NYC-WTC_000171810
Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26 submission, 7 WTC, Nov 1998 · page 1NYC-WTC_000171821
Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #34 for metal cap flashing installation, Nov 1998 · page 1NYC-WTC_000171834
Submission of change order #34 to install a new metal cap flashing with drip return at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38 submission for construction work, Dec 1998 · page 1NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38 submission for construction work, Dec 1998 · page 2NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38 submission for construction work, Dec 1998 · page 3NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #38 submission for construction work, Dec 1998 · page 4NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #40 submission for construction work, Dec 1998 · page 1NYC-WTC_000171847
Letter submitting Change Order #40 for $26,427.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #040 scope for rebar welding and concrete removal · page 1NYC-WTC_000171848
Letter detailing Change Order #040 to weld new rebar to existing rebar and chop away concrete at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #41 submission for construction work, Dec 1998 · page 1NYC-WTC_000171854
Letter submitting Change Order #41 for $16,807.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #41 Submission for Antenna Support, Dec 1998 · page 1NYC-WTC_000171855
Letter detailing Change Order #41 for revised antenna support details installed into beam webs at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #43 submission for cable installation, Dec 1998 · page 1NYC-WTC_000171859
Letter submitting Change Order #43 for $11,759.00 for RG-6U plenum cable installation at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #043, RG-6U cable, 7 World Trade, Dec 1998 · page 1NYC-WTC_000171860
Letter detailing Change Order #043 for RG-6U plenum cable supply and installation at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #048 for access door installation, Jan 1999 · page 1NYC-WTC_000171862
Submission of change order #048 to furnish and install a new 24x24 access door and hardware at room 23-51.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #50 for lighting system modules, Jan 1999 · page 1NYC-WTC_000171866
Ambassador Construction submits Change Order #50 to install Crestron modules and resolve dimming system incompatibilities.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #51 for shelving adjustments, Jan 1999 · page 1NYC-WTC_000171870
Ambassador Construction submits Change Order #51 detailing height adjustments and unit additions to adjustable shelving units.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #47 for generator flexes, Jan 1999 · page 1NYC-WTC_000171881
Letter submitting Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #47 for generator flexes, Dec 1998 · page 1NYC-WTC_000171882
Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting revised Change Order #39, Dec 1998 · page 1NYC-WTC_000171887
Letter submitting revised Change Order #39 for the furnishing and installation of USM furniture and plates at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #039, Dec 1998 · page 1NYC-WTC_000171889
Ambassador Construction submits Change Order #039 for USM furniture and plates at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #45, Dec 1998 · page 1NYC-WTC_000171891
Letter submitting Change Order #45 for furnishing and installing unspecified items at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #45 for press panel, Dec 1998 · page 1NYC-WTC_000171892
Ambassador Construction submits Change Order #45 for a custom press panel and cable termination at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization #5576CH, Nov 1998 · page 1NYC-WTC_000171895
DCAS authorizes scope revisions for the Mayor's Office of Emergency Management at 7 World Trade Center on November 6, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #016R submission, Ambassador Construction, Nov 1998 · page 1NYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #018 submission, Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171903
Ambassador Construction submits Change Order #018 for electrical work at the Mayor's Office of Emergency Management on October 15, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for OEM change order response, Oct 1998 · page 1NYC-WTC_000171908
Facsimile transmission cover sheet from Ambassador Construction dated October 22, 1998, regarding OEM change orders.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #022 submission, Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171910
Ambassador Construction submits Change Order #022 for fiber optic installation at the Mayor's Office of Emergency Management on October 30, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #024R submission, Nov 1998 · page 1NYC-WTC_000171914
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000171916 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #025 for roof antenna support, Nov 1998 · page 1NYC-WTC_000171920
Quotation for structural steel supports and fireproofing required to mount microwave dishes on the World Trade Center roof in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #028 for electrical work, 7 World Trade Center, · page 1NYC-WTC_000171930
Contractor submission of change order #028 for conduit modification and wire installation at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #029 for duplex outlets, 7 World Trade Center, · page 1NYC-WTC_000171932
Contractor submission of change order #029 to install two duplex outlets and a switch in the training room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #030 for concrete pad and drilling, Nov 1998 · page 1NYC-WTC_000171934
Ambassador Construction change order #030 detailing costs for a concrete pad, drilling, and oil leak detection basin.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #031 for security wire installation, Nov 1998 · page 1NYC-WTC_000171939
Ambassador Construction change order #031 for installing security wire in conduits at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #033 for conduit and grounding work, Nov 1998 · page 1NYC-WTC_000171955
Ambassador Construction change order #033 detailing costs for conduit extension, sleeves, outlets, and grounding.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for OEM, Nov 1998 · page 1NYC-WTC_000171966
DCAS memo approving multiple change orders for work at the Mayor's Office of Emergency Management in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #012 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171968
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #013 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171972
Change order submission by Ambassador Construction for framing work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #019 for OEM, 7 World Trade Center, Oct · page 1NYC-WTC_000171973
Submission of change order #019 by Ambassador Construction Co. to replace acoustic panels at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #020 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171975
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #021, 7 World Trade Center, October 1998 · page 1NYC-WTC_000171977
Construction change order for water tank and switch gear work on the 7th floor of 7 World Trade Center, totaling $20,342.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for OEM, Nov 1998 · page 1NYC-WTC_000171978
DCAS memo approving multiple change orders for work at the Mayor's Office of Emergency Management in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #011 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171980
Change order submission by Ambassador Construction for door modifications at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #014 for OEM, 7 World Trade Center, · page 1NYC-WTC_000171981
Submission of credit change order #014 by Ambassador Construction Co. to remove costs for emergency generator field testing.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #015 for OEM, 7 World Trade Center, Oct · page 1NYC-WTC_000171983
Submission of change order #015 by Ambassador Construction Co. to install sleeves and perform firestopping at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000171987
Authorization form issued to proceed with revised scope of services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment request #2 for OEM construction, 7 World Trade Center, · page 1NYC-WTC_000171989
Certified letter requesting payment of $3,500,000 for construction work at the Mayor's Office of Emergency Management floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project 96-1346 construction cost estimates memorandum, July 1998 · page 1NYC-WTC_000171990
DCAS memorandum regarding construction cost estimates for Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter revising approved alteration costs, 7 World Trade Center, Aug · page 1NYC-WTC_000171993
DCAS correspondence revises the approved cost for specific alteration items at the Mayor's Office of Emergency Management floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 approval for sheetrock wall offset, 7 World · page 1NYC-WTC_000171995
DCAS letter approves a revised cost of $7,000 for Change Order #1 to install a sheetrock wall offset on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of Change Orders #3 and #4, 7 World Trade · page 1NYC-WTC_000171996
DCAS correspondence approves costs for Change Orders #3 and #4 regarding electrical changes and bulletin board installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of change orders #6, 8, 9 & 10, 7 · page 1NYC-WTC_000172000
DCAS correspondence confirms approval of multiple change orders for door revisions and associated costs at the project site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Transmittal of revised Change Order #6, 7 World Trade Center, · page 1NYC-WTC_000172002
Letter transmits a revised Change Order #6 for $406 to furnish a bullet-resistant door at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #006 for bullet resistant door, 7 World Trade · page 1NYC-WTC_000172003
Ambassador Construction submits change order to furnish a Level 3 bullet-resistant door at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #9 for wood door modifications, 7 World · page 1NYC-WTC_000172006
Letter submits revised change order for mahogany door and jamb replacements at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #009 for wood door upgrades, 7 World Trade · page 1NYC-WTC_000172007
Ambassador Construction submits change order to upgrade painted doors to mahogany and modify specific door numbers.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #10 for package receiver, 7 World Trade · page 1NYC-WTC_000172008
Letter submits revised change order to furnish and install a special Class I package receiver at the project site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000172010
Authorization form issued to proceed with revised scope of services and expense reporting for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for OEM project conversation, Jan 1998 · page 1NYC-WTC_000172017
Cover sheet for a fax transmission dated January 30, 1998 regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #3 submission, 7 WTC, Aug 1998 · page 1NYC-WTC_000172026
Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #004 systems installation, 7 WTC, Aug 1998 · page 1NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bulletin #1 cost proposal for hurricane wall work, Sept 1998 · page 1NYC-WTC_000172039
Cost comparison sheet detailing labor and material estimates for hurricane wall modifications at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 WTC, Sep 1998 · page 1NYC-WTC_000172050
Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #4 submission, Sept 1 1998 · page 1NYC-WTC_000172098
Letter submitting revised change order #4 for concrete work and panel installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #4 submission, Sept 1 1998 · page 2NYC-WTC_000172103
Letter submitting revised change order #4 for $180,087 covering concrete work and graphic annunciator panel installation at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172107 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Memo approving revised change order #1, Aug 11 1998 · page 1NYC-WTC_000172109
Letter approving a revised change order for sheetrock wall offset work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #1 approval letter, 7 WTC, July 31, 1998 · page 1NYC-WTC_000172110
Letter from [name] Properties approving change order #1 for sheetrock wall offsets at $10,817.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #1 submission, 7 World Trade Center, July 1998 · page 1NYC-WTC_000172111
Contractor submits change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter regarding cost approval and reconsideration, July 8, 1998 · page 1NYC-WTC_000172113
DCAS letter referencing a $12.8 million cost approval and requesting reconsideration of item #8.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for hurricane wall construction, June 11, 1998 · page 1NYC-WTC_000172115
Contractor submits a budget estimate of $473,870 for constructing the hurricane wall at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal transmittal letter, 7 World Trade Center MOEM, June 1998 · page 1NYC-WTC_000172117
Transmittal of construction proposals for hurricane wall and visual systems work at 7 World Trade Center Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS response to clarifications, 7 WTC, June 2, 1998 · page 1NYC-WTC_000172121
DCAS letter responding to contractor's clarifications regarding the Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal submission, 7 World Trade Center, June 10, 1998 · page 1NYC-WTC_000172123
Contractor submits a revised proposal totaling $11.6 million for demolition and construction work at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal submission, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172126
Contractor submits a revised proposal totaling $11.6 million for demolition and construction work at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Hand-delivered letter from architects, June 30, 1998 · page 1NYC-WTC_000172130
Hand-delivered letter from architects proposing additional design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 2NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 3NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Generator cost approval letter, April 17, 1998 · page 1NYC-WTC_000172134
DCAS approves $717,890 in costs for purchasing generators for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Generator cost approval, 7 World Trade Center, April 1998 · page 1NYC-WTC_000172135
DCAS approves $717,890 in costs for purchasing generators for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Document page from OEM 7 World Trade Center folder, date · page 1NYC-WTC_000172145
Single page document fragment from the OEM 7 World Trade Center file containing minimal visible text or data.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #077 memo for 7 World Trade Center modifications, · page 1NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #081 cover letter for 7 World Trade Center, · page 1NYC-WTC_000172149
Cover letter from Ambassador Construction submitting change order #081 for radio room wall paneling work at the site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #101 cover letter for fire extinguisher installation, November · page 1NYC-WTC_000172161
Cover letter submitting change order #101 for the provision and installation of a wall-mounted Halotron 1 fire extinguisher.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #101 memo for fire extinguisher installation, October 1999 · page 1NYC-WTC_000172162
Memo submitting change order #101 for the provision and installation of a wall-mounted Halotron 1 fire extinguisher.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: overhead cabling reorganization at 7 WTC, January 2000 · page 1NYC-WTC_000172172
Letter from a contractor detailing work for the installation of emergency generators and water tank requiring cabling relocation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re OEM cabling charges, Jan 2000 · page 1NYC-WTC_000172191
Memo regarding additional charges for cabling reorganization at 7 World Trade Center and related rent statement concerns.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #80 for floor granite removal, Apr 1999 · page 1NYC-WTC_000172193
Contractor submission of revised change order for removing floor granite at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #89 for OEM wiring work, Jun 1999 · page 1NYC-WTC_000172194
Contractor submission of change order for power and control wiring at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #89 for OEM wiring work, Jun 1999 · page 1NYC-WTC_000172195
Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization form for OEM audio-visual work, Mar 1999 · page 1NYC-WTC_000172197
Form authorizing revised scope of services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #019 for projector replacement, Oct 1998 · page 1NYC-WTC_000172199
Contractor submission of change order for replacing projectors at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #027, Nov 1998 · page 1NYC-WTC_000172201
Letter from Ambassador Construction submitting credit change order #027 for painting work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #36 cover letter, Nov 1998 · page 1NYC-WTC_000172210
Cover letter submitting Change Order #36 for generator room waterproofing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #36 for generator room waterproofing, Nov 1998 · page 1NYC-WTC_000172211
Submission of change order to waterproof the generator room on the 7th floor using Dex-o-Tex flooring.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #37 submission, Nov 1998 · page 1NYC-WTC_000172213
Letter from Ambassador Construction submitting Change Order #37 for stainless steel cladding at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo from [name] Inc., Jan 4 1998 · page 1NYC-WTC_000172214
Cover sheet for a memo dated January 4, 1998, sent from [name], Inc. at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #46 cover letter, Jan 1999 · page 1NYC-WTC_000172215
Cover letter submitting Change Order #46 for power supply work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #46, 7 World Trade Center, Jan 1999 · page 1NYC-WTC_000172216
Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #42 for WTC lighting, Dec 23 1998 · page 1NYC-WTC_000172218
December 23, 1998 memo submitting Change Order #42 for installing wall washers at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction fax cover sheet, Dec 23 1998 · page 1NYC-WTC_000172219
Facsimile transmission cover sheet from Ambassador Construction dated December 23, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #56 submission, Jan 1999 · page 1NYC-WTC_000172220
Letter from Ambassador Construction submitting Change Order #56 for electrical outlet installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #068 submission, Feb 1999 · page 1NYC-WTC_000172221
Letter from Ambassador Construction submitting Change Order #068 for door astragal installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #072 submission, Feb 1999 · page 1NYC-WTC_000172223
Letter from Ambassador Construction submitting Change Order #072 for pantry equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #85, 7 World Trade Center, May 1999 · page 1NYC-WTC_000172231
Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #086 for WTC ductwork, May 1999 · page 1NYC-WTC_000172235
Memo submitting Change Order #086 for rerouting exhaust ducts at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal, 7 World Trade Center OEM, June 1998 · page 1NYC-WTC_000172285
Revised construction proposal dated June 11, 1998, for Mayor's Office of Emergency Management space at 7 World Trade Center with total project cost of $11,645,746.00.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised construction proposal for 7 World Trade Center, June 1998 · page 1NYC-WTC_000172287
Letter enclosing a revised construction proposal and additional bids for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction proposal for 7 WTC renovation, May 1998 · page 1NYC-WTC_000172316
Proposal from Ambassador Construction Company for demolition and construction work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #85 cover letter, May 1999 · page 1NYC-WTC_000172336
Cover letter submitting Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction Change Order #85, May 1999 · page 1NYC-WTC_000172338
Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #95, 7 World Trade Center receptacles, August 1999 · page 1NYC-WTC_000172349
Cover letter submitting Change Order #95 for $1,046 to install three new electrical receptacles in the Mayor's conference room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #95 for electrical receptacles at 7 WTC, August · page 1NYC-WTC_000172350
Memo submitting Change Order #95 for $1,046 to install three new electrical receptacles in the Mayor's conference room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for leasing services at 7 WTC, May 1999 · page 1NYC-WTC_000172352
Invoice dated May 21, 1999 from a landlord entity requesting payment for leasing services related to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting resubmission of Change Order #81 cost, April 1999 · page 1NYC-WTC_000172359
DCAS official requests review and resubmission of Change Order #81 costs due to insufficient justification for the $8,228.00 amount requested.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting resubmission of Change Order #81 cost, April 1999 · page 1NYC-WTC_000172360
DCAS official requests review and resubmission of Change Order #81 costs due to insufficient justification for the $8,228.00 amount requested.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #84 for TV monitors and lighting, April · page 1NYC-WTC_000172362
Ambassador Construction submits Credit Change Order #84 for $30,681 regarding elimination of TV monitors and installation of wall wash fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #85 for fuel-oil line route adjustment, May 1999 · page 1NYC-WTC_000172365
Ambassador Construction submits Change Order #85 for $34,401 to adjust fuel-oil line routing in elevator pits at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding change order for UPS conversion kit, June 1999 · page 1NYC-WTC_000172367
Memorandum submitting change order #87 for the installation of a UPS conversion kit at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo submitting Change Order #87 for UPS conversion kit, June · page 1NYC-WTC_000172368
DCAS official submits Change Order #87 for a UPS conversion kit installation in an office at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172376 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Certified letter regarding building services, June 1999 · page 1NYC-WTC_000172378
Certified mail and fax cover sheet dated June 23, 1999, addressed to the Director of Building Services at City Hall.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for $2.5M lease payment at 7 World Trade Center, · page 1NYC-WTC_000172380
Invoice dated March 9, 1999 from 7 World Trade Company to the Mayor's Office of Emergency Management for $2,500,000.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172383 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Lease amendment regarding change order work requests, July 1999 · page 1NYC-WTC_000172386
A document excerpt outlining lease terms allowing tenants to request additional change order work and requiring landlord cooperation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for $2.5M lease payment at 7 World Trade Center, · page 1NYC-WTC_000172387
Invoice dated March 9, 1999 from 7 World Trade Company to the Mayor's Office of Emergency Management for $2,500,000.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #091 for pump installation at 7 World Trade · page 1NYC-WTC_000172393
Letter from Ambassador Construction Co. dated July 22, 1999, submitting change order #091 for $6,565 to remedy leakage issues.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding system testing at 7 World Trade Center, July · page 2NYC-WTC_000172395
Cover letter dated July 8, 1999 from a company to the Mayor's Office of Emergency Management regarding testing services.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for test documentation, Jul 1999 · page 1NYC-WTC_000172397
Cover sheet transmitting pages related to a test at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional services authorization, RF system expansion, Jun 1999 · page 1NYC-WTC_000172530
An authorization for additional architectural services to expand the RF distribution system for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172531 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172535 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Draft letter confirming lease agreement for OEM at 7 WTC, · page 1NYC-WTC_000172538
Draft correspondence from DCAS to 7 World Trade Center, L.P. confirming mutual understanding of the lease agreement for Mayor's Office of Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS
Generator load test report, 7 World Trade Center, August 1999 · page 1NYC-WTC_000172542
Report from Ambassador Construction Co. detailing a generator load test conducted on July 31, 1999, and noting minor issues with the differential pressure controller.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification withdrawal, 7 World Trade Center, March 1999 · page 2NYC-WTC_000172561
7 World Trade Company letter to DCAS dated March 9, 1999, withdrawing a substantial completion notice and modifying Article 6 of the lease regarding Port Authority sign-off…
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for $2.5 million, March 9, 1999 · page 1NYC-WTC_000172563
Invoice from 7 World Trade Company to DCAS for $2,500,000 pursuant to the Agreement of Lease for Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172566 · page 2Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for $2.5 million, March 9, 1999 · page 1NYC-WTC_000172568
Invoice from 7 World Trade Company to DCAS for $2,500,000 pursuant to the Agreement of Lease for Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for 7 WTC lease, $2.5 million, March 1999 · page 1NYC-WTC_000172571
Invoice from 7 World Trade Company, L.P. to City for $2.5 million regarding leased space for Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #91 Memo, MOEM 7th Floor, August 1999 · page 1NYC-WTC_000172576
Memo submitting Change Order #91 for $6,565 to remedy water leakage on the 7th floor of 7 World Trade Center associated with the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #91 for MOEM HVAC repair, August 1999 · page 1NYC-WTC_000172578
Memo submitting change order #91 for $6,565 to remedy water leakage on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for 7 World Trade Center MOEM 23rd floor lease, · page 1NYC-WTC_000172582
Invoice regarding lease agreement for Mayor's Office of Emergency Management space on 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal for Mayor's Office, May 1998 · page 1NYC-WTC_000172627
Proposal from Ambassador Construction Company for demolition and interior work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for wall construction, June 1998 · page 1NYC-WTC_000172629
Budget estimate submitted by Ambassador Construction Company to modify walls at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172976 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000172977 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Response to inspection letter, 7 WTC Mayor's OEM, Jun 1998 · page 1NYC-WTC_000173017
Correspondence from Space Design responding to a June 18 inspection letter regarding the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal correspondence, 7 World Trade Center, Feb 1998 · page 1NYC-WTC_000173018
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal changes, 7 World Trade Center, Jun 1998 · page 1NYC-WTC_000173021
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
Citywide Administrative Services, Dept. of · Box 7DCAS
Response to inspection letter, 7 World Trade Center, Jun 1998 · page 1NYC-WTC_000173029
Correspondence from Space Design responding to a June 18 inspection letter regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal changes, 7 World Trade Center, Jun 1998 · page 1NYC-WTC_000173033
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #73, 7 World Trade Center, Mar 1999 · page 1NYC-WTC_000173040
Letter submitting Change Order #73 for the supply of two TV carts for monitors in the PIU room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional trade bids, 7 World Trade Center, Jun 1998 · page 1NYC-WTC_000173042
Letter enclosing additional bids for concrete, masonry, roofing, and other trades to fulfill the requirement of three bids per trade at the Mayor's OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction revised proposal, June 1998 · page 1NYC-WTC_000173073
Revised construction proposal from Ambassador Construction for work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal for OEM facility work, June 1998 · page 1NYC-WTC_000173094
Letter enclosing a revised proposal from a vendor for work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter regarding OEM project cost approval, June 1998 · page 1NYC-WTC_000173098
Letter from DCAS to a property management company disputing claims regarding the approval of work costs for the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173099 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173100 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate review request, OEM 7 WTC, June 1998 · page 1NYC-WTC_000173109
DCAS memo requesting clarifications and confirmations on itemized cost estimates for Mayor's Office of Emergency Management project at 7 World Trade Center floors 1, 7, and 23.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction cost breakdown for OEM, June 1998 · page 3NYC-WTC_000173115
Proposal from Ambassador Construction detailing costs for furniture and panels for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Vendor proposal regarding OEM facility work, June 1998 · page 1NYC-WTC_000173120
Letter from a vendor to DCAS concerning the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Correspondence re: Mayor's Office at 7 WTC, June 1998 · page 1NYC-WTC_000173121
A letter from a contractor to the Department of Citywide Administrative Services regarding work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised construction proposal for Mayor's OEM floors, June 1998 · page 1NYC-WTC_000173147
A revised construction proposal from Ambassador Construction Co. Inc. for demolition and renovation work on the 1st, 7th, and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Correspondence regarding cost estimates for Mayor's OEM project, June 1998 · page 1NYC-WTC_000173149
A letter from the Division of Real Estate Service referencing original and revised cost estimates for renovation work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter re: cost estimates, Mayor's OEM project, June 1998 · page 1NYC-WTC_000173151
Letter from DCAS referencing original and revised cost estimates for the Mayor's Office of Emergency Management renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate correspondence, 7 WTC, June 1998 · page 1NYC-WTC_000173153
DCAS letter to contractor regarding cost estimates for Mayor's Office of Emergency Management work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter re: cost estimates, Mayor's OEM project, July 1, · page 1NYC-WTC_000173155
Letter from DCAS dated July 1, 1998, detailing original and revised cost estimates for the Mayor's Office renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Unit price schedule for security equipment, 1993 · page 1NYC-WTC_000173161
Price schedule listing unit costs for installing relay boxes, switches, conduit, and various security system components.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #004, 7 World Trade Center, September 1998 · page 1NYC-WTC_000173175
Revised change order from Ambassador Construction Co. Inc. for concrete work and panel capacity changes at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #009, 7 World Trade Center, September 1998 · page 1NYC-WTC_000173180
Change order from Ambassador Construction regarding wood door modifications at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #6, 7 World Trade Center, September 1998 · page 1NYC-WTC_000173181
Revised change order for additional furnishing costs submitted by a contractor for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #006, 7 World Trade Center, September 1998 · page 1NYC-WTC_000173182
Change order from Ambassador Construction for furnishing a bullet-resistant door at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #1 for sheetrock work, July 1998 · page 1NYC-WTC_000173184
Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #1 for sheetrock work, July 1998 · page 1NYC-WTC_000173185
Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #7, September 1998 · page 1NYC-WTC_000173187
Memo regarding a revised credit change order for fiber distribution work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate review memo, 7 World Trade Center, May 1998 · page 1NYC-WTC_000173196
Department of Citywide Administrative Services memo requesting clarifications on a cost estimate for the project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal revision letter, June 1998 · page 1NYC-WTC_000173244
Letter from Ambassador Construction Co. revising a proposal amount for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding Mayor's Office of Emergency Management, Oct 1998 · page 1NYC-WTC_000173246
A memo from the Department of Citywide Administrative Services to the Mayor's Office of Emergency Management concerning administrative matters.
Citywide Administrative Services, Dept. of · Box 7DCAS
Correspondence re: Mayor's Office of Emergency Management, July 1998 · page 1NYC-WTC_000173247
A letter from a vendor to the City regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal for generator work, April 1998 · page 1NYC-WTC_000173248
A construction company submits a cost proposal for work at the Mayor's Office of Emergency Management within 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal for MOEM generator work, April 1998 · page 1NYC-WTC_000173250
A contractor submits a $717,890 proposal to install generators and related equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet from Kaback Enterprises, September 1998 · page 3NYC-WTC_000173262
A fax cover sheet from Kaback Enterprises dated September 11, 1998, addressed to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding 7 World Trade Center alteration costs, August 1998 · page 1NYC-WTC_000173266
A letter from the Department of Citywide Administrative Services discussing approved costs and revisions for alterations at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for hurricane wall construction, June 1998 · page 1NYC-WTC_000173269
A budget estimate from Ambassador Construction to construct a hurricane wall at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004 for MOEM work, September 1998 · page 1NYC-WTC_000173271
A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004 for MOEM work, September 1998 · page 1NYC-WTC_000173274
A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet, Ambassador Construction, June 1998 · page 1NYC-WTC_000173290
Facsimile transmission cover sheet from Ambassador Construction Co. dated June 23, 1998 regarding unspecified project items.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost reduction request, Mayor's OEM project, June 1998 · page 1NYC-WTC_000173297
DCAS letter requesting cost estimates for substituting cabling for conduit to reduce expenses on the Mayor's Office of Emergency Management renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, Sept 1998 · page 1NYC-WTC_000173309
Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding wall cost adjustments, July 1998 · page 1NYC-WTC_000173314
Letter from Ambassador Construction confirming cost adjustments for a hurricane wall at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Correspondence regarding floor renovations, June 1998 · page 1NYC-WTC_000173315
Letter dated June 30, 1998, addressed to DCAS officials regarding renovation work on the 23rd and portions of the 7th floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding floor renovations, June 1998 · page 1NYC-WTC_000173316
Letter dated June 30, 1998 addressed to City officials regarding renovation work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter re: OEM estimate response, June 1998 · page 1NYC-WTC_000173319
Letter from Ambassador Construction responding to the Division of Citywide Administrative Services regarding project estimates.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal letter for hurricane wall and visual systems, June 1998 · page 1NYC-WTC_000173335
Letter enclosing proposals for a hurricane wall and visual system work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for hurricane wall construction, June 1998 · page 1NYC-WTC_000173336
Letter from Ambassador Construction submitting a budget estimate for constructing a hurricane wall at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal letter with cost increase, June 1998 · page 1NYC-WTC_000173338
Letter from Ambassador Construction notifying of a revised proposal amount for work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction proposal, 7 WTC floors 1, 7, 23, June 1998 · page 1NYC-WTC_000173352
Revised construction proposal for Mayor's Office of Emergency Management work at 7 World Trade Center totaling $11,645,746.
Citywide Administrative Services, Dept. of · Box 7DCAS
Initial construction proposal for Mayor's Office, May 1998 · page 1NYC-WTC_000173355
Ambassador Construction Co. submits an initial $11.4 million proposal for renovation work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for cost clarifications on 7 WTC project, June 1998 · page 1NYC-WTC_000173360
Department of Citywide Administrative Services requests specific clarifications and confirmations for itemized costs in a bid package for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter requesting cost reductions for 7 WTC project, June 1998 · page 1NYC-WTC_000173390
Department of Citywide Administrative Services requests proposed cost reductions for specific work items at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for cost reductions on 7 WTC project, June 1998 · page 1NYC-WTC_000173394
Department of Citywide Administrative Services requests proposed cost reductions for specific work items including cabling and conduit substitutions.
Citywide Administrative Services, Dept. of · Box 7DCAS
Request for cost reduction proposals on cabling work, June 1998 · page 1NYC-WTC_000173397
DCAS requests proposed cost reductions for cabling and conduit work at the Mayor's Office of Emergency Management renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction cost estimate approval, 7 World Trade Center, July 1998 · page 1NYC-WTC_000173421
Memo summarizing reviewed documentation and approving revised trade cost estimates for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Construction cost data sheet, 7 World Trade Center, 1998 · page 1NYC-WTC_000173432
Fragmented document containing numerical data and project identifiers related to the 7 WTC construction budget.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease compliance letter, 7 World Trade Center, July 1998 · page 1NYC-WTC_000173433
Certified mail from DCAS regarding lease terms and clarifications for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 World Trade Center, Sept 1998 · page 1NYC-WTC_000173445
Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding Change Order #003, August 1998 · page 1NYC-WTC_000173451
Letter from Ambassador Construction submitting Change Order #003 for electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding Change Order #004, August 1998 · page 1NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 World Trade Center, September 1998 · page 1NYC-WTC_000173458
Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding Change Order #006, September 1998 · page 1NYC-WTC_000173467
Letter from Ambassador Construction submitting Change Order #006 for a bullet-resistant door at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Correspondence regarding electricity plan review, June 1998 · page 1NYC-WTC_000173470
Letter discussing electrical issues and plan review requirements for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical Load Breakdown, 7 World Trade Center, May 1998 · page 1NYC-WTC_000173473
Engineering document detailing electrical load breakdown for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical Load Breakdown, 7 World Trade Center, May 1998 · page 2NYC-WTC_000173473
Engineering document detailing electrical load breakdown for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
7 World Trade Center legal correspondence, Apr 2002 · page 4NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for 7 WTC, Nov 1998 · page 1NYC-WTC_000173539
Department of Citywide Administrative Services letter dated November 20, 1998, approving five change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for 7 WTC, Nov 1998 · page 1NYC-WTC_000173541
Department of Citywide Administrative Services letter dated November 20, 1998, approving five change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for 7 WTC, Nov 1998 · page 1NYC-WTC_000173543
Department of Citywide Administrative Services letter dated November 20, 1998, approving five change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for 7 WTC, Nov 1998 · page 1NYC-WTC_000173545
Department of Citywide Administrative Services letter dated November 20, 1998, approving five change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for 7 WTC, Nov 1998 · page 1NYC-WTC_000173547
Department of Citywide Administrative Services letter dated November 20, 1998, approving five change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ceiling inspection memo, 7 World Trade Center OEM, Nov 1998 · page 1NYC-WTC_000173555
Architectural firm observation regarding ceiling conditions on the 23rd floor at OEM offices following site walkthrough.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #37 for OEM at 7 WTC, Dec 1998 · page 1NYC-WTC_000173564
Letter submitting Change Order #37 for stainless steel cladding installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant meeting minutes #15 for OEM, Oct 1998 · page 2NYC-WTC_000173580
Minutes from Ambassador Construction Co. regarding steel interference solutions and project status at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #005 submission letter, 7 WTC, September 1998 · page 1NYC-WTC_000173603
Letter from Ambassador Construction Co. submitting Change Order #005 for $117,684.00 to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173620 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log page 2, 7 WTC, revised September 1998 · page 1NYC-WTC_000173627
Second page of the Request for Information log tracking construction queries at 7 World Trade Center as of September 9, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #8 transmittal letter, 7 WTC, September 1998 · page 1NYC-WTC_000173634
Letter submitting revised Change Order #8 for $11,688.00 to upgrade a door and walls to bullet-resistant standards at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving Change Orders #6,8,9,10 for OEM, Oct 1998 · page 1NYC-WTC_000173636
Memo from DCAS approving cost proposals for four change orders related to door revisions and drawing updates at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #15 for wall sleeves at 7 WTC, Oct · page 1NYC-WTC_000173643
Letter submitting Change Order #15 for the installation of new sleeve locations on the 23rd floor to support cabling at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #12: Switch upgrade, 7 WTC, Oct 1998 · page 1NYC-WTC_000173701
Letter submitting Change Order #12 to install meters and upgrade a 2500 amp switch at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #11: Door modification, 7 WTC, Oct 1998 · page 1NYC-WTC_000173705
Letter submitting Change Order #11 to modify door 05 from hollow metal and glass at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #11: Door modification, 7 WTC, Oct 1998 · page 1NYC-WTC_000173706
Letter submitting Change Order #11 to modify door 05 from hollow metal and glass at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #14: Generator test, Oct 1998 · page 1NYC-WTC_000173708
Letter submitting credit change order #14 to remove costs for witnessing an emergency generator field test.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #14: Generator test, Oct 1998 · page 1NYC-WTC_000173709
Letter submitting credit change order #14 to remove costs for witnessing an emergency generator field test.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #12: Switch upgrade and meter installation, Oct 1998 · page 1NYC-WTC_000173711
Letter submitting Change Order #12 to install meters and upgrade a 2500 amp switch at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #12 for switch upgrade at 7 WTC, Oct · page 1NYC-WTC_000173712
Letter submitting change order #12 to increase the size of a 2500 amp switch and install voltmeter and ammeter equipment.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #13 for framing and sheetrock work, Oct 1998 · page 1NYC-WTC_000173713
Letter submitting a change order for additional framing, sheetrock, fascia, and soffit installation at a doorframe.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #13 for framing work at 7 WTC, Oct · page 1NYC-WTC_000173714
Letter submitting change order #13 for additional framing, sheetrock blocking, and fascia work at a doorframe and soffit.
Citywide Administrative Services, Dept. of · Box 7DCAS
Minutes of consultant meeting #15, 7 WTC, Oct 27 1998 · page 2NYC-WTC_000173723
Meeting minutes from October 27, 1998, for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #003 for Ambassador Construction, Aug 21, 1998 · page 1NYC-WTC_000173748
Formal change order submitted by Ambassador Construction to perform work on plug mold outlets and A/V cabling at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #001 for OEM renovation, July 1998 · page 1NYC-WTC_000173783
Letter from Ambassador Construction submitting Change Order #001 for sheetrock wall offset work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Minutes of Consultant's Meeting #1: Shop drawing status, July 1998 · page 1NYC-WTC_000173789
Record of a meeting reviewing the status of HVAC and other shop drawings for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004 for OEM, September 1998 · page 1NYC-WTC_000173810
Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #21 transmittal, 7 WTC, Oct 1998 · page 1NYC-WTC_000173818
Letter submitting Change Order #21 for structural work at the water tank and switch gear areas on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #21 transmittal, 7 World Trade Center, Oct 1998 · page 1NYC-WTC_000173819
A letter submitting change order #21 for structural work on the 7th floor of 7 WTC to the Department of Citywide Administrative Services.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #20 for fan power work, 7 WTC, Oct · page 1NYC-WTC_000173820
Letter submitting Change Order #20 for $12,866 to provide power for fan power boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #20 transmittal, 7 World Trade Center, Oct 1998 · page 1NYC-WTC_000173821
A letter submitting change order #20 for electrical work on fan power boxes at the Mayor's Office of Emergency Management in 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #19 for acoustic panels, 7 WTC, Oct 1998 · page 1NYC-WTC_000173822
Letter submitting Change Order #19 for $4,636 to replace 36 acoustic panels at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #19 transmittal, 7 World Trade Center, Oct 1998 · page 1NYC-WTC_000173823
A letter submitting change order #19 for the replacement of acoustic panels at the Mayor's Office of Emergency Management in 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #17 for floor boxes, 7 WTC, Oct · page 1NYC-WTC_000173824
Letter submitting a revised Change Order #17 adjusting costs for combination floor boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #17 transmittal, 7 World Trade Center, Oct · page 1NYC-WTC_000173825
A letter submitting a revised change order #17 regarding floor boxes at the Mayor's Office of Emergency Management in 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #002 for cooling towers, 7 WTC, July 1998 · page 1NYC-WTC_000173833
Change order #002 submitted by Ambassador Construction to modify cooling tower pan construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding hurricane wall costs, 7 WTC, July 1998 · page 1NYC-WTC_000173845
Letter from Ambassador Construction disputing the cost increase for upgrading the hurricane wall at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order 7 for 7 WTC, September 1998 · page 1NYC-WTC_000173847
Revised credit change order for fiber distribution system and equipment work at 7 WTC Mayor's Office Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173857 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #34 for metal cap flashing, 7 WTC, November · page 1NYC-WTC_000173858
Ambassador Construction submits Change Order #34 to furnish and install a new metal cap flashing with drip return at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173859 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #33 for conduit extension, 7 WTC, November 1998 · page 1NYC-WTC_000173860
Ambassador Construction submits Change Order #33 to extend conduits and install sleeves in the telco closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173861 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #32 for coat closet construction, 7 WTC, Nov · page 1NYC-WTC_000173862
Ambassador Construction submits Change Order #32 to construct a new coat closet in room 23-09 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000173863 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #031, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173864
Ambassador Construction submits change order #031 for security wire installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #30, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173865
Submission of change order #30 for a new concrete pad for UPS equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #30 for concrete pad and roof work, Nov · page 1NYC-WTC_000173866
Ambassador Construction submits Change Order #30 for an 8-inch concrete pad for UPS equipment and drilling into the roof slab at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #29, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173867
Change order #29 submitted for adding duplex outlets and switches in the training room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #29 for electrical outlets, 7 World Trade Center, · page 1NYC-WTC_000173868
A memo submits Change Order #29 for $464 to add duplex outlets and switches in a training room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #28, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173869
Change order #28 submitted to modify electrical work for independent feeding of ELP-23N equipment.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #28 for electrical conduit modification, 7 World Trade · page 1NYC-WTC_000173870
A memo submits Change Order #28 for $1,478 to modify conduits and install new wire for independent power feeds at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #27, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173871
Credit change order #27 submitted for painting the LAN room instead of installing VCT flooring.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit Change Order #27 for LAN room flooring, 7 World · page 1NYC-WTC_000173872
A memo submits a credit of $481 to replace VCT flooring with painting in the LAN room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173874
Change order #26 submitted for drywall work including closing door openings at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #26 for drywall and electrical work, 7 World · page 1NYC-WTC_000173876
A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #25, 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000173878
Change order #25 submitted for structural support of microwave dishes on the bulkhead wall at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #25 for microwave dish structural support, 7 World · page 1NYC-WTC_000173879
A memo submits Change Order #25 for $36,199 to install steel supports and beams for microwave dishes on the roof of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #016R for electrical work, 7 WTC, Nov 1998 · page 1NYC-WTC_000173884
Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #075 for UPS installation, 7 World Trade Center, · page 1NYC-WTC_000173896
Contractor submission of change order #075 to install two UPS units at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Authorization request #5576CL for 7 WTC work, Mar 1999 · page 2NYC-WTC_000173898
Request for signature on authorization #5576CL regarding construction work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #082 for blast door installation, 7 WTC, Apr · page 1NYC-WTC_000173903
Ambassador Construction submits Change Order #082 for $8,313 to replace a hollow metal door with a blast-resistant one at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for $2.5 million lease payment, 7 World Trade Center, · page 1NYC-WTC_000173910
Invoice submitted by landlord to the City for lease payments related to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter withdrawing SC Notice and modifying lease terms, 7 WTC · page 2NYC-WTC_000173911
Landlord correspondence withdrawing a prior notice and agreeing to modify lease requirements for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment request of $7 million for construction, 7 World Trade · page 1NYC-WTC_000173914
Contractor letter requesting payment for construction work at the Mayor's Office of Emergency Management per lease terms.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #67 for Mayor's Office of Emergency Management, February · page 1NYC-WTC_000173944
Cover letter submitting Change Order #67 for furnishing and making up five power cords with 15 amp plugs.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #67 for Mayor's Office of Emergency Management, February · page 2NYC-WTC_000173944
Cover letter submitting Change Order #67 for furnishing and making up five power cords with 15 amp plugs.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #68 for OEM door astragal, February 1999 · page 1NYC-WTC_000173946
Cover letter submitting Change Order #68 for furnishing and installing one astragal on a pair of doors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised service agreement cover letter, HVAC maintenance, Feb 18, 1999 · page 1NYC-WTC_000173951
Cover letter submitting a revised service agreement for air conditioning maintenance at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for WTC OEM Job #S57-5175, Feb 25, · page 1NYC-WTC_000173970
Transmission cover sheet from Ambassador Construction regarding work at the Mayor's Office of Emergency Management in the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #074 for blackout shades, OEM 7 WTC, Mar · page 1NYC-WTC_000173977
Change order submitted by Ambassador Construction to install blackout shade blinds and fabric for the Mayor's conference room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #52 Submission, 7 World Trade Center · page 1NYC-WTC_000173988
Submission of Change Order #52 for $38,987 regarding electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #52 submission for 7 WTC OEM work, Jan · page 1NYC-WTC_000173991
A transmittal letter submitting Change Order #52 for $38,987 for electrical modifications in a Commissioner's office at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #53 Submission, 7 World Trade Center · page 1NYC-WTC_000173994
Submission of Change Order #53 for $2,898 covering additional electrician work at the site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #53 submission for 7 WTC OEM work, Jan · page 1NYC-WTC_000173996
A transmittal letter submitting Change Order #53 for $2,898 for additional electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #55 Submission, 7 World Trade Center · page 1NYC-WTC_000173998
Submission of Change Order #55 for $34,954 addressing fuel oil line installation issues.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #55 submission for 7 WTC OEM work, Jan · page 1NYC-WTC_000173999
A transmittal letter submitting Change Order #55 for $34,954 regarding conduit repairs in the loading dock and lobby of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #54 Submission, 7 World Trade Center · page 1NYC-WTC_000174001
Submission of Change Order #54 for $2,670 for work performed on a time and material basis.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #54 submission for 7 WTC OEM work, Jan · page 1NYC-WTC_000174002
A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification letter re: Mayor's Office space, Mar 1999 · page 2NYC-WTC_000174040
Letter from 7 World Trade Company modifying lease terms and withdrawing a notice regarding the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for Mayor's Office space rent, March 1999 · page 1NYC-WTC_000174042
Invoice from 7 World Trade Company requesting $2.5 million payment for the Mayor's Office of Emergency Management lease.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification letter re: Mayor's Office space, Mar 1999 · page 2NYC-WTC_000174043
Letter from 7 World Trade Company modifying lease terms and withdrawing a notice regarding the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for Mayor's Office space rent, March 1999 · page 1NYC-WTC_000174045
Invoice from 7 World Trade Company requesting $2.5 million payment for the Mayor's Office of Emergency Management lease.
Citywide Administrative Services, Dept. of · Box 7DCAS
Lease modification letter re: Mayor's Office space, Mar 1999 · page 2NYC-WTC_000174046
Letter from 7 World Trade Company modifying lease terms and withdrawing a notice regarding the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000174048 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for Mayor's Office of Emergency Management lease, March 1999 · page 1NYC-WTC_000174049
Invoice from 7 World Trade Company to the City for $2.5 million regarding the Mayor's Office of Emergency Management lease dated March 4, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice for Mayor's Office of Emergency Management lease, March 1999 · page 1NYC-WTC_000174050
Invoice from 7 World Trade Company to the City for $2.5 million regarding the Mayor's Office of Emergency Management lease dated March 4, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
Generator load test memo for Mayor's Office, August 1999 · page 1NYC-WTC_000174095
Memo from Ambassador Construction Co. regarding a generator load test conducted on August 31, 1999, at the Mayor's Office of Emergency Management, 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000174099 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000174132 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS
NYC-WTC_000174135 · page 1Citywide Administrative Services, Dept. of · Box 7DCAS