JUN. 5. 1993 12:53PM SWOKE HAYDEN CONNELL AECHITECTS^TJJJJ NO. 1617 P. 2/3
295 Lafayette street, New York, New York 10012
eiSS26 9Adfl, Fax 2;2 21 SOWS
June 4,1998
Ms. Catherine Ciliberti
Senior Vice President
Silverstein Properties, Inc.
120 Broadway, 3 Sih Floor
New York, New York 10271
Re: Mayor’s Office of Emei^cy Management (OEM)
Emergency Operations Center; 7 World Trade Center
"Proposal for Additional Architectural and Engineering Design ServKSs:
Uppadtsd ‘Protective Wall ’ Design and Scope Revisions "
SHCA Project No 5576CC
Dear Mr. Ritorto:
Per SHCA’s review of the Mayor's Office of Emergency Management’s comments to the 100% C.D.
drawing issuance (04-06-98) which were received 04-22-98 and 04-28-98, the OEM comments request
sevaral revisions which are changes in scope. In connection with the above referenced proposal,
SHCA has reviewed the scope of work referenced in SHCA’s 10-24-98 agreement with Silverstein
Properties, Inc. (Draft Silverstein RFP-07-24-97, OEM Program Summaiy-07-21-97, OEM Space
Dcsign-Programming-OS-18-97 & DCAS/DRES Standards-10-96), all Correspondence from
Silverstein/DCAS/OEM and all meeting conference reports. SHCA cannot find any specific reference
In the program requirements to design a “hurricane wall” that can resist Category 4 hurricane winds
with wind pressures indicated in OEM's 04-22-98 comments. SHCA cannot find any record requesting
the extension the scope of the “hurricane wall” beyond the exterior wall and tolly envelope the entire
Emergency Operations Center and support spaces on the southern portion of the 23'* Floor per OEM’s
marked-up plan received 04-28-98.
In previous discussions with OEM, OEM expressed a need to have a protective wall In front of the
exterior wall of the Emergency Operations Center to protect its occupants from broken glass and rain
in the event of a hurricane (of an unspecified magnitude). In a SHCA Conference Report dated 11-17-
98, item 3.4 records agreement that the exterior wall glazing shall be blockcd-off by a lightweight
drywall partition designed to address the OEM security and hunricane wind load concerns
Swanke Hayden Connell & Partners LLP (SHCA) wishes to submit its proposal for architectural and
engineering services in connection with the above referenced revised design work as follows:
Scoot of Work
• Work with DCAS/OEM to establish the revised “protective waU" design criteria required tor this
project
• Develop alternate design studies of wall assemblies and study their feasibility tor implementation.
Wall assemblies will be studied against the revised design enteria, the impact to the base building
exterior wall assembly (in leims of access and ventilation), structural (in terms of floor loading
and anchorage) and mechanical systems.
• Upon selection of a proposed wall assembly, review and obtain approval of the assembly from
DCAS, OEM, Silverstein Properties, Inc. and the Port Aulhoriiy.
« Revise and coordinate the approved 100% C.D. drawings and specifications dated 05-04-98 and
issue a bulletin for bidding. Scope includes toll coordination with structural, mechanical,
telecommunications, audio-visual, radio, security, etc.
* Additional construction administration required for this scope of work.
Services not Included:
Swsmke Hayden Connell Ltd./Swank« Hayden Connoll i Pannett LLP
Canoui iHUinbul London Miami New York Stamfiird Waahinfton