June 25, 1998
Ms. Catherine Giliberti
Senior Vice President
Silverstein Properties, Inc.
120 Broadway, 36th Floor
New York, New York 10271
Re: Mayor’s Office of Emergency Management (OEM)
Emergency Operations Center: 7 World Trade Center
"Proposalfor Additional Architectural and Engineering Design Services:
Upgraded Revised 'Protective Wall'Design and Scope Revisions:
Cost Reduction Scope Revisions "
SHCA Project No. 5576 CC & CD
Dear Ms. Giliberti:
This proposal for additional design services includes work requested as part of as part of the review of
100% C.D. submission and subsequent requests for revisions received on June 18, 1998.
Per SHCA's review of the Mayor's Office of Emergency Management’s comments to the 100% C.D.
drawing issuance (04-06-98) which were received 04-22-98 and 04-28-98, the OEM comments request
several revisions which are changes ip scope. SHCA has reviewed the scope of work referenced in
SHCA's 10-24-97 agreement with Silverstein Properties, Inc. including all scope and program
information referenced in the agreement, all correspondence from Silverstein/DCAS/OEM and all
meeting conference reports to date. SHCA also cannot find any reference in these documents that
require the design of a “hurricane waif that can resist Category 4 hurricane winds with wind pressures
as indicated in OEM’s 04-22-98 comments. SHCA also cannot find any record requesting the
extension of the scope of the “hurricane wall” beyond the exterior wall which will fully envelope the
entire Emergency Operations Center and support spaces on the southern portion of the 23" Floor per
OEM’s marked-up plan received 04-28-98.
In previous discussions with OEM, OEM expressed a need to have a protective wall in front of die
exterior wall of the Emergency Operations Center to protect its occupants from broken glass and rain
in die event of a hurricane (of an unspecified magnitude). In a SHCA Conference Report dated 11-17-
98, item 3.4 records agreement that the exterior wall glazing shall be blocked-off by a lightweight
drywall partition designed to address the OEM security and hurricane wind load concerns.
In addition, the Department of Citywide Administrative Services (DCAS) letter dated June 18, 1998 to
Silverstein Properties, Inc., DCAS requests several additional revisions which are changes in scope
including further revisions to the ‘protective wall’. These revisions in scope will require the issuance
of an addendum to the approved 100% C.D. drawings and specifications previously issued for bid.
Also, the revised C.D. set will require re-submission for review and approval to the Port Authority of
NY & NJ.
Swanke Hayden Connell & Partners LLP (SHCA) wishes to submit its proposal for architectural and
engineering services in connection with the above referenced revised design work as follows:
Swanku Hxydpn Connell LulTSwanke Hayden Connell 4 Partners LLP
Caracas Istrnhul London Miami New York .Stamlnrrt Washington
NYC-WTC_000172131
OCR can misread numbers and units. Confirm readings against the page image before using them.