Architectural design proposal, 7 World Trade Center, June 1998

Machine-extracted title · confidence 95%

Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.

NYC-WTC_000172131–000172133

Folder label: “OEM Ernergency Operations Center: 7 WTC Proposal for Additional Architectural and Engineering Design Services: Upgraded Revised 'Protective Wall' Design Scope Revisions; Cost Reduction Scope Revisions SHCA Project No. 5576 CC & CD DCAS

Page image
Scanned page image, NYC-WTC_000172132
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JUH. 2S'. 1693 3:02PM 3WANKE H.AYDEN CONNELL ARCHITECTS NO. 3362 P. 3/4 Catnenne uiliberti - oiiverstein nopercies, me. SHCA Project No. 5576CD " OEM Emergency Operations Center-7 World Trade Center: Proposalfor Additional Architectural and Engineering Design Services: Upgraded Revised 'Protective Wall' Design and Scope Revisior^; Cost Reduction Scope Changes"

Date: June 25,1998

Scope of Work • Work with DCAS/OEM to establish the revised “protective wall” design criteria required for this project • Develop alternate design studies of wall assemblies and study their feasibility for implementation. Wall assemblies will be studied against the revised design criteria, the impact to the base building exterior wail assembly (in terms of access and ventilation), structural (in terms of floor loading and anchorage) and mechanical systems. • Upon selection of a proposed wall assembly, review and obtain approval of the assembly from DCAS, OEM, Silverstein Properties, Inc. and the Port Authority. * Revise and coordinate the approved 100% C.D. drawings and specifications dated 05-04-98 and issue a bulletin for bidding. Scope includes full coordination with structural, mechanical, telecommunications, audio-visual, radio, security, etc. • Revise architectural and engineering C.D. set to incorporate items 1 .a, I .b, 1 .c, 2.1,2,2,3 & 4 as modified per SHCA’s meeting with DCAS on June 22,1998 in which DCAS clarified the scope of work requested. A summary of the scope of work is as follows;

l.a Per previous review with Silverstein Propenies, Inc.(SPI), SPI will allow the use of BX Cabling instead of £MT Conduit specified in the C.D. documents in accordance to the PA/7 World Trade Center Mechanical Design Guidelines, Specifications and Standard Details- Electrical, Communications. 1 .b Electrical & Telecommunication C.D. will be clarified to show delineation of scope for the telecommunication cabling between Ambassador and DolTT. l.c Eliminate the requested Audio-Visual Equipment in accordance to Exhibit “A” of the DCAS letter. 2.1 Per the DCAS meeting, the steel vault construction including the safe door designed to Vikonics, Inc. specifications for Room 23-16 is eliminated. Standard office foil-height diywall partitions will be utilized for this room. Per the DCAS meeting, all bullet-resistant fiberglass shielding shall be removed in all spaces except the “protective wall” where it will be shown as an add/alternate.

2.2 Eliminate all bullet-resistant doors and frames with standard hollow metal doors and frames as requested- Similar blast resistant doors will be utilized as part of the “protective wall” only. 3. Eliminate folding partitions and support steel and replace with acoustically rated standard drywall partirions for Rooms 23-44,23-45 & 23-46 as requested. 4. See item 2.1 above. 5. The C.D. revisions to the upgraded ‘protective wall' designed to withstand 150 mph wind loads are substantially complete. SHCA will make revisions under this agreement to incorporate the additional DCAS requested revisions as directed in their June 18,1998 letter. Per the DCAS meeting, the scope or extent of the wall remains per the upgraded design with the following revisions:

a. Wall shall be designed to meet wind pressures 90 mph wind loads instead of 150 mph loads. b. Motorized air dampers shall be installed in the wall per the “upgraded” wall with an alternate deduct for manually operated air dampers. c. Doors shall be “upgraded” to meet 90 mph wind loads and fully weatherstripped. W;\SS7BU\OEMOOC«FSa>ALVERBTBIN W-ZS-OB S57BCC-CO PRQPQSAUDOC

NYC-WTC_000172132

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172132Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.988

machine-extracted · confidence unavailable · Check page ↗
Fax transmission log, June 1998 · Box 7DCAS

NYC-WTC_000167208

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.

7 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.970

machine-extracted · confidence unavailable · Check page ↗
DCAS approval letter re: OEM consultant team, Nov 1997 · Box 7DCAS

NYC-WTC_000167244

Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.936

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

4 shared non-person entities · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Fax transmission log, June 1998 · Box 7DCAS

NYC-WTC_000167208

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.

Similar indexed content

NYC-WTC_000166787 · Box 7DCAS

Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.

Similar indexed content