NYC 9/11 Public Portal Document
MAY. 2'. !99? i:2g?M SV/ANEE HAYDEN CONNELL AEOErECTS "0. OjT /; L
SwAHK! Haueh CcNiELi Architects
OEM Fax: Additional Service Amhorization-Consultant Proposals
Date: May 27, 1998
Page 2
comers). While the structural design and protection of penetrations has been upgraded, the required venting of
the cavity between the windows and this upgraded structural drywall partition and access via access doors
remains the same as the partition currently shown on the OEM/DCAS/Silverstein/Port Authority approved
drawings. Some of the additional upgrades are as follows;
Under normal operations, this cavity between the windows and the protective wall requires to be vented for
heating in winter and venting of heat away from the windows during summer to prevent blow-out by heat
build-up (2 grilles per bay; one top, one bottom). In addition, 24” x 24” access doors are required to allow
maintenance personnel to perform any repairs or cleaning necessary (one per bay). Under normal conditions
the vents will be operational. Under hurricane conditions, OEM shall control from the command podium
motorized air dampers to shut down the grilles. All doois and access doors penetrating this wall shall be
weather-stripped, pre-engineered blast doors to withstand the above noted design loads. All penetrations
through this wall must be carefully reviewed and detailed. Where possible, we will look at ways to avoid
penetrating this wall by re-routing.
At die request of OEM/DCAS, SHCA has prepared the attached preliminary package for your review and
approval Per previous correspondence from DCAS, DCAS acknowledged that this scope of work is an
additional service to the SHCA project team and the revised drawings will result in a Bulletin/Change Order to
Ambassador construction. DCAS has requested that Ambassador prepare a preliminary budget based upon
the attached information. SHCA is preparing an Additional Service Authorization design proposal for your
review and approval.
Should Silverstein or Ambassador have any questions or need clarification in order to perform your
review/budgeting, please call me at your earliest convenience. SHCA will not proceed any frirfter until it
receives approval and direction from Silverstein Propenies, inc.
W:di7flAC£i«jdcS\FA»FiLE>AJMySTFix;'SLWBiSTBniM;'^E^^^^^
Swunlcis Hayden Connell Ltd/Swanke Hayden Connell ft Partners LLP
295 Lafayette Street, New York, New Yoik 10012
212 226 9696. Fax 212 219 0059
NYC-WTC_000166788