S’VnNKt HAYDEN CONNELL ARCElTc, NO. 3362 F. 24
208 Lafayette Street. New York. New York 10012
212 226 9696, Fax 212 219 0059
June 25,1998
Ms. Catherine Gitibeni
Senior Vice President
Silverstein Properties, Inc,
120 Broadway, 36th Floor
New York, New York 10271
Re: Mayor’s (Office of Emergency Management (OEM)
Emergency Operations Center; 7 World Trade Center
“Proposalfar Additional Archneotural and Engineering Design Services:
Up^adedRevised 'Protective Wali ' Design and Scope Revisiwis;
Cost Redwtion Scape Re^^isions "
SHCA Project No. 5576 CC & CD
Dear Ms. Oiliberti:
This proposal for sidditional design services includes work requested as part of as part of the review of
100% CD. submission and subsequent requests for revisions received on June 18, 199g
Per SHCA's review of the Mayor’s Office of Emergency Management’s comments to the 100% C.D.
drawing issuance (04-06.98) which were received 04-22-98 and 04-28-98, the OEM comments request
severai revisions which are changes in scope. SHCA has reviewed the scope of wexk referenced in
SHCA’s 10-24-97 agreement with Silverstein Prc^rties, Ine. including all scope and program
intormation referenced in the agreement, all correspondence from Silverstein/DCAS/OEM and all
meeiLng conferKoce reports to date, SHCA also cannot find any reference in these documents that
require the design of a “hurricane wall” that can resist Category 4 hurricane winds with wind prasures
as indicated m OEM’s 04-22-98 conjincnts, SHCA also cannot find any record requesting the
extension of the scope of the “hurricane wall” beyond the exterior wall which will hilly envelope the
entire Emergency Operations Center and support spaces on the southern portion of the 23'“ Floor per
OEM’s marked-up plan received 04-28-98.
In previous discussions widi OEM, OEM expressed a need to have a protective wall in front of the
exterior wall of the Emergency Operations Center to protect its occupants from broken glass and rain
in the event of a hurricane (of an unspecified magnitude). In a SHCA Conference Report dated 11-17-
98, item 3.4 records agreement that the exterior wall glazing shall be blocked-off by a lightweight
drywall partition designed to address the OEM security and hurricane wind load cancer ns.
In addition, the Department of Citywide Administrative Services (DCAS) letto dated June 18, 1998 to
Silverstein Properties, Inc., DCAS requests several additional revisions which arc changes in scope
iiicluciing further revisions to Ute ‘protective wall’. These revisions in scope will require the issuance
of an addendum to the approved 100% C.D. drawings and specificatiors previously issued for bid.
Also, the revised C.D set will require re-submission for review and approval to the Pon Audiority of
NY & NJ.
Swankc Hayden Connell & Partners LLP (SHCA) wishes to submit its p’opcsal for ai'chitectural and
cngineei ing services in connection with the above referenced revised design work as follows:
Svaiikp Hayfien ConneU Jzd./S’iaj'ikw Hayden Connf-l! i Partners LLP
Caracas latanhul J^ndon Miami Naw York .‘itamlnrd WanhSnston
NYC-WTC_000171248
OCR can misread numbers and units. Confirm readings against the page image before using them.