NYC 9/11 Public Portal Document
JUN. 5. 1998 12-:5i?M SVANKE HAYDEN CONNELL AECHITECTS NO. 161? F. 3/
Catherine Oiliberti - bilverstem iropemes, inc.
SHCA Project No. SS76CC
" OEM Emergency Operations Center-7 fVorld Trade Center:
Proposalfor Additional Archiieciural and Engineering Design Services:
Upgraded ‘Protective Wall Design and Scope Revisions"
Date: June 4,1998
Pagel
• Exterior Wall Consultant Services.
• Cost Estimating
Compensation;
1. SHCA and its consultants will provide all the Professional Services outlined above
for a lump sum fee of S 56,750 plus out-of-pocket expenses.
2. Out-of-pocket expenses to be billed at cost and shall include, and are limited to, a
maximum amount of S 6,800 for the following hems: blueprinting, CAD Plotting,
copying, foxing and messenger services, etc. as deemed necessary.
The above noted fee and expenses shall be billed monthly on a percent complete basis to your
attention. Should this proposal be acceptable to you, please indicate your acceptance by signing one of
the enclosed copies and returning it to me.
We appreciate the opportunity to submit this proposal to Silverstein Properties, Ino.
Sincerely,
SWANKE HAYDEN CONNELL ARCHITECTS Accepted for Silverstein Properties, Inc.:
By:
Title:
Carl R. Meinhardt. FAIA
Principal Date:
cc: Mr. Joseph Ritorto-Silverstein Properties, Inc. Mr. Josep Domingucz-DCAS/DRES
Mr. Richard J. Ramos - DCAS.DRES Mr. Vinidus Castagnola-DCAS/DRES
W\:S7eiAt0wnM<tF(M\SiV«r(l«in 0604-96 5S76CC PriOOBtIDoc
NYC-WTC_000167209
OCR can misread numbers and units. Confirm readings against the page image before using them.