← Document results/7DCAS/Mayor's Office of Emergency Management (OEM)®Emergency Operations Center: 7 World Trade Center®Proposal for Architectural and Engineering Design Services®SHCA Project No. 5576A
Document / 3 pages

DCAS approval letter re: OEM consultant team, Nov 1997

Machine-extracted title · confidence 95%

Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.

NYC-WTC_000167244–000167246

Folder label: “Mayor's Office of Emergency Management (OEM)®Emergency Operations Center: 7 World Trade Center®Proposal for Architectural and Engineering Design Services®SHCA Project No. 5576A

Page image
Scanned page image, NYC-WTC_000167245
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Joseph Ritorto - Silverstein Properties, Inc. SHCA Project No. 5576A " OEM Emergency Operations Center- 7 World Trade Center: Proposalfor Architectural and Engineering Design Services" Date: October? I, 1997, Revised October 24, 1997

Page 2

Services Not Included

• Programming Design Services (other than verification of the existing program ). • Security Design Services. • Structural Engineering Design Services. • Code Expediting/CodeConsultant Services. • Cost Estimating. • Asbestos Abatement Inspections, Testing and other services in connection with asbestos abatement. • Models & Renderings. • Preparation of a Manifest List for purchase of equipmentto be installed in this project • Periodic site visits and/or meetings during Construction Administration in excess of weekly unless specifically described herein or by the attached consultant proposals. • Field Probes, Surveys & Testing Services. • Architectural and Engineering Design Services required to upgrade the existing base building infrastructure to meet tenant program requirements unless specifically described herein or by the attached consultant proposals. • Architectural and EngineeringDesign Services required for programmed Back-up Systems which are not on the same floor as the Operations Center (23"“ Floor) unless specifically described herein or by the attached consultant proposals. • Existing Condition AutoCad drawing files. Should the CAD drawing files not exist, SHCA can perform this additional service for a lump sum of $ 8,000 plus out-of-pocket expenses for the not- to-exceed amount of $ 1,000.

CompensatioR

1. SHCA will provide all the Professional Services outlined above for a lump sum fee of $ 385,497 plus out-of-pocket expenses. Engineering design services for the Emergency Generator shall be provided for a not-exceedfee of $ 30,000 (at 3.0 x D.P.E.) per the attached engineering proposal plus out-of pocket expenses. Architectural and MEP controlled inspections shall be provided for a not-to-exceed fee of$ 22,000 (at 3.0 x D.P.E) plus out-of-pocketexpenses.

2. Out-of-pocketexpenses to be billed at cost and shall include, and are limited to, a maximum amount of S 3 8,550 for the following items: blueprinting, CAD Plotting, copying, faxing and messenger services, etc. as deemed necessary. Out-of-pocket expenses to be billed at cost to a not-to-exceedmaximum amount of $ 3,000 for the Emergency Generator design services and $ 2,200 for the Controlled Inspection services.

3. All Department of Building Filing Fees to be paid by Landlord.

The above noted fees and expenses shall be billed monthly on a percent complete basis to your attention. Should this proposal be acceptable to you, please indicate your acceptance by signing one of the enclosed copies and returning it to me.

CAMy Documenls'OEM PropossKSilverstsin 10-24-97 Fea Propoul.Doc

NYC-WTC_000167245

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167245Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax transmission log, June 1998 · Box 7DCAS

NYC-WTC_000167208

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.941

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.935

machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →