NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management (OEM)®Emergency Operations Center: 7 World Trade Center®Proposal for Architectural and Engineering Design Services®SHCA Project No. 5576A
Document / 3 pages

Consultant proposal letter re: OEM design services, Oct 1997

Machine-extracted title · confidence 95%

Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000167249–000167251

Folder label: “Mayor's Office of Emergency Management (OEM)®Emergency Operations Center: 7 World Trade Center®Proposal for Architectural and Engineering Design Services®SHCA Project No. 5576A

Page image
Scanned page image, NYC-WTC_000167250
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Joseph Ritorto - Silverstein Properties, Inc. SHCA Project No. 5576A " rXf Emergency Operations Center- 7 iVorld Trade Center: Proposalfor Architectural and Engineering Design Services" Date: October? 1, 1997

Page?

9 Assist in the filing of the Certificate of Occupancy 10. Preparation of "As-Builf Drawings.

Services Not Included • Programming Design Services (other than verification of the existing program). • Security Design Services. • Structural Engineering Design Services. • Code Expediting/CodeConsultant Services. • Cost Estimating. • Asbestos Abatement Inspections, Testing and other services in connection with asbestos abatement. • Models & Renderings. • Preparation of a Manifest List for purchase of equipment to be installed in this project. • Periodic site visits and/or meetings during Construction Administration in excess of bi-weekly. • Field Probes, Surveys & Testing Services. • Architectural and Engineering Design Services required to upgrade the existing base building infrastructure to meet tenant program requirementsunless specifically described herein or by the attached consultant proposals. • Architectural and Engineering Design Services required for programmed Back-up Systems which are not on the same floor as the Operations Center (23"* Floor) unless specifically described herein or by the attached consultant proposals.

Compensatiott

1. SHCA will provide all the Professional Services outlined above for a lump sum fee of $ 407,497 plus out-of-pocketexpenses. Engineeringdesign services for the Emergency Generator will be provided for a not-not-exceedfee of S 30,000 per the attached engineering proposal plus out-of pocket expenses.

2. Out-of-pocketexpenses to be billed at cost and shall include, and are limited to, a maximum amount of $ 40,750 for the following items; blueprinting, CAD Plotting, copying, faxing and messenger services, etc. as deemed necessary. Out-of-pocket expenses to be billed at cost to a not-to-exceed maximum amount of $ 3,000 for the Emergency Generator design services.

3. All Departmentof Building Filing Fees to be paid by Landlord.

The above noted fees and expenses shall be billed monthly on a percent complete basis to your attention. Should this proposal be acceptable to you, please indicate your acceptance by signing one of the enclosed copies and returning it to me.

C \My DocumenmOEM Propot»l\Fe« PropOMi Silv«ntMi-1 Ooc

NYC-WTC_000167250

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167250Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DCAS approval letter re: OEM consultant team, Nov 1997 · Box 7DCAS

NYC-WTC_000167244

Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.

9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗
Fax transmission log, June 1998 · Box 7DCAS

NYC-WTC_000167208

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.937

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →