Consultant proposal letter re: OEM design services, Oct 1997

Machine-extracted title · confidence 95%

Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000167249–000167251

Folder label: “Mayor's Office of Emergency Management (OEM)®Emergency Operations Center: 7 World Trade Center®Proposal for Architectural and Engineering Design Services®SHCA Project No. 5576A

Page image
Scanned page image, NYC-WTC_000167249
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SwANKE Hayden Conn eh Architects

i.afjy lt,' Slrvrt. X. u 1IMI12 J12 h'a\ -12 2191*If.;I

October? I. 199’

Mr. Joseph Ritorto Senior Executive Vice President Silverstein Properties, Inc. 521 Fifth Avenue, 31” Floor New York, New York 10175

Re: Mayor’s Office of Emergency Management (OEM) Emergency Operations Center: 7 World Trade Center "Proposalfor Architectural and Engineering Design Services " SHCA Project No. 5576A

Dear Mr. Ritorto:

Swanke Hayden Connell Architects (SHCA) is pleased to submit its proposal for its architectural and engineering design services in connection with the above referenced project. These services shall include the following unless specifically modified or by the attached consultant proposals:

Scope of Work

• Draft Silverstein Request for Proposal dated 07/24/97 (Refer to the hereto attached Fee Summary dated 10/21/97forprogram areas). • OEM Program Summary dated 07/21/97. • OEM Space Design-Programmingdated 08/18/97. • DCAS/DRES Standards contained in the Guide for Design Consultant (Rev. October, 1996).

1. Field verification of existing conditions based upon as-built architectural and engineering drawings and AutoCad drawing files provided by the Landlord. 2. Attendance at Meetings. 3. Preparation of Schematic Design, Design Development and Construction Documents including coordination of engineering drawings. 4. Preparation of a complete Manifest List for all Furniture and Furniture System fNYC Requirements Contract loose furniture, casegoods and Herman Miller workstations excluding the custom millwork Operations Center workstations). 5. Review of Bids. 6. Assisting in the filing of Departmentof Building applications. 7. Construction Administration(periodic field visits/meetings,shop drawing review and preparation of an initial punchlist and final punchlist. 8. Sign-off of Controlled Inspection Forms and assist in the filing of the forms.

p -■ H.i. I iff} ‘ . Su ank»- H |«-i) I 'inrir!! X- P.-irnfr* I > ■■■ ' .r- 'A i.hf,,’ • r'-

NYC-WTC_000167249

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167249Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DCAS approval letter re: OEM consultant team, Nov 1997 · Box 7DCAS

NYC-WTC_000167244

Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.

9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗
Fax transmission log, June 1998 · Box 7DCAS

NYC-WTC_000167208

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.937

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →