NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Request for Proposals Architectural and Engineering Services
Document / 11 pages

Request for proposals: Architectural services, OEM, 1998

Machine-extracted title · confidence 95%

Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000167849–000167859

Folder label: “Request for Proposals Architectural and Engineering Services

Page image
Scanned page image, NYC-WTC_000167851
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

REQUEST FOR PROPOSALS ARCHITECTURAL AND ENGINEERING SERVICES

INTRODUCTION I ® 1 Silverstein Properties Inc. is seeking an architectural firm to perform Interior ArchitectuiX’ / Services for the Mayor’s Office of Emergency Management project. The selected firnbsbaflnave prior experience in similar type of projects and shall have its architectural license. Your firm is herewith invited to submit a proposal for undertaking the work described below.

PROJECT DESCRIPTION

The Mayor’s Office of Emergency Managemenucoordinates the overall operation of the City’s response team to emergency situations such as airplane disasters, water main breaks, explosions, etc. During non-emergency periods the Agency prepares guidelines for the handling of future emergency circumstances.

The project shall entail comprehensive interior architecture and engineering services (MEP and lighting, emergency back-up services, acoustics, telecommunications, security, code and any other consultants) for the Office of Emergency Management. This Office is to be relocated into the 7' World Trade Center building, Manhattan. One copy of the 23rd floor plan, P&E’s, and Programme are enclosed. The proposed floor is approximately,>^000 csf; another estimated 12,00^ csf will be required to house the back-up equipment. 61 Basically, the program is composed o^parts:

a) Standard office area, approx. 9,000 csf. .

b) The Emergency Command Center, approx. 14,000 csf. on a raised floor. It will require a total isolation from exterior forces during emergency situations for up to a period of two weeks.

This area includes;

- Thg'MSyor’s Suite - Tne0peirating Room with 90 work stations, and one or two media walls containing large T^^J^ns. - TheWatch Command, with 10 work stations. - The Press Room - The Radio Room - The Computer Room.

1

I NYC-WTC_000167851

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167851Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Cost estimate review request, OEM 7 WTC, June 1998 · Box 7DCAS

NYC-WTC_000173109

DCAS memo requesting clarifications and confirmations on itemized cost estimates for Mayor's Office of Emergency Management project at 7 World Trade Center floors 1, 7, and 23.

2 shared non-person entities · Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000143699 · Box DEP Box 07

Request for proposals from NYC Department of Health seeking vendors to provide live operator services for the WTC hotline.

Similar indexed content

NYC-WTC_000143715 · Box DEP Box 07

Formal request for proposals from the NYC Department of Health seeking vendors to provide live operator services for emergency hotlines.

Similar indexed content

Compare copies and versions →