NYC-WTC_000167922
Drawing detail specifying dimensions and specifications for a bullet-resistant package receiver.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Official signatory · DCAS
machine-extracted · confidence 1.00 · Check page ↗1998-09-03 – 1999-11-03
machine-extracted · confidence unavailable · Check page ↗This person appears because of their official role on the records linked below. Appearance implies nothing about anyone. Actions describe the signature or routing block on a record.
Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
Architectural elevation showing bullet-resistant package receiver, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #99 Submission, 7 World Trade Center, Oct 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #98 Submission, 7 World Trade Center, Sept 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #97 submission, 7 World Trade Center, Sept 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #096 submission, 7 World Trade Center, Nov 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #91 submission, 7 WTC, July 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #85 submission, 7 WTC, May 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #84, 7 WTC, April 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change order #83 submission, 7 WTC, April 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #78 submission, 7 WTC, April 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #77 for dam closures, 7 WTC, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #75 for UPS units, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #74 for blackout shades, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #73 for TV carts, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #71 for electrical work, 7 WTC, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #70 for plaques, 7 WTC, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #67 for computer work, 7 WTC, Feb 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #66 for floor boxes, 7 WTC, Feb 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #64 for LAN cabling, 7 WTC, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #063 memo, 7 WTC, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #62 memo, 7 WTC, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #60 memo, 7 WTC, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #57 Memo: 7 WTC Security Work, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #55, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #54 for computer equipment relocation at 7 World · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #53 for computer equipment at 7 World Trade · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #52 for electrical outlet work at 7 World · page 3machine-extracted · confidence unavailable · Check page ↗
Change Order #51 for shelving modifications at 7 World Trade · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #50 for Lutron interface work at 7 World · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #36 for generator room waterproofing, 7 World Trade · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #33, conduit extension, 7 WTC, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #28, conduit modification, 7 WTC, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #27, LAN room painting, 7 WTC, Nov · page 2machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #26R, drywall and ceilings, 7 WTC, Dec · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #26, drywall and ceilings, 7 WTC, Nov 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000168615 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #024, monitor cabling, 7 WTC, Nov 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #21 for beam and pad work, 7 World · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #19 for acoustic panel replacement, 7 World Trade · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #018, projector replacement, 7 WTC, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #16R electrical work, 7 WTC, Nov 1998 · page 3machine-extracted · confidence unavailable · Check page ↗
Change Order #16 electrical work, 7 WTC, Oct 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #12 switch installation, 7 WTC, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #11 door replacement, 7 WTC, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #8 Memo, 7 World Trade Center, Sept 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #7 Memo, 7 World Trade Center, Sept · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #93 for 7 World Trade Center electrical work, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #099 proposal for 7 World Trade Center circuits, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #35 proposal for fiber optic termination, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #054 for OEM project at 7 WTC, Jan · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #055, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #60 for Hurricane Wall Repair, 7 WTC, Jan · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for roofing change order #62, 7 WTC, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #067 submission, 7 WTC, Feb 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Memo submitting change order #096, Nov 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #096 submission, Ambassador Construction, Sep 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #069 submission for hardware, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #70 submission for plaques, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #073 submission for TV carts, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #074 submission for shade bands, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #076 for plumbing work, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Estimate from R.B. Samuels for electric work, Apr 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change order #083 for ductwork modification, 7 WTC, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #092 for 7 World Trade Center, Aug 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #091 for 7 World Trade Center Pump Installation, · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #65 submission, 7 WTC, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #23 submission, 7 WTC, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #26R submission, 7 WTC, Dec 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #34 for metal cap flashing installation, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #50 for lighting system modules, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #51 for shelving adjustments, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #016R submission, Ambassador Construction, Nov 1998 · page 3machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet with letter attachment, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet for OEM change order response, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #022 submission, Ambassador Construction, Oct 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000171916 · page 2machine-extracted · confidence unavailable · Check page ↗
Change order #025 for roof antenna support, Nov 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #028 for electrical work, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #029 for duplex outlets, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #031 for security wire installation, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #033 for conduit and grounding work, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #013 from Ambassador Construction, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #021, 7 World Trade Center, October 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #011 from Ambassador Construction, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #017 for floor boxes, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #008 for bullet resistant door installation, 7 World · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #077 memo for 7 World Trade Center modifications, · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #082 memo for blast-resistant door installation, April 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #80 for floor granite removal, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Credit change order #027, Nov 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Change order #032 submission, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #068 submission, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #072 submission, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #85, 7 World Trade Center, May 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Ambassador Construction Change Order #85, May 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Memo requesting resubmission of Change Order #81 cost, April 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #84 for TV monitors and lighting, April · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #73 for TV carts, 7 WTC OEM, Mar · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #008 for bullet-resistant door, 7 WTC, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #12: Switch upgrade, 7 WTC, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #11: Door modification, 7 WTC, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #12 for switch upgrade at 7 WTC, Oct · page 1machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #7 for fiber distribution system, 7 WTC, · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #33 for conduit extension, 7 WTC, November 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #32 for coat closet construction, 7 WTC, Nov · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #30 for concrete pad and roof work, Nov · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #29 for electrical outlets, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #28 for electrical conduit modification, 7 World Trade · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #26 for drywall and electrical work, 7 World · page 2machine-extracted · confidence unavailable · Check page ↗
Change Order #25 for microwave dish structural support, 7 World · page 2machine-extracted · confidence unavailable · Check page ↗
Change order #075 for UPS installation, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #082 for blast door installation, 7 WTC, Apr · page 2machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet for WTC OEM Job #S57-5175, Feb 25, · page 1machine-extracted · confidence unavailable · Check page ↗
Change order #074 for blackout shades, OEM 7 WTC, Mar · page 1machine-extracted · confidence unavailable · Check page ↗
Change Order #52 submission for 7 WTC OEM work, Jan · page 3machine-extracted · confidence unavailable · Check page ↗
Change Order #53 submission for 7 WTC OEM work, Jan · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167922
Drawing detail specifying dimensions and specifications for a bullet-resistant package receiver.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168376
Contractor submission for Change Order #99 to install separate electrical circuits in executive and coffee areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168378
Contractor submission for Change Order #98 to convert press room lights and install louvered fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168385
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168387
Letter submitting change order #096 for heat tracing installation on a hot water line in the generator room for $10,225.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168399
Letter from Ambassador Construction submitting change order #91 for $6,565 to remedy leakage on the 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168422
Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168428
Letter submitting change order #83 for $2,805 to modify ductwork and install recess boxes for light fixtures in the EEOC area.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168448
Contractor submits Change Order #78 for $6,629 to reinstall speakers and fire devices during ceiling tile work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168464
Submission of Change Order #75 for $4,874 to furnish and install two UPS units at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168466
Submission of Change Order #74 for $4,631 to install blackout shade bands in conference rooms at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168468
Submission of Change Order #73 for $1,580 to furnish two 44-inch TV carts for the PIU room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168481
Memo submitting Change Order #70 for $6,114 to furnish and install cast magnum plaques at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168489
Memo submitting Change Order #67 for $2,894 to furnish cords and relocate speaker strobes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168493
Memo submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168501
Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168504
Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168507
Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168513
Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168524
Memo submitting Change Order #57 for additional security work including locks and exit buttons at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168529
Memo submitting Change Order #55 for conduit repairs and electrical work at the loading dock and lobby of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168532
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168536
Memo submitting Change Order #53 for mounting computer equipment and patching cables in the lan room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168541
Memo submitting Change Order #52 for capping outlets and installing new circuits in the Commissioner's office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168546
Memo submitting Change Order #51 for adjusting shelving heights and adding units on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168549
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168585
A memo submits Change Order #36 to waterproof the generator room on the 7th floor with Dex-o-Tex at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168591
Submission of Change Order #33 for extending conduit and installing sleeves in the telco closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168599
Submission of Change Order #28 for modifying conduits to independently feed electrical panels at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168601
Submission of Credit Change Order #27 for painting the LAN room floor instead of installing VCT flooring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168605
Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168609
Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168619
Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168623
Ambassador Construction submits Change Order #022 for installing multi-mode fiber optic cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168626
Ambassador Construction submits Change Order #022R for installing multi-mode fiber optic cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168629
Change Order #21 submitted to add I-beams and concrete pads at water tank and switch gear areas on the 7th floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168633
Change Order #19 submitted to replace 36 acoustic panels on the 7th floor as requested by the architect.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168634
Ambassador Construction submits Change Order #018 to replace projectors with Sharp XG-E3500U models at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168647
Change Order #16 submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated October 15, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168658
Change Order #12 submitted by Ambassador Construction for voltmeter and ammeter installation on a 2500 amp switch at 7 World Trade Center dated October 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168660
Change Order #11 submitted by Ambassador Construction to replace a hollow metal and glass door at 7 World Trade Center dated October 1, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168666
Memo submitting revised Change Order #8 for bullet-resistant door installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168676
Memo submitting revised Credit Change Order #7 for fiber distribution system deletions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171340
Contractor submission for Change Order #93 to wire motor and switch controllers at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171345
Request to furnish and install separate electrical circuits in executive and hallway areas of the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171356
Contractor submission to terminate fiber optic cables and furnish patch panels at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171383
Change order #054 from Ambassador Construction dated January 18, 1999 for computer equipment relocation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171387
Contractor submission for change order covering conduit repairs and new wiring installation in loading dock and lobby areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171405
Memorandum submitting change order #60 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171435
Invoice from Ambassador Construction for $9,679 to complete roofing details at a new curb at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171464
Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171551
Letter submitting Change Order #096 for $10,225 to install heat tracing on the 7th floor of the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171552
Contractor letter submitting revised Change Order #096 for $10,225 to install heat tracing on the 7th floor generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171637
Ambassador Construction submits Change Order #069 for keys, roof chain, and door closer installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171643
Ambassador Construction submits Change Order #70 to install three 28-inch and two 21-inch cast magnum plaques at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171649
Ambassador Construction submits Change Order #073 to furnish two Luxor TVP44 TV carts for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171652
Ambassador Construction submits Change Order #074 to install blackout shade bands in the Mayor's conference room and another designated area.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171653
Ambassador Construction submits Change Order #076 to relocate a cold water line at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171660
Estimate from R.B. Samuels for electric trade work at 7 World Trade Center floor 23 dated April 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171674
Ambassador Construction submits Change Order #083 to modify existing ductwork at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171684
Ambassador Construction submits change order #092 for installing window film in the press room at 7 World Trade Center dated August 11, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171687
Ambassador Construction submits change order #091 for pump and drain installation to remedy leakage on the seventh floor dated July 22, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171799
Letter from Ambassador Construction submitting change order #65 for X-ray and video equipment at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171804
Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171810
Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171834
Submission of change order #34 to install a new metal cap flashing with drip return at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171866
Ambassador Construction submits Change Order #50 to install Crestron modules and resolve dimming system incompatibilities.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171870
Ambassador Construction submits Change Order #51 detailing height adjustments and unit additions to adjustable shelving units.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171907
Cover sheet for a fax transmission dated October 22, 1998, containing a letter and attachment regarding the World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171908
Facsimile transmission cover sheet from Ambassador Construction dated October 22, 1998, regarding OEM change orders.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171910
Ambassador Construction submits Change Order #022 for fiber optic installation at the Mayor's Office of Emergency Management on October 30, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171914
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171920
Quotation for structural steel supports and fireproofing required to mount microwave dishes on the World Trade Center roof in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171930
Contractor submission of change order #028 for conduit modification and wire installation at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171932
Contractor submission of change order #029 to install two duplex outlets and a switch in the training room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171939
Ambassador Construction change order #031 for installing security wire in conduits at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171955
Ambassador Construction change order #033 detailing costs for conduit extension, sleeves, outlets, and grounding.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171972
Change order submission by Ambassador Construction for framing work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171977
Construction change order for water tank and switch gear work on the 7th floor of 7 World Trade Center, totaling $20,342.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171980
Change order submission by Ambassador Construction for door modifications at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171986
Ambassador Construction submits revised change order to install combination floor boxes under the raised floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172005
Ambassador Construction details scope and cost for upgrading a door and surrounding walls to Level 3 bullet resistance.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172150
Memo submitting change order #082 to replace existing door and hardware with a blast-resistant door in the radio room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172193
Contractor submission of revised change order for removing floor granite at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172201
Letter from Ambassador Construction submitting credit change order #027 for painting work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172203
Submission of change order #032 for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172221
Letter from Ambassador Construction submitting Change Order #068 for door astragal installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172223
Letter from Ambassador Construction submitting Change Order #072 for pantry equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172231
Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172338
Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172360
DCAS official requests review and resubmission of Change Order #81 costs due to insufficient justification for the $8,228.00 amount requested.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172362
Ambassador Construction submits Credit Change Order #84 for $30,681 regarding elimination of TV monitors and installation of wall wash fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173041
Submission of Change Order #73 for the purchase of two 44-inch TV carts for the PIU room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173635
Letter from Ambassador Construction submitting Change Order #008 to upgrade a door and walls to bullet-resistant standards at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173701
Letter submitting Change Order #12 to install meters and upgrade a 2500 amp switch at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173706
Letter submitting Change Order #11 to modify door 05 from hollow metal and glass at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173712
Letter submitting change order #12 to increase the size of a 2500 amp switch and install voltmeter and ammeter equipment.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173849
Ambassador Construction submits a credit change order to reduce costs for the fiber distribution and intercom system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173860
Ambassador Construction submits Change Order #33 to extend conduits and install sleeves in the telco closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173862
Ambassador Construction submits Change Order #32 to construct a new coat closet in room 23-09 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173866
Ambassador Construction submits Change Order #30 for an 8-inch concrete pad for UPS equipment and drilling into the roof slab at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173868
A memo submits Change Order #29 for $464 to add duplex outlets and switches in a training room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173870
A memo submits Change Order #28 for $1,478 to modify conduits and install new wire for independent power feeds at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173876
A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173879
A memo submits Change Order #25 for $36,199 to install steel supports and beams for microwave dishes on the roof of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173896
Contractor submission of change order #075 to install two UPS units at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173903
Ambassador Construction submits Change Order #082 for $8,313 to replace a hollow metal door with a blast-resistant one at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173970
Transmission cover sheet from Ambassador Construction regarding work at the Mayor's Office of Emergency Management in the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173977
Change order submitted by Ambassador Construction to install blackout shade blinds and fabric for the Mayor's conference room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173991
A transmittal letter submitting Change Order #52 for $38,987 for electrical modifications in a Commissioner's office at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173996
A transmittal letter submitting Change Order #53 for $2,898 for additional electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this official's signature pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0007.
Architectural elevation showing bullet-resistant package receiver, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #99 Submission, 7 World Trade Center, Oct 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change Order #099 proposal for 7 World Trade Center circuits, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #98 Submission, 7 World Trade Center, Sept 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #97 submission, 7 World Trade Center, Sept 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #096 submission, 7 World Trade Center, Nov 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #91 submission, 7 WTC, July 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #85 submission, 7 WTC, May 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit Change Order #84, 7 WTC, April 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #83 submission, 7 WTC, April 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #78 submission, 7 WTC, April 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #77 for dam closures, 7 WTC, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #75 for UPS units, 7 WTC, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #74 for blackout shades, 7 WTC, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change Order #074 submission for shade bands, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #73 for TV carts, 7 WTC, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change Order #073 submission for TV carts, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #71 for electrical work, 7 WTC, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #70 for plaques, 7 WTC, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change Order #70 submission for plaques, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #67 for computer work, 7 WTC, Feb 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #66 for floor boxes, 7 WTC, Feb 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #64 for LAN cabling, 7 WTC, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #063 memo, 7 WTC, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #62 memo, 7 WTC, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #60 memo, 7 WTC, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #57 Memo: 7 WTC Security Work, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #55, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #54 for computer equipment relocation at 7 World · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #53 for computer equipment at 7 World Trade · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #52 for electrical outlet work at 7 World · page 3machine-extracted · confidence 1.00 · Check page ↗
Change Order #52 submission for 7 WTC OEM work, Jan · page 3machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #51 for shelving modifications at 7 World Trade · page 2machine-extracted · confidence 1.00 · Check page ↗
Change Order #50 for Lutron interface work at 7 World · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #36 for generator room waterproofing, 7 World Trade · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #33, conduit extension, 7 WTC, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #28, conduit modification, 7 WTC, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit Change Order #27, LAN room painting, 7 WTC, Nov · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Revised Change Order #26R, drywall and ceilings, 7 WTC, Dec · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #26, drywall and ceilings, 7 WTC, Nov 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000168615 · page 2machine-extracted · confidence 1.00 · Check page ↗
Revised Change Order #024R submission, Nov 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #024, monitor cabling, 7 WTC, Nov 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000171916 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #022R, fiber optic cable, 7 WTC, Oct 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #21 for beam and pad work, 7 World · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #19 for acoustic panel replacement, 7 World Trade · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #018, projector replacement, 7 WTC, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #16R electrical work, 7 WTC, Nov 1998 · page 3machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #16 electrical work, 7 WTC, Oct 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #12 switch installation, 7 WTC, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #11 door replacement, 7 WTC, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change order #011 from Ambassador Construction, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #8 Memo, 7 World Trade Center, Sept 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit Change Order #7 Memo, 7 World Trade Center, Sept · page 2machine-extracted · confidence 1.00 · Check page ↗
Credit Change Order #7 for fiber distribution system, 7 WTC, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #93 for 7 World Trade Center electrical work, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #35 proposal for fiber optic termination, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #054 for OEM project at 7 WTC, Jan · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #055, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #60 for Hurricane Wall Repair, 7 WTC, Jan · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Invoice for roofing change order #62, 7 WTC, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #067 submission, 7 WTC, Feb 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo submitting change order #096, Nov 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Change order #096 submission, Ambassador Construction, Sep 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #069 submission for hardware, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #076 for plumbing work, 7 WTC, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Estimate from R.B. Samuels for electric work, Apr 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #083 for ductwork modification, 7 WTC, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #092 for 7 World Trade Center, Aug 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #091 for 7 World Trade Center Pump Installation, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #65 submission, 7 WTC, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #23 submission, 7 WTC, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #26R submission, 7 WTC, Dec 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #34 for metal cap flashing installation, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #50 for lighting system modules, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Change Order #51 for shelving adjustments, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #016R submission, Ambassador Construction, Nov 1998 · page 3machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax cover sheet with letter attachment, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax cover sheet for OEM change order response, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #022 submission, Ambassador Construction, Oct 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #025 for roof antenna support, Nov 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #028 for electrical work, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #029 for duplex outlets, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Change Order #29 for electrical outlets, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #031 for security wire installation, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #033 for conduit and grounding work, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #013 from Ambassador Construction, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #021, 7 World Trade Center, October 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #017 for floor boxes, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #008 for bullet resistant door installation, 7 World · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #077 memo for 7 World Trade Center modifications, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #082 memo for blast-resistant door installation, April 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #80 for floor granite removal, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit change order #027, Nov 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #032 submission, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #068 submission, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #072 submission, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #85, 7 World Trade Center, May 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Ambassador Construction Change Order #85, May 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo requesting resubmission of Change Order #81 cost, April 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit Change Order #84 for TV monitors and lighting, April · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #73 for TV carts, 7 WTC OEM, Mar · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #008 for bullet-resistant door, 7 WTC, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #12: Switch upgrade, 7 WTC, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #11: Door modification, 7 WTC, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #12 for switch upgrade at 7 WTC, Oct · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #33 for conduit extension, 7 WTC, November 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #32 for coat closet construction, 7 WTC, Nov · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #30 for concrete pad and roof work, Nov · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #28 for electrical conduit modification, 7 World Trade · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #26 for drywall and electrical work, 7 World · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #25 for microwave dish structural support, 7 World · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #075 for UPS installation, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #082 for blast door installation, 7 WTC, Apr · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax cover sheet for WTC OEM Job #S57-5175, Feb 25, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change order #074 for blackout shades, OEM 7 WTC, Mar · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Change Order #53 submission for 7 WTC OEM work, Jan · page 2machine-extracted · confidence 1.00 · Check page ↗