NYC 9/11 Public Portal Document
< X<£.
AMSASSADOI^ CONSTRUCTION CO INC '
October 22, 1998
Mr, Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10048
RE: Mayor’s Office of Emergency Management
7 World Trade Center -1,7 & 23rd Floors
Change Order #021
Amb. Job.# S57-5175
Dear Mr. Weems:
We are pleased to submit herewith our change order #021 to perform the following work at the above
referenced premises for the sum of TWENTY THOUSAND THREE HUNDRED FORTY TWO DOLLARS
($20,342.00);
SCOPE OF WORK
As per Cantor Seinuk's sketches S-7.1, S-7-2 and S-23 for work at the water tank and switch gear areas
on the 7th Floor.
1. Add (5) pieces of 10x49 I beam 16' long at water storage area.
2. Remove (•1^ pieces of I beam at the switch gear area. (7VY\ei .
Cost 55,100,00
3. Add concrete pad with reinforcement at the switch gear. $2,250.00
4. Furnish and install (4) pieces of 10x49 I beam, approximately
16' long at dunnage steel. < $10,200.00?
Subtotal $17,550.00
General Conditions 1,404.00
Overhead & Fee 1,137.00
Insurance 231,00
Total
Please approve change order and return to us as soon as possible so we may proceed.
Very truly yours.
Sai :ONSy(u^lON INC.
Martin Schneider
Vice President
MS;ag
cc: Juan Mejia - SHC
Glenn Pymento - DCAS
Acce pted_________ Dated
cvwpdocs\oem[oemco2i wpd)
317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762