NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #063 Amb. Job #S57-5175
Document / 2 pages

Change Order #063 memo, 7 WTC, Jan 1999

Machine-extracted title · confidence 100%

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

NYC-WTC_000168504–000168505

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #063 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168505
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JON 29 ’99 15:39 PR OMBRSSfiDOR CONSTR. C0212 949 9762 TO 7325190 P.05/05

ambassador construction co . INC

♦Mayor’s Office of Emergency Management January 29, 1999

Page Two . .

4. As per R.B. Samuels Extra Work Order #28509; - Run cabling for Nextel as requested by OEM (John Hughes). Labor 5 hours . $479.00 Material . 31.00 $510.00

5 As per R.B. Samuels Extra Work Order #28499; - Remove and relocate Nextel repeater interfering with projection screen. Labor 2 hours - $192.00 Subtotal $1,649.00 General Conditions 132.00 Overhead & Fee 107.00 insurance 24.00 Total $1,912.00

Pfease issue to us a change order for this work which has been completed.

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Very truly yours,

AMBASSADOR CONSTRUCTION CO., INC.

Martin Schneid^ Project Manager

MS am cc: Juan Mejia/Swanke Hayden Connell Glenn Pymento/DCAS VZ1O6MCO43WPD

317 MADISON AVENUE, NEW YORK. NY 10017. 212 922 1020, FAX 212 949 9762

** TOTAL PAGE,05 **

NYC-WTC_000168505

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168505Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #63 submission, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000171444

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171444 · Box 7DCAS

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168541 · Box 7DCAS

Memo submitting Change Order #52 for capping outlets and installing new circuits in the Commissioner's office.

Similar indexed content

NYC-WTC_000173991 · Box 7DCAS

A transmittal letter submitting Change Order #52 for $38,987 for electrical modifications in a Commissioner's office at 7 World Trade Center.

Similar indexed content