← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management -1 st 7th & 23rd Floors Change Order #63
Document / 2 pages

Change Order #63 memo, 7 World Trade Center, Feb 1999

Machine-extracted title · confidence 95%

Memo submitting Change Order #63 for pipe sleeve and cable installation at 7 World Trade Center.

NYC-WTC_000168502–000168503

Folder label: “7 World Trade Center Mayor's Office of Emergency Management -1 st 7th & 23rd Floors Change Order #63

Page image
Scanned page image, NYC-WTC_000168502
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Silvorstoin Propertius. I nr: / World I rade C.ijilor Or w York i; Ml.Wf. I I’lephuiH-* b'’ i' 1'4

February 1, 1999

Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007 RE: 7 World Trade Center Mayor's Office of Emergency Management-V', 7*, & 23'^ Floors Change Order #63 Dear Mr. Pymento;

Attached please find change order #63 in the amount of $1,912.00 submitted by Ambassador Construction for the following scope of work;

1. As per Robert B. Samuel's Work Order #28501: Furnish and install one (1) pipe sleeve through hurricane wall for FD-MTD mobile terret dispatch. Run cable (FBO) also for EMS-CAD as requested by OEM (John Hughes)

Labor (2 Hours) $192.00

2. As per Robert B. Samuel's Work Order #28506: Run cat 5 cable from 23-18 to 23-50 add booster in middle of re-crimp 3-RJ45 jacks and add 110 Volt -15-Amp receptacle for booster located in A/V enclosure in OEC area. As requested by OEM John Hughes)

Labor (4 Hours) $ 383.00 Materials $ 30.00 Total $ 413.00

3. As per Robert B. Samuel's Extra Work Order #28507: Furnish and install plugmold in room 23-18 as requested by OEM.

Labor (3 Hours) $ 288.00 Materials $ 54.00 Total $ 342.00

NYC-WTC_000168502

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168502Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #63 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171442

Letter submitting Change Order #63 for $1,912 to install a pipe sleeve and cable for FD-MTD mobile terminal dispatch at 7 World Trade Center.

7 shared non-person entities · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗
Change Order #63 submission, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000171444

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change Order #063 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168504

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964

machine-extracted · confidence unavailable · Check page ↗
Change Order #64 memo, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000168499

Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room and TV server at 7 World Trade Center.

6 shared non-person entities · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171442 · Box 7DCAS

Letter submitting Change Order #63 for $1,912 to install a pipe sleeve and cable for FD-MTD mobile terminal dispatch at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171444 · Box 7DCAS

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168504 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173991 · Box 7DCAS

A transmittal letter submitting Change Order #52 for $38,987 for electrical modifications in a Commissioner's office at 7 World Trade Center.

Similar indexed content

Compare copies and versions →