TAN 29 ’99 15:39 FP AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.04/05
AMBASSADOR CONSTRUCTION CO, INC.
♦Mr. Walter Weems
Silverstein Properties, Inc.
January 29, 1999
7 World Trade Center
New York, NY 10048
Re: Mayor’s Office of Emergency Management
7 World Trade Center
1,7 and 23rd Floor
Change Order #063
Amb. Job #857-5175
Dear Mr. Weems:
We are pleased to submit herewith our change order #063 to perform the following
options at the above referenced premises for the sum of ONE THOUSAND NINE
HUNDRED TWELVE DOLLARS ($1,912 00);
1. As per R.B. Samuels Work Order #28501:
- Furnish and install one (1) pipe sleeve through hurricane
wall for FD-MTD mobile terret dispatch Run cable (FBO)
also for EMS-CAD as requested by OEM (John Hughes)
Labor 2 hours $192.00
2. As per R B Samuels Work Order #28506:
- Run cat 5 cable from 23-18 to 23-50 add booster in middle
of run re-crimp 3-RJ45 jacks and add 1 lOVolt 15Amp
receptacle for booster located in AA/ enclosure in OEC
area As requested by OEM (John Hughes).
Labor 4 hours $383.00
Material 30-00
$413.00
3. As per R B Samuels Extra Work Order #28507.
- Furnish and install plugmold in room 23-18 as requested
by OEM.
Labor 3 hours $288.00
Material 54.00
$342 00
Continued.
317 MADISON AVENUE, NEW YORK, NY 10017.212 922 1020, FAX 212 949 9762
NYC-WTC_000168504