← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #063 Amb. Job #S57-5175
Document / 2 pages

Change Order #063 memo, 7 WTC, Jan 1999

Machine-extracted title · confidence 100%

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

NYC-WTC_000168504–000168505

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #063 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168504
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TAN 29 ’99 15:39 FP AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.04/05

AMBASSADOR CONSTRUCTION CO, INC.

♦Mr. Walter Weems Silverstein Properties, Inc. January 29, 1999

7 World Trade Center New York, NY 10048

Re: Mayor’s Office of Emergency Management 7 World Trade Center 1,7 and 23rd Floor Change Order #063 Amb. Job #857-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #063 to perform the following options at the above referenced premises for the sum of ONE THOUSAND NINE HUNDRED TWELVE DOLLARS ($1,912 00);

1. As per R.B. Samuels Work Order #28501: - Furnish and install one (1) pipe sleeve through hurricane wall for FD-MTD mobile terret dispatch Run cable (FBO) also for EMS-CAD as requested by OEM (John Hughes) Labor 2 hours $192.00

2. As per R B Samuels Work Order #28506: - Run cat 5 cable from 23-18 to 23-50 add booster in middle of run re-crimp 3-RJ45 jacks and add 1 lOVolt 15Amp receptacle for booster located in AA/ enclosure in OEC area As requested by OEM (John Hughes). Labor 4 hours $383.00 Material 30-00 $413.00 3. As per R B Samuels Extra Work Order #28507. - Furnish and install plugmold in room 23-18 as requested by OEM. Labor 3 hours $288.00 Material 54.00 $342 00

Continued.

317 MADISON AVENUE, NEW YORK, NY 10017.212 922 1020, FAX 212 949 9762

NYC-WTC_000168504

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168504Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #63 submission, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000171444

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171444 · Box 7DCAS

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168541 · Box 7DCAS

Memo submitting Change Order #52 for capping outlets and installing new circuits in the Commissioner's office.

Similar indexed content

NYC-WTC_000173991 · Box 7DCAS

A transmittal letter submitting Change Order #52 for $38,987 for electrical modifications in a Commissioner's office at 7 World Trade Center.

Similar indexed content

Compare copies and versions →