Change Order #60 for Hurricane Wall Repair, 7 WTC, Jan

Machine-extracted title · confidence 95%

Memorandum submitting change order #60 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

NYC-WTC_000171405

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #060 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171405
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JAN 26 ’.99, 16:20 PR AMBASSRDOR CONSTR. C0212 949 9762 TO 6693640 P.02^03

AMBASSADOR CONSTRUCTION'CQ, INC

♦ January 26,1999

Mr. Walter Weems Silverstein Properties, InC. 7 World Trade Center New York, NY 10048

RE; Mayor’s Office of Emergency Management 7 World Trade Center 1, 7 & 23rd Floors Change Order #060 Amb.Job-#-£57-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #060 to perform the following work at the above referenced premises for the sum of EIGHT THOUSAND ONE HUNDRED FOURTEEN DOLLARS ($8,114.00);

SCOPE OF WORK As per Swanke Hayden Connell's sketch FSK-54 to close gap at steel in hurricane wall with 16 gauge steel plate. The cost is as follows:

Labor $5,500.00 Material /LSQQJDO Subtotal $7,000,00 General Conditions 560.00 Overhead & Fee 454.00 Insurance lOQjQO Total $8,114.00

Please advise if you wish for us to proceed with this work.

Very tfOly yours,

F CO«ST^CTJ INC-

Martin Schrrei^r Vice President

MS;ag cc: Juan Mejia - SHC Glenn Pymento - DCAS

Accepted;_______ Dated: c:Wipdocs\oeni\cosioemcoso.wpd]

317 MADISON AVENUE, NEW YORK. NY 10017,212 922 1020, FAX 212 949 9762

NYC-WTC_000171405

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171405Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #80, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168434

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
Change Order #23 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171804

Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗
Change Order #62 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168507

Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.954

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168622 · Box 7DCAS

Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.

Similar indexed content

NYC-WTC_000168434 · Box 7DCAS

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

Similar indexed content

NYC-WTC_000172211 · Box 7DCAS

Submission of change order to waterproof the generator room on the 7th floor using Dex-o-Tex flooring.

Similar indexed content

NYC-WTC_000168501 · Box 7DCAS

Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.

Similar indexed content

Compare copies and versions →