← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #064 Amb. Job # S57-5175
Document / 1 page

Change Order #64 for LAN cabling, 7 WTC, Feb 1999

Machine-extracted title · confidence 95%

Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.

NYC-WTC_000168501

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #064 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000168501
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEB 01 ’99 09=09 FR RMBRSSfiDOP C0N5TR. C0212 949 9762 TO 7325190 P.09/13

AMBASSADOR CONSTRUCTION CO, INC

Janua7 29, 1999

Mr Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE: Mayor's Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floor Change Order #064 Amb. Job #557-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #064 to perform the following work at the above referenced premises for the sum of SEVEN THOUSAND ONE HUNDRED FOURTEEN DOLLARS ($7,114.00):

SCOPE OF WORK 1. As per R.B. Samuels' extra work order #28500 (attached), provide manpower to patch cables in LAN room and TV set server as per Computer Horizons

Labor (9) hours x $95.80 - $862.00

2 As per R.B Samuels' extra work order #28495 (attached), labor for cable installation and patching of same as requested by Computer Horizons

Labor (24) hours (standard time) x $95.80 = $2,299.00 Labor (16) hours (overtime) x $138.35 = 2,214.00 Material Ze2JQ Subtotal $6,137.00 General Conditions 491 00 Overhead & Fee 398.00 Insurance aa no Total $7,114.00

Please issue to us a change order for this work which has been completed.

Vei 'Ours, r

COI INC

Martin schneide/ Vice President

MS:ag cc: Juan Mejia - SHC Glenn Pymento - DCAS

Accepted:___________ Dated: e:\wp<)ocstoeniic<»(oernco64.wpd] 317MADISON AVENUE. NEW YORK, NY 10017. 212922 1020, FAX2129499762

NYC-WTC_000168501

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168501Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #64 submission, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000171448

Ambassador Construction letter dated January 29, 1999, submitting Change Order #64 for $7,114 to patch cables and install wiring at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗
Change Order #058 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168521

Memo from Ambassador Construction submitting Change Order #058 for $5,506 to remove computers from the PIU room and perform LAN patching at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.967

machine-extracted · confidence unavailable · Check page ↗
Change Order #62 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168507

Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change Order #23 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171804

Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change order #102 cover letter, Oct 29 1999 · Box 7DCAS

NYC-WTC_000171585

Ambassador Construction cover letter dated October 29, 1999 submitting change order #102 for data box and outlet installation at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171448 · Box 7DCAS

Ambassador Construction letter dated January 29, 1999, submitting Change Order #64 for $7,114 to patch cables and install wiring at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171340 · Box 7DCAS

Contractor submission for Change Order #93 to wire motor and switch controllers at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000168521 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #058 for $5,506 to remove computers from the PIU room and perform LAN patching at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173868 · Box 7DCAS

A memo submits Change Order #29 for $464 to add duplex outlets and switches in a training room at 7 World Trade Center.

Similar indexed content

Compare copies and versions →