NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 World Trade Center Mayor's Office cf Emergency Management 1st 7th & 23rd Floors Change Order #64 Amb. Job # S57-5175
Document / 1 page

Change Order #64 submission, 7 WTC, Jan 1999

Machine-extracted title · confidence 95%

Ambassador Construction letter dated January 29, 1999, submitting Change Order #64 for $7,114 to patch cables and install wiring at 7 World Trade Center.

NYC-WTC_000171448

Folder label: “7 World Trade Center Mayor's Office cf Emergency Management 1st 7th & 23rd Floors Change Order #64 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171448
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEB 01 ’99 12=51 PR mBASSRDOR CONSTR. C0212 949 9762 TO 6693640 P.04/04

AMBASSADOR CONSTRUCTION CQ. ING

January 29,1999

Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York. NY 10048

RE; Mayor's Office of Emergency Management 7 World Trade Center - 1. 7 & 23rd Floor Change Order #064 Amb. Job #557-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #064 to perform the following work at the above referenced premises for the sum of SEVEN THOUSAND ONE HUNDRED FOURTEEN DOLLARS ($7,114.00):

SCOPE OF WORK 1. As per R.B. Samuels’ extra work order #28500 (attached), provide manpower to patch cables in LAN room and TV set server as per Computer Horizons.

Labor (9) hours x $95.80 - $862.00 Yf

2. As per R.S. Samuels' extra work order #26495 (attached), labor for cable iostallatioh and patching of sama as requested by Computer Horizons.

Labor (24) hours (standard time) x $95.80 = $2,299.00 ' ' Labor (16) hours (overtime) x $138.35 = 2,214.00 I Material 76?Q0v/

Subtotal $6,137.00 General Conditions 491.00 Overhead & Fee 398.00 Insurance Total $7,114.00 / JI

Ptease issue to us a change order for this work which has been completed.

Vt 'ours, r

CON3TOU Martin ^neideif Vice President

MS:ag ce: Juan Mejia - SHC Glenn Pymento - DCAS

Accepted:___________ Dated: ciiwpdocsviainvwstDemcoM.wpai 317 MADISON AVENUE. NEW YORK, NY 10017.212 922 1020, FAX 212 949 9762

TATrsi onnc QzI

NYC-WTC_000171448

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171448Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #058 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168521

Memo from Ambassador Construction submitting Change Order #058 for $5,506 to remove computers from the PIU room and perform LAN patching at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗
Change Order #23 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171804

Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168501 · Box 7DCAS

Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168622 · Box 7DCAS

Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.

Similar indexed content

NYC-WTC_000171340 · Box 7DCAS

Contractor submission for Change Order #93 to wire motor and switch controllers at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →