← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #085 Amb. Job#57-5175
Document / 2 pages

Ambassador Construction Change Order #85, May 1999

Machine-extracted title · confidence 95%

Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.

NYC-WTC_000172338–000172339

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #085 Amb. Job#57-5175

Page image
Scanned page image, NYC-WTC_000172339
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mr. Walter Weems May 6, 1999

Page Two. ..

Painting - Repaint block walls where doors where moved$550.00

Electric - Relocate two (2) light fixtures in garbage storage room. Relocate two (2) elevator intercoms. Relocate two (2) sets of elevator pit lights. Relocate two (2) duplex outlets and relocate four (4) one inch conduits. $4,700.00

Elevator - Relocate two (2) sets of elevator stop buttons $5,029.00

HVAC - Provide five (5) 90 degree turns in fuel oil piping. $13,305.00 Subtotal $29,679.00 General Conditions 2,374.00 Overhead & Fee 1,923.00 Insurance ____425.00 Total $34,401.00

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Please sign one copy of this letter and return it to our office for our records.

If you have any questions please do not hesitate to contact us.

Very truly yours, AMBASSADOR CONSTRUCTION CO., INC.

Martin Schneider Vice President

cc: Juan Mejia - SHC Glenn Pymento - DCAS Accepted:____________ Dated: 1 fl AMBASSADOR CONSTRUCTION CO., INC.

NYC-WTC_000172339

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172339Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #85 submission, 7 WTC, May 1999 · Box 7DCAS

NYC-WTC_000168422

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999

machine-extracted · confidence unavailable · Check page ↗
Change Order #26R submission, 7 WTC, Dec 1998 · Box 7DCAS

NYC-WTC_000171810

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change order #109 cover letter, Jan 7 2000 · Box 7DCAS

NYC-WTC_000171564

Ambassador Construction cover letter dated January 7, 2000 submitting change order #109 for door lock and electrical work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.960

machine-extracted · confidence unavailable · Check page ↗
Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Jan 2000 · Box 7DCAS

NYC-WTC_000168349

Letter submitting change order #109 for door lock repairs and electrical installations at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168422 · Box 7DCAS

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

Similar indexed content

NYC-WTC_000172231 · Box 7DCAS

Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172365 · Box 7DCAS

Ambassador Construction submits Change Order #85 for $34,401 to adjust fuel-oil line routing in elevator pits at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171810 · Box 7DCAS

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000168605 · Box 7DCAS

Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →