NYC 9/11 Public Portal Document

JUN H 1999.12:55 PR AMBASSADOR CON. . . TO.6.693640 P.02/03

i Ambassador construction co., inc. I i ! J June 10, 1999 I

Mr;. Walter Weems Silverstein Properties Inc. 7 World Trade Center Nejw York, NY 10048

Re: Mayor's Office of Emergency Management ; 7 World Trade Center i Change Order #038 I Amb.Job #SS7-S17S i i D0ar Mr. Weems; i are pleased to submit herewith our change order #088 to perform the following work at th# above referenced premises for the sum of ONE HUNDRED TWENPf THOUSAND NI^E HUNDRED FIFTY SEVEN DOLLARS ($120,957.00):

have carefully Surveyed the new fuel Oil piping route as per the following:

* ’ The eight inch conduit which will carry the 1 1/4" supply, return and overflow pipe, will j run through the second floor machine room corridor into the building communications room and above the lobby ceiling to the fuel oil tank room.

• J In order for this work to be done, building ductwork must be removed and re-routed. i Also other electrical piping will have to be relocated. The double door for the , communications room will be removed and replaced by a single door.

• i The ceiling lobby sheetrock ceiling will be removed and replaced after the piping is J installed. I

• j The lobby area in front of the handicap elevators will have scaffolding so the different trades can work while we keep the elevators operational.

• j All work is to be performed on normal working hours, except for the scaffolding work. j There is no overtime included in the other costs. ( i ! Continued...

317 ^^ADlSON AVENUE ■ NEW YORK, NY 10017 ■ 2i2 922 1020 - FAX 212 949 9762

NYC-WTC_000171741

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171741Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.986

machine-extracted · confidence unavailable · Check page ↗
Change Order #85 submission, 7 WTC, May 1999 · Box 7DCAS

NYC-WTC_000168422

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
Change Order #26R submission, 7 WTC, Dec 1998 · Box 7DCAS

NYC-WTC_000171810

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168409 · Box 7DCAS

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000172231 · Box 7DCAS

Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168422 · Box 7DCAS

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

Similar indexed content

NYC-WTC_000172338 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000172365 · Box 7DCAS

Ambassador Construction submits Change Order #85 for $34,401 to adjust fuel-oil line routing in elevator pits at 7 World Trade Center.

Similar indexed content

Compare copies and versions →