machine-extracted · confidence unavailable · Check page ↗Change Order #024, monitor cabling, 7 WTC, Nov 1998
Machine-extracted title · confidence 50%Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.
NYC-WTC_000168619–000168620Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024 Amb. Job #S57-5175”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document NOU 03 ’98 15.-32 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.03/03
AMBASSADOR CONSTRUCTION CO. INC.
♦Mr Walter Weems November 3, 1998
Page Two...
We trust the above meets with your approval and we look forward to the continued pleasure of serving you.
Please sign one copy of this letter and return it to our office for our records
If you have any questions, please do not hesitate to contact us.
Very truly yours,
AM^SSADOR CONSTRUCTION CO., INC
Martin Schneider Vice President
MS.am cc: Juan Mejia - SHC Glenn Pymento - DCAS Peter Stern - Shem Mllson
Accepted Dated
** TOTAL PAGE.03 **
NYC-WTC_000168620
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171914
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168489
Memo submitting Change Order #67 for $2,894 to furnish cords and relocate speaker strobes at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168549
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171464
Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171889
Ambassador Construction submits Change Order #039 for USM furniture and plates at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168552
Memo submitting Change Order #49 to provide ceiling tiles and relocate sprinkler heads in the press room.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171882
Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174002
A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171359
Technical specifications for installing fiber optic and UTP cable backbones between LAN rooms at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168558
Ambassador Construction submits Change Order #47 to furnish stainless steel flexes for generators at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
Similar indexed content
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
Similar indexed content
Memo submitting Change Order #67 for $2,894 to furnish cords and relocate speaker strobes at 7 World Trade Center.
Similar indexed content
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
Similar indexed content