Change Order #024, monitor cabling, 7 WTC, Nov 1998

Machine-extracted title · confidence 50%

Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.

NYC-WTC_000168619–000168620

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168619
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOU 03 ’99 15.- 31 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/03

AMBASSADOR CONSTRUCTION CO., INC

♦ Mr. Waiter Weems Silverstein Properties, Inc, Novembers, 1998

7 World Trade Center New York, NY 10048

RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #024 Amb.Joh #357-5175

Dear Mr. Weems;

We are pleased to submit herew/ith our change order #024 to perform the following work at the above referenced premises for the sum of TWENTY THREE THOUSAND SIX HUNDRED ELEVEN DOLLARS ($23,611.00).

SCOPE OF WORK The below items are to control all sixty (60) Monitors and four (4) LCD Video Projectors in the EOC and Watch Command. Run cable to each monitor and LCD projectors Ace to install cabling and IR sensors to each monitors and projectors Provide additional control programming. Functions to include power on / off. Input select and volume up / down from Crestron touch panel. • Furnish and install; - Six (6) Creston CNlR-8 IR Serial Port $3,504.00 - One (1) Creston ST-VC 3 Channel Volume Control 584 00 - Five (5) Creston ST-COM RS232/422 Interface 2,920.00 - Five (5) Creston ST-RMK Rack Mount kit 580 00 - Sixty (60) Creston IR Emitter 780.00 - 8000 feet Belden Control Cable Plenum Cable 2,950.00 - One (1) Engineering, Drafting and Pre-install 1,600.00 - One (1) miscellaneous hardware 867.00 - One (1) Local 3 installation and termination of cables 3,200.00 - One (1) Creston Programming changes 2,250.00 - Shipping 385 00 • Miscellaneous patching 750.00 Subtotal $20,370.00 General Conditions 1,630.00 Overhead and Fee 1,320.00 Insurance 291.00 Total $23,611.00

317 MADISON AVENUE. NEW YORK, NY 10017. 212 922 1020. FAX 212 949 9762

NYC-WTC_000168619

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168619Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Credit Change Order #84, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168425

Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974

machine-extracted · confidence unavailable · Check page ↗
Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171464

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗
Memo submitting Change Order #039, Dec 1998 · Box 7DCAS

NYC-WTC_000171889

Ambassador Construction submits Change Order #039 for USM furniture and plates at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168425 · Box 7DCAS

Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000171914 · Box 7DCAS

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

Similar indexed content

NYC-WTC_000168489 · Box 7DCAS

Memo submitting Change Order #67 for $2,894 to furnish cords and relocate speaker strobes at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168549 · Box 7DCAS

Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.

Similar indexed content

Compare copies and versions →