3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗Revised Change Order #024R submission, Nov 1998
Machine-extracted title · confidence 95%Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
NYC-WTC_000171914–000171915Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024R Amb. Job #S57-5175”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NOW 17 ’98 16=09 PR PtlBASSADOR C0N5TP. C0212 949 9762 TO 6694107 P.34/36
II!
AMBASSADOR CONSTRUCTION CO.. INC
♦ Novembers, 1998
Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048
RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #024R AmhL_aQh.#.S5Z±5175
Dear Mr. Weems:
We are pleased to submit herewith our revised change order #024R to perform the following work at the above referenced premises for the sum of THREE THOUSAND ONE DOLLARS ($3,001.00):
SCOPE OF WORK
To furnish and install the new switches to control monitors in EOC. as follows:
- Eighteen (18) low voltage switches $612.00 - Forty (40) D-sub mini conductors $560.00 - One (1) installation and termination $1,167.00 - One (1) Miscellaneous cable and hardware __ $2.5.(100 Subtotal $2,589.00 General Conditions 207.00 Overhead and Fee 168.00 Insurance ____ 3ZJ3Q Total $3,001.00
We trust the above meets with your approval and we look forward to the continued pleasure of serving you.
Continued..,
317MADISON AVENUE. NEW YORK, NY 10017. 212922 1020, FAX212949 9762 NOU-17-1998 16=04 212 949 9762 98X P.34
NYC-WTC_000171914
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168561
Ambassador Construction submits Change Order #46 to provide power supply and security equipment circuits at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172216
Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168573
Ambassador Construction submits Change Order #41 to install revised antenna support details at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168558
Ambassador Construction submits Change Order #47 to furnish stainless steel flexes for generators at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168552
Memo submitting Change Order #49 to provide ceiling tiles and relocate sprinkler heads in the press room.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171882
Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168448
Contractor submits Change Order #78 for $6,629 to reinstall speakers and fire devices during ceiling tile work.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174002
A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168532
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Similar indexed content
Ambassador Construction submits Change Order #46 to provide power supply and security equipment circuits at 7 World Trade Center.
Similar indexed content
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
Similar indexed content
Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.
Similar indexed content