NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024 Amb. Job #S57-5175
Document / 2 pages

Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024 Amb. Job #S57-5175

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000171916–000171917
Page image
Scanned page image, NYC-WTC_000171916
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NQU 03 ’98 PR 9MBfiSSPD0R CONSTR. C0212 949 9762 TO 6694107 P,02/03 » t * .

AMBASSADOR CONSTRUCTION CO, INC.

November 3, 1998 Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors . Change Order #024 X Amb..Job-#S57„-5125 /

Dear Mr. Weems;

We are pleased to submit herewitl^ur change order #0: to perform the following work at the above referenced pi^ises for the sum of iNTY THREE THOUSAND SIX HUNDRED ELEVEN DO^RS ($23,611.00): /

SCOPE OF WORK / / The below items are to/ontrol all sixty (60) h^itors and four (4) LCD Video Projectors in the EOC^nd Watch Command. Run cable to each monitor and LCD projectors. Ace to^tall cabling and IR sensors to each monitors and projectors. Provide addition^control programming; Functions to include power on / off, Input select and vol^e up / down from Crestron touch panel. • Axnish/nd install: / - Sj^^feOpCreston CNIR-84H Serial Port $3,504.00' - 0ne (1)Y?reston ST-VC 3 Channel Volume Conti)>K’ 584.00 ' Five (5) Creston'STO^ RS232/422 Interface 2,920.00 ' - Five (5) Creston ^-RMRORaQk Mounp«t 580.00, - Sixty (60) Crest/n IR Emitter 780.00 - 8000 feet BeWen Control C^bl<Plenufrr<IgNe 2,950.00 V - One (1) Engineering, Draffing and Pre-instan"^-^^ 1,600.00 - One (1) miscellan^ods hardware 867.00^' - One (1) Local JYnstallation and termination of cables ■^<3^0.00r - One (ijpre^on Programming changes 2^2W10 -Shipping 385.00^^ Misceftaneous patching .....750.0.0 Subtotal $20,370.00 General Conditions 1,630.00 Overhead and Fee 1,320.00 Insurance ___ 29J.00 Total $23,6d4Tfnr

317 MADISON AVENUE, NEW YORK. NY 10017,212 922 1020, FAX 212 949 9762

NOU-03-1998 15:47 212 949 9762 98X P.02

NYC-WTC_000171916

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171916Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981

machine-extracted · confidence unavailable · Check page ↗
Credit Change Order #84, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168425

Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168619 · Box 7DCAS

Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.

Filed in the same folder

NYC-WTC_000171914 · Box 7DCAS

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

Similar indexed content

NYC-WTC_000168425 · Box 7DCAS

Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000171882 · Box 7DCAS

Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.

Similar indexed content

Compare copies and versions →