Ambassador Construction electrician estimate fax, Nov 1998 · page 1NYC-WTC_000171826
Fax page containing an electrical subcontractor estimate form dated November 11, 1998 for work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction electrician estimate fax, Nov 1998 · page 1NYC-WTC_000171827
Fax page containing an electrical subcontractor estimate form dated November 12, 1998 for work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Waterproofing specification for concrete curbs, Sept 1998 · page 1NYC-WTC_000171835
Letter specifying protective measures for existing Kemperol membrane before pouring new concrete curbs at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Waterproofing specification for concrete curbs, Sept 1998 · page 2NYC-WTC_000171835
Letter specifying protective measures for existing Kemperol membrane before pouring new concrete curbs at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Waterproofing specification for concrete curbs, Sept 1998 · page 3NYC-WTC_000171835
Letter specifying protective measures for existing Kemperol membrane before pouring new concrete curbs at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Extra work estimate for floor drain installation at 7 WTC, · page 1NYC-WTC_000171846
Estimate for furnishing and installing three floor drains at 7 World Trade Center, including overtime costs.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding first floor rebar restoration requirements, Dec 1998 · page 1NYC-WTC_000171851
Technical directive requiring cut rebars on the first floor slab to be restored via overlap weld or cadweld device for structural integrity.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo forwarding rebar restoration instructions, Dec 1998 · page 1NYC-WTC_000171852
Cover memo forwarding technical instructions regarding rebar restoration at the ground floor of the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo on first floor rebar restoration via welding, Dec 1998 · page 1NYC-WTC_000171853
Technical directive requiring cut rebars to be restored with a minimum 3-inch overlap weld or cadweld device.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo authorizing RG-6U cable pulls to multiple rooms, Dec 1998 · page 1NYC-WTC_000171861
Authorization for electricians to pull fifteen RG-6U cable lines from telephone closet A to various rooms on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo summarizing Change Order #51 cost changes, Jan 1999 · page 3NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for OEM project documents, Jan 1999 · page 1NYC-WTC_000171878
Cover sheet for a fax transmission containing project documents related to the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization #5576CH, Nov 1998 · page 1NYC-WTC_000171895
DCAS authorizes scope revisions for the Mayor's Office of Emergency Management at 7 World Trade Center on November 6, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical work quotation, 7 WTC, October 1998 · page 1NYC-WTC_000171900
Quotation for electrical modifications including panel relocation, transformer work, dishwasher connection, and fire alarm.
Citywide Administrative Services, Dept. of · Box 7DCAS
Response regarding OEM CO #016 panel approval status, Oct 1998 · page 1NYC-WTC_000171909
Contractor correspondence stating that electrical panels were approved without notation but work remains unexecuted as of October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order Request #025, Newco Iron Works, Nov 1998 · page 1NYC-WTC_000171922
Newco Iron Works submits a Change Order Request for structural steel supports at the Mayor's Office of Emergency Management on November 2, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding penthouse siding modification, Nov 1998 · page 1NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical subcontractor estimate for 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000171931
Estimate from an electrical subcontractor detailing work scope and pricing for the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #029 for duplex outlets, 7 World Trade Center, · page 1NYC-WTC_000171932
Contractor submission of change order #029 to install two duplex outlets and a switch in the training room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical subcontractor estimate for 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000171933
Estimate from an electrical subcontractor outlining work included, exclusions, and remarks for the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical subcontractor estimate for 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000171940
Estimate from an electrical subcontractor detailing work scope and pricing for the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical estimate by R.B. Samuels for 7 World Trade Center, · page 1NYC-WTC_000171942
Estimate from electrical subcontractor R.B. Samuels dated November 12, 1998, prepared for Martin Schneider.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fiber optic specifications for 7 World Trade Center, Nov 1998 · page 4NYC-WTC_000171944
Technical specification document for sensing and data fiber features at the 7 World Trade Center facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electrical subcontractor estimate for 7 World Trade Center, Nov 1998 · page 1NYC-WTC_000171956
Estimate from an electrical subcontractor detailing work scope and pricing for the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction electric estimate, 7 WTC, Nov 1998 · page 1NYC-WTC_000171958
Estimate for electrical work at 7 World Trade Center prepared by Ambassador Construction Company.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #012 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171968
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #013 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171972
Change order submission by Ambassador Construction for framing work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for OEM change order #20, Oct 1998 · page 1NYC-WTC_000171974
Facsimile transmission cover sheet from Ambassador Construction Co. regarding change order #20 for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000171987
Authorization form issued to proceed with revised scope of services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment Request #2 for lease, 7 WTC, Sept 1998 · page 1NYC-WTC_000171989
Certified mail requesting payment of $3,500,000 under the lease agreement for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project 96-1346 construction cost estimates memorandum, July 1998 · page 2NYC-WTC_000171990
DCAS memorandum regarding construction cost estimates for Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter revising approved alteration costs, 7 World Trade Center, Aug · page 2NYC-WTC_000171993
DCAS correspondence revises the approved cost for specific alteration items at the Mayor's Office of Emergency Management floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000172010
Authorization form issued to proceed with revised scope of services and expense reporting for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #9 explanation, 7 WTC, Sep 1998 · page 1NYC-WTC_000172013
Memo explaining Change Order #9 for the Mayor's Office of Emergency Management at 7 World Trade Center dated September 17, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM construction budget accounting, 7 World Trade Center, Sep 1998 · page 1NYC-WTC_000172019
Financial report detailing the project budget, approved change orders, and projected costs for Office of Emergency Management renovations.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM construction budget summary, 7 World Trade Center, Sep 1998 · page 1NYC-WTC_000172033
Summary of the Office of Emergency Management construction budget including approved change orders and remaining funds.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project cost accounting summary, 7 WTC OEM, Sep 1998 · page 1NYC-WTC_000172053
Summary of project costs, budget reductions, and approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment Request for lease, 7 WTC, July 1998 · page 1NYC-WTC_000172107
Certified mail requesting payment of $7,000,000 under the lease agreement for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter regarding cost approval and reconsideration, July 8, 1998 · page 2NYC-WTC_000172113
DCAS letter referencing a $12.8 million cost approval and requesting reconsideration of item #8.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS response to clarifications, 7 WTC, June 2, 1998 · page 2NYC-WTC_000172121
DCAS letter responding to contractor's clarifications regarding the Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposal revision notice, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172127
Contractor notifies of a $34,475 increase to the proposal due to revised quotes from visual trade contractors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electricity requirements plan review, 7 WTC, June 1998 · page 1NYC-WTC_000172128
Memo enclosing documents governing electricity requirements and a copy of the plan review for OEM at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Electricity requirements plan review, 7 WTC, June 1998 · page 2NYC-WTC_000172128
Memo enclosing documents governing electricity requirements and a copy of the plan review for OEM at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 2NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 3NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Job memorandum regarding emergency pump testing at 7 World Trade · page 3NYC-WTC_000172155
Memorandum detailing emergency domestic transfer pump tests and noting control problems requiring corrective measures for the 7th floor storage tank.
Citywide Administrative Services, Dept. of · Box 7DCAS
Product specification sheet for fuel oil room access hatch, March · page 1NYC-WTC_000172165
Document excerpt listing specifications for a fuel oil room access hatch and referencing a self-closing modification memo.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architect memorandum regarding fuel oil room inspection request, March 2000 · page 1NYC-WTC_000172168
Memorandum confirming contact with vendors to produce wiring diagrams and pricing for modifying the fuel oil tank room hatch.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: overhead cabling reorganization at 7 World Trade Center, · page 1NYC-WTC_000172171
A January 14, 2000 memo regarding the reorganization of overhead cabling and reimbursement disputes for work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS