SEP 30 -99 16:27 AMBASSADOR CONSTR. C0212 949 9762 TO 7325190
P.02/02
AMBASSADOR CONSTRUCTION CO , INC.
September 30,1999
Mr. Walter Weems
Silverstein Properties Inc
7 World Trade Center
New York, NY 10048
Re; Mayor’s Office of Emergency Management
7 World Trade Center
Change Order #098
Amb. Job#SSI-5175
Dear Mr, Weems:
We are (leased to submit herewith our change order #098 to perform the following work at
the above referenced premises for the sum of NINE THOUSAND NINETY TWO
DOLLARS ($9,092.00);
1. Convert three (3) lights in press room to hard wired
switch leg and eliminate plug in feed to hard wired feed $975.00
2 Same as above but five (5) lights and mount on kindoff
support across fascia, convert to switches. $1,675.00
3 Furnish and install louvered strip fixtures at back of
press room area and connect to switch. $1,800.00
4. Install 3 “Blue" lights outside Mayor's conference
room run to switch in press room. $2,375.00
5. Patch and paint for all work $1,000.00
Subtotal $7,825.00
General Conditions 626.00
Overhead & Fee 507 00
Insurance 134.0a
Total $1
All work to be performed on regular working hours Blue lights ftimished by OEM '
iy yobrs.
ADORC ^O.. INC.
Martin Schndrai
Vice President
cc; Juan Mejia / SHC
Glenn Pymento / DCAS
MS;am
Accepted;________________ Dated;
C \0rn«\VW>WWVW«*3CSO6MCaS«EMC08B WPO
317 MADtSON AVENUE • NEW YORK, NY 10017 • 212 922 1020 • FAX 212 949 9762
** total page.02 **
NYC-WTC_000171328
OCR can misread numbers and units. Confirm readings against the page image before using them.