NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
1 shared non-person entities · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗Letter specifying protective measures for existing Kemperol membrane before pouring new concrete curbs at the Office of Emergency Management.
NYC-WTC_000171835–000171839Folder label: “OEM Radio Equipment Room 7 World Trade Center, NY, NY”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NO'J 13 ’98 1'5:04 PR ftMBPSSftOOR CONSTR. .C0212 949 9762 TO 6191196 P.02/05 SWANKB HAroEN CO/WBLL 0002/005
, ter Pnf^Mwtai in fiMInf WtnfproafinO
KBIMm SI Via Fax (212) 219-0059 & Regular Mail
Septombtr 12,1998
Mr. Juan M. Mejia, AlA Swankc Hayden Connell & Partners LLP 295 Lafayette Street New York, NY 10012
Re; OEM Radio Equipment Room 7 World Trade Center, NY, NY
Dear Jaun;
As discussed, the new concrete curbs for the above project may be poured directly on the existing Kemperol membrane. Before pouring the new concrete, the existing mambrane must be protected from alkalinity in the cement by applying two (2) coats of Primer D (@ 0.0-1.0 gaIZlOO SF) and broadcasting kiln-dried silica sand into second wet coat of primer. The above protective measures are mandatory in ail areas where concrete is to be placed over Kemperol waterproofing membrane. In addition, care should be taken to clean adjacent areas of Kemperol with continuous water and brush (high-pressure water if necessary) to eliminate settlement of concrete residues on membrane. Once installed, the new concrete curbs may be flashed with one of the attached details. Detail "0-1" shows a metal/Kemperol membrane composite flashing used to flash the new concrete curbs while the concrete is still green Detail ''D-2" would be used to flash the curbs after the concrete has completely cured As discussed, detail "D-2" would require a bead of polyurethane sealant applied between the bottom edge of the concrete curb and existing Kemperol membrane to form a temporary water seal. Then, after the new concrete cures (with a maximum 5% moisture content), the Kemperol membrane fleshing could be installed.
Both flashing details require a tie-in of the naw Kemperol membrane onto the existing Kemperol field membrane. To accomplish this, the sand aggregate surfacing must be completely removed from the surface of the existing in-place membrane. The area of sand aggregate removed should be approximately 6" wide to accommodate the new flashing. After removing the aggregate, the top surface of the mambrane must be thoroughly cleaned with toluene or acetone. After the solvent has been allowed time to
KEMPER SYSTEMS. INC . E**i C«a« Oh«« 1182 T«»n»cW Roao, Sult* 308. nj 0/880 KL; COD 8SJ-M98 PAX. (301) d30-8<22 E-MAIl.; Kempef.ysieaol.epm
Id Hef0I :Se 8661 ST 'OON t»96^iP£E^6 : -ON 3N0Hd _WgiSAS ii3dW=W-N0«ndn '^'<3 NOV IJ 1998 14:34 2122190256 Pf^GE.02
NYC-WTC_000171835
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
1 shared non-person entities · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
3 shared non-person entities · Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
2 shared non-person entities · Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111649
Automated transmission confirmation from DEP regarding WTC site activities dated November 14, 2002.
Similar document embedding; no shared entity or topic indexed. · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114019
Letter and chain of custody document tracking HVAC and environmental inspection samples from 333 Rector Place.
1 shared non-person entities · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122946
Application form from Benjamin Kurzban & Son Control Inc. to the DEP regarding contract REM-ROF2 at 182 Broadway.
Similar document embedding; no shared entity or topic indexed. · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102076
Facsimile transmission cover sheet dated July 17, 2002, likely related to environmental or inspection matters at 15 Maiden Lane.
Similar document embedding; no shared entity or topic indexed. · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143306
Fragmented text containing illegible handwriting and partial words related to environmental or safety topics.
1 shared non-person entities · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000171438
Correspondence detailing mandatory protective measures for Kemperol membrane before pouring new concrete curbs.
Filed in the same folder
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Similar indexed content
NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
Similar indexed content
NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.