NOV 23 -SB CONSTR.- C0212 EMS 9762 TO 7325190
P.02Z03
AMBASSADOR CONSTRUCTION CO, INC
Mr.Walter Weems
November 13,1998
Page Two .
6) Additional switching room 2330, included new and
relocated wiring
Electrical Cost $ 640.00
7) Per drawing E4-02 dated 9/25/98: (DELETED)
A Add one (1) 200amp 3 pole and one (1) 70amp 3 pole breaker in EDPL-23E.
B. Delete one (1) 3 pole lOOamp breaker in EDPL-23E
C. Revise panel UI-P-23W and ULP-R from 3 phase 4 wire to 1 phase three wire.
D Add one (1) 50amp 2 pole breaker in panel ELP-23C1.
E. Delete two (2) 15amp 1 pole breakers in panel ELP-23C1.
Afi panels have been delivered and installed with the branch circuitry and feedcirs. Panel
EDPL23-E will have to be replaced in its entirety. All branch and feeder wiring will be
removed and then re-installed Panel ULP23W & R will also have to be replaced. New panels
will be provided and re-installed. New breakers will be installed for panel ELP-23C-1.
This above work has been changed by Cosentini’s sketches FSK-2, 3,4, 7 and 9 as per the
following wiring changes and fusing changes;
- Re-route eight (8) 1-pole circuits from ELP 23C to ELP 23C1
and add one (1) 3-pote 100A CB to ELP 23C
- EDPL-23E - Add one (1) 3-pole 70A CB
- ELP - 23W- Delete three (3) one pole 15 A CB’s and one (1)
3-pole 70 A CB
- Change wiring for UPS s from 2#1. 2 #2 and 1 #250 MCM to 3 #4.
1 #2/0 and 2 #4,
- ELP R - Delete three (3) 1-pole 15 A CB’s
- ELP R - Add one (1) 3-pole 50A and one (1) 3-pole 70A
- Downsize fusing in feeder disconnect from 160A to 70A.
- As per FSK-8 add one (1) speaker/strobe
Electrical Cost ..$3,800,00
Subtotal Electrical Cost $17.065 00
Additional Cut and Patch . 1.500.00
Subtotal $18,565.00
General Conditions 1.485.00
Overhead and Fee 1,203.00
Insurance 266.0.0
Total 21,519.00
Forward...