NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Revised Change Order #16R
Document / 3 pages

Revised Change Order #16R, 7 World Trade Center, Nov 1998

Machine-extracted title · confidence 95%

Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.

NYC-WTC_000173881–000173883

Folder label: “7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Revised Change Order #16R

Page image
Scanned page image, NYC-WTC_000173882
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

6. Additional switching room 2330, included new and relocated wiring.

Electrical Cost $ 640.00

7. Per drawing E4-02 dated 9/25/98: (DELETED)

A. Add one (1) 200 amp, 3 pole and one (1) 70 amp 3 pole breaker in EDPL- 23E. B. Delete one (1) 3 pole 100 amp breaker in EDPL-23E. C. Revisti panel ULP-23W and ULP-R from 3 phase 4 wire to 1 phase three wire. D. Add one (1) 50 amp 2 pole breaker in panel ELP-23C1. E. Delete two (2) 15amp 1 pole breakers in panels ELP-23C1.

All panels have been delivered and installed with the branch circuitry and feeders. Panel EDPL23-E will have to be replaced in its entirety. All branch and feeder wiring will be removed and then re-installed. Panel ULP23W and R will also have to be replaced. New panels will be provided and re-installed. New breakers will be installed for panel ELP023C-1.

This above work has been changed by Cosentini's sketches FSK-2, 3, 4, 7 and 9 as per the following wiring changes and fusing changes:

Re-route eight (8) 1-pole circuits from ELP 23C to ELP 23C I and add one (1) 3-pole 100A CB to ELP 23C EDPL-23E - Add one (1) 3-pole 70A CB ELP-23W ~ Delete three (3) one pole 15 A CB's and one (1) 3-pole 70 A CB Change v/iring for UPS's from 2 #1,2 #2 and 1 #250 MCM to 3 #4, 1 #2/0 and 2 #4. ELP R - Delete three 1-pole 1 5 A CB's ELP R - Add one (1) three pole 50A and one (1) 3-pole 70A Downsize fusing in feeder disconnect from 150A to 70A As per FSK-8 add one (1) speaker/strobe Electrical Cost $ 3,800.00

Sub-total Electrical $17,065.00 Additional Cut and Patch $ 1,500.00 Subtotal $18,565.00 General Conditions $ 1,485.00 Overhead and Fee $ 1,203.00 Insurance $ 266.00 $21,519.00

NYC-WTC_000173882

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173882Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168645 · Box 7DCAS

Revised Change Order #16 submitted for electrical work at 7 World Trade Center dated October 19, 1998.

Similar indexed content

NYC-WTC_000173874 · Box 7DCAS

Change order #26 submitted for drywall work including closing door openings at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168607 · Box 7DCAS

Contractor submission for change order to close door openings and perform scar patching at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171808 · Box 7DCAS

Letter from DCAS submitting revised change order #26R for work at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →