← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Revised Change Order #16R
Document / 3 pages

Revised Change Order #16R, 7 World Trade Center, Nov 1998

Machine-extracted title · confidence 95%

Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.

NYC-WTC_000173881–000173883

Folder label: “7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Revised Change Order #16R

Page image
Scanned page image, NYC-WTC_000173881
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Silverstein Properties. Inc « niui fStin 7 World Trade Center New York, N Y. 10048 Telephone: 212-619-6569 Fax: 212-732-5190

November 19, 1998

Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007 RE: 7 World Trade Center Mayor's Office of Emergency Management-V, 7*, & 23"* Floors Revised Change Order #16R

Dear Mr. Pymento:

Attached please find revised change order #16 in the amount of $21,519.00 submitted by Ambassador Construction for the following scope of work.

As per electrical plans dated 9/3/98 and 9/25/98 representing revision changes #3 and #4:

1. On drawing El-23 dated 9/25/98, relocate panel ELP-23N3 in the Ian room. Panel and conduits previously installed. Electrical Cost $3,300.00

2. On drawing E3-01 dated 9/3/98, tap the secondary of the 75KVA transformer and feed a new 200amp switch with shunt trip. This is to redirect the feed to ATS #7 on the roof. Electrical Cost $4,810.00

3. Provide service connection to 208 volt single phase dishwasher per drawing El-23 dated 9/25/98. Electrical Cost $1,740.00 4. Add one (1) fire alarm pull station. Electrical Cost $ 950.00

5. Upgrade wiring to dimming panel from new breaker in panel EDPL-23E fed by a 70 amp breaker. Electrical Cost $1,825.00

NYC-WTC_000173881

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173881Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168645 · Box 7DCAS

Revised Change Order #16 submitted for electrical work at 7 World Trade Center dated October 19, 1998.

Similar indexed content

NYC-WTC_000173874 · Box 7DCAS

Change order #26 submitted for drywall work including closing door openings at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168607 · Box 7DCAS

Contractor submission for change order to close door openings and perform scar patching at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171808 · Box 7DCAS

Letter from DCAS submitting revised change order #26R for work at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →