NYC-WTC_000168639
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
4 shared non-person entities · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗Revised Change Order #16 submitted for electrical work at 7 World Trade Center dated October 19, 1998.
NYC-WTC_000168645–000168646Folder label: “7 World Trade Center Mayor's Office of Emergency Management- 1st, 7th, & 23rd Floors Change Order #16”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Silverstein Properties, I ric 7 World Trade Center New York, N.Y. 10048 telephone 212.-619-6569 Pax 212-/32-5190
October 19, 1998
Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007 RE: 7 World Trade Center Mayor's Office of Emergency Management-V‘, 7**, & 23'^ Floors Change Order #16_____________
Dear Mr, Pymento:
Attached please find revised change order #16 in the amount of $37,862.00 submitted by Ambassador Construction for the following scope of work.
As per electrical plans dated 9/3/98 and 9/25/98 representing revision changes #3 and #4:
1. On drawing El-23 dated 9/25/98, relocate panel ELP-23N3 in the Ian room. Panel and conduits previously installed. Electrical Cost $3,300.00
2. On drawing E3-01 dated 9/3/98, tap the secondary of the 75KVA transformer and feed a new 200amp switch with shunt trip. This is to redirect the feed to ATS #7 on the roof. Electrical Cost $4,310.00
3. Provide service connection to 208 volt single phase dishwasher per drawing El-23 dated 9/25/9. Electrical Cost $1,740.00 4. Add one (1) fire alarm pull station. Electrical Cost $ 950.00
5. Upgrade wiring to dimming panel from new breaker in panel EDPL-23E fed by a 70 amp breaker. Electrical Cost $1,825.00
NYC-WTC_000168645
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000168639
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
4 shared non-person entities · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173881
Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.
4 shared non-person entities · Same agency, volume and box · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171903
Ambassador Construction submits Change Order #018 for electrical work at the Mayor's Office of Emergency Management on October 15, 1998.
2 shared non-person entities · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168647
Change Order #16 submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated October 15, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173884
Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168630
Change order to provide 277-volt power for fan power boxes by removing existing wiring at 7 World Trade Center.
4 shared non-person entities · Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171900
Quotation for electrical modifications including panel relocation, transformer work, dishwasher connection, and fire alarm.
Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173820
Letter submitting Change Order #20 for $12,866 to provide power for fan power boxes at 7 World Trade Center.
4 shared non-person entities · Same agency, volume and box · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173869
Change order #28 submitted to modify electrical work for independent feeding of ELP-23N equipment.
4 shared non-person entities · Same agency, volume and box · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168471
City correspondence reviewing and negotiating costs for numerous submitted change orders related to facility work.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
Similar indexed content
Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.
Similar indexed content
Ambassador Construction submits Change Order #018 for electrical work at the Mayor's Office of Emergency Management on October 15, 1998.
Similar indexed content
Change Order #16 submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated October 15, 1998.
Similar indexed content
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Similar indexed content